Powered By Kitlog Pro v2.0
GEORGE'S WEB SITE
CH750
Flaps and Slats
Work Logs Found:
18
Category Work Time:
51 Hours
Date
Hours
Work Log Summary
Details
08-06-2014
6.00
Fabricated internal structures of STOL Slats
Details
07-07-2014
2.00
riveted all flaperons
Details
07-07-2014
2.00
packed assembled flaperons
Details
07-06-2014
2.00
prepped right o/b Flaperon
Details
07-05-2014
2.00
prepped left o/b Flaperon
Details
07-04-2014
2.00
Prepped right i/b flaperon
Details
07-03-2014
2.00
Prepped the left i/b flaperon
Details
07-02-2014
2.00
Drilled and fabricated the right outboard flaperon
07-01-2014
2.00
fabricated and drilled left outboard flap
Details
06-29-2014
4.00
Fabricated and drilled right I/B Flaperon
Details
06-28-2014
8.00
Assembled ribs Left I/B Flaperon
Details
06-20-2014
1.00
Unpack Skin, Prepare 75A2-3
Details
06-15-2014
4.00
Fabricate and Rivet 75A2-1
Details
06-08-2014
3.00
Riveted Flaperon Spars
06-01-2014
3.00
Completed drilling, deburring of spar
Details
05-18-2014
2.00
Deburred, Drilling
Details
05-10-2014
2.00
Flaperon frame assembly
03-15-2014
2.00
Inventoried Kit
Details
SITE NAVIGATION
Contact Builder
CH750 Home
Category
# Logs
# Hours
All
75
215
Flaps and Slats
18
51
Shop Supplies
1
6
Tail
41
89
Tools
4
7
Wings
11
62
Copyright © 2001-2024 Matronics. All Rights Reserved.