Powered By Kitlog Pro v2.0
Jim's Web Site
RV-7
Fuselage
Work Logs Found:
14
Category Work Time:
97 Hours
Date
Hours
Work Log Summary
Details
05-04-2024
15.00
Gear leg and Wheel installation
12-19-2023
14.00
Cowling Mount
Details
01-27-2023
8.00
Installation of Glare Shield
Details
03-13-2015
6.00
ELT and Strobe Generator Bracket Relocation
Details
03-12-2015
5.00
Vent Installation
03-08-2015
4.00
TCW Safety Trim Module
Details
03-08-2015
3.00
Map Box
Details
03-07-2015
6.00
Aleron Electronic Trim Kit
Details
03-05-2015
4.00
Flap Positioning System
Details
03-01-2015
6.00
Panel Side Attach Brackets
Details
02-27-2015
3.00
Rudder Cable Sheathing Retention
02-22-2015
7.00
Rudder and Brake Pedal Assembly
Details
02-06-2015
6.00
Rudder Pedal Brace F-6118
Details
01-04-2015
10.00
Static LineInstallation
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
100
1161
Avionics
17
363
Canopy
5
64
Canopy
4
62
Controls
6
21
Empennage
14
76
Engine
12
63
Firewall
4
27
Fuselage
14
97
Landing Gear/Brakes
1
3
Lighting
1
9
Lighting
1
5
None
2
1
Panel
17
363
Wings
1
2
Wiring
1
5
Copyright © 2001-2024 Matronics. All Rights Reserved.