Powered By Kitlog Pro v2.0
Peters Web Site
Sling4
Empennage
Work Logs Found:
28
Category Work Time:
67 Hours
Date
Hours
Work Log Summary
Details
11-08-2023
6.00
Electric Trim.
Details
09-06-2023
3.00
Hardware.
Details
03-04-2022
1.00
Vertical Stab. Fairing.
Details
02-02-2022
4.00
Rear Stabilizer Fairing.
Details
01-29-2022
2.00
Vertical Stabilizer Fairing.
Details
01-29-2022
2.00
Vertical Stabilizer Fairing.
Details
05-10-2020
2.00
Vertical Stab. Fairing.
Details
05-10-2020
2.00
Vertical Stab. Fairing.
Details
05-08-2020
2.00
Control Cable Cover.
Details
05-03-2020
2.00
Empennage.
Details
05-03-2020
2.00
Empennage.
Details
04-25-2020
2.00
Empennage.
Details
04-25-2020
2.00
Empennage.
Details
02-03-2019
1.00
Rudder.
Details
02-03-2019
1.00
Rudder.
Details
01-20-2019
1.00
Empennage
Details
01-20-2019
1.00
Empennage
Details
01-20-2019
1.00
Empennage
Details
05-10-2018
1.00
Empennage Control Cover.
Details
05-09-2018
1.00
Empennage Control Cover.
Details
05-09-2018
1.00
Empennage Control Cover
Details
05-02-2014
6.00
A very busy day with horizontal stab.
04-30-2014
6.00
Spent all day preparing horizontal stab components
04-29-2014
4.00
Deburring horizontal elevator
04-23-2014
3.00
Painting Elevator Spar, took a couple of goes to
04-22-2014
3.00
Alodining
04-20-2014
3.00
finished deburring and scotch briting
04-18-2014
2.00
deburring
SITE NAVIGATION
Contact Builder
Sling4 Home
Category
# Logs
# Hours
All
1311
3140
Avionics
137
349
Canopy
16
51
Electrical
37
117
Electrical
35
80
Empennage
28
67
Engine
191
496
Firewall
35
80
Flight Controls
31
94
Flight Controls.
41
88
Front Windscreen
37
86
Fuel System
32
85
Fuel System
14
49
Fuel Tanks
32
85
Fuselage
172
389
Miscellaneous
99
109
None
31
94
Painting
52
100
Prop
1
1
Propeller
52
100
Propeller
1
1
Tools
6
8
Undercarriage
32
85
Undercarriage
41
88
Upholstery
37
86
Upholstery
31
94
Windscreen
16
51
Wings
74
207
Copyright © 2001-2024 Matronics. All Rights Reserved.