KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
Work Logs Found: 25
Category Work Time: 88 Hours
 Date
Hours
Work Log Summary

Details

 11-12-2017
7.00
100 hour engine maintenance
Details
       

 04-15-2017
2.00
25-hour oil change
Details
       

 03-05-2017
1.00
Checked carburetor floats
Details
       

 11-06-2016
5.00
Taxi test, brake tests, compass calibration
Details
       

 10-30-2016
6.00
Check carb bowls, installed all parts for W&B
Details
       

 10-29-2016
7.00
Pneumatic carb sync, fixed low fuel pressure
Details
       

 10-28-2016
5.50
Troubleshooting low fuel pressure
Details

 10-23-2016
2.00
Setting idle speed
Details
     

 10-19-2016
1.00
Adjusted idle speed and engine run up
Details
     

 10-16-2016
1.00
Setting engine idle speed
Details

 10-15-2016
3.50
Mechanical Carburetor synchronization
Details
       

 10-01-2016
7.00
First Engine Start
Details
       

 06-04-2016
4.50
Fixed Pitot System leak, Canopy Fairing work
Details
       

 05-21-2016
2.00
Purging of the Oil System, New Aux Music Jack
Details
       

 05-15-2016
3.00
Purged engine oil system
Details
       

 05-14-2016
2.00
Put coolant in engine, work on Canopy Fairing
Details
       

 06-21-2014
5.50
Installed cooling shroud and drip trays
Details
       

 06-20-2014
4.00
Installed Engine Mount Ring & canopy latch wiring
Details
       

 06-11-2014
0.50
Painted the drip trays
Details
     

 05-31-2014
4.00
Assembled Drip Trays
Details
       

 05-26-2014
2.50
Work on cooling shroud and drip trays
Details
       

 05-25-2014
5.50
Engine cooling shroud work
Details
       

 05-24-2014
4.00
Started work on Rotax 912 ULS
Details
       

 02-26-2014
2.50
Inventoried Firewall Fwd parts
Details
       

 02-18-2014
0.50
Firewall Forward kit arrived
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.