KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
Work Logs Found: 16
Category Work Time: 36 Hours
 Date
Hours
Work Log Summary

Details

 11-03-2014
1.00
Final fab attach bolts and heat door cable secure
Details
       

 10-31-2014
1.50
FInish the seal on the FAB, oil and install filter
Details
       

 10-30-2014
3.00
fab baffle seal
Details
       

 08-28-2014
2.50
FAB filter bypass door and carb heat door cables r
Details
       

 08-26-2014
1.50
rivit the FAB shell to the top plate
       

 07-01-2014
1.50
Fab heat door-1
Details
       

 06-25-2014
2.00
rivit holes to top plate and cut in carb heat hole
Details
       

 06-03-2014
1.50
Sanded vertical splice gap and top edge
Details
       

 05-24-2014
0.50
Air box slit glassed in -1
Details

 05-21-2014
0.50
Cut FAB for vertical alignment
Details
       

 05-02-2014
3.00
FAB work
Details
       

 04-26-2014
0.50
Fab alt air door finished
Details
     

 04-24-2014
5.00
FAB retainer clips-2 and Alt air bypass inlet-1
Details
       

 04-23-2014
5.50
FAB top plate alignment and drilling
Details
       

 04-22-2014
4.50
Alternate air cable, Fab mount, Fab fab upper plat
Details
       

 04-20-2014
1.50
Started the FAB
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.