Norris's RV Construction
RV14a
Empennage
Work Logs Found:
90
Category Work Time:
408 Hours
Date
Hours
Work Log Summary
Details
02-22-2017
7.50
Empenage fairing ready to screw on
01-25-2017
9.00
Making new rudder
01-24-2017
5.00
Inventoried and started the new rudder
12-09-2016
2.00
Install Horizontal stabalitor and elivator
02-18-2016
4.00
Install winshild deice spray bar
05-18-2015
7.00
Painted the Horz Stab and elevators
12-05-2014
5.00
Prepare wing ribs (deburr, flute, dimple)
11-20-2014
1.00
Replaced elevbator trim connector link.
Details
10-29-2014
2.00
Final fiberglass ofvertical stab cap. Start updack
10-28-2014
6.50
Elevator adjustment and gap faring
Details
10-27-2014
2.50
Third step fiberglassing end caps
10-26-2014
3.00
Second step of fiberglassing
10-25-2014
1.00
Initial firberglassing of end caps
10-24-2014
3.50
Preparing end caps for fiberglassing
10-23-2014
2.00
1.5 hrs trying to put in Vans update rivet. Starte
10-22-2014
7.00
Rudder top cap and elivators end caps
10-21-2014
3.00
Rudder bottom cap. Van's Oct 14 plans update.
10-20-2014
5.00
Prepare rudder faring
10-17-2014
5.50
Final rudder and elevator adjustments
10-16-2014
5.00
Install vertical stab and start install of ruddder
10-15-2014
5.00
set up elevators and mount Horz Stab on the tailco
10-14-2014
6.50
Fitting of elevators to horizontal stabalizer
10-08-2014
2.00
Finished riveting the top skin on the aft fuselage
10-07-2014
4.00
Finish riveting the side skins.Riveting on the top
10-03-2014
5.00
Completed riviting L rear topside and started R re
10-02-2014
5.50
Started riviting on the left rear top skin
10-01-2014
8.00
Finished back deck and started top skin
09-30-2014
5.00
Installed ant cables. Began installing rear deck.
09-25-2014
3.50
Installed rudder cable guides and replaced some ri
Details
09-24-2014
7.00
Continue riveting aft fuselage plus nutplates
09-23-2014
5.50
Continued riveting the aft fuselage
09-22-2014
5.50
Continue riveting theaft hull
09-19-2014
3.00
Riveting onaft fuselage
09-18-2014
3.00
Prepping for another riveting session.
Details
09-16-2014
2.00
Riveted 2/3 of the right side
Details
09-15-2014
3.00
Riveted F01411 and F01410 to bottom skin
09-10-2014
4.50
Aft most bulkhead riveted to lower tail piece
09-09-2014
2.00
strung in two wiring harnesses
09-08-2014
8.00
continue building the tail empennage
09-05-2014
6.00
Begin riveting the tailcone together
09-04-2014
8.50
contructed two tailcone ribs
Details
08-13-2014
2.50
Construct Vert stabalizer connecting rib
07-25-2014
4.00
Made rudder stop parts
Details
07-22-2014
6.00
Prepare parts for tail cone
07-18-2014
4.00
Elevator trim wiring and close front of elevators
07-17-2014
2.00
Cutting the elevator counter weights to size
07-15-2014
8.00
Continue final riveting of elevators
07-14-2014
7.00
Applied tank sealer for ribs and closed
Details
07-11-2014
6.50
Continued riveting the left elevator
07-10-2014
6.50
Dimple and begin riviting or Left elevator
07-09-2014
1.00
Started dimpling the Left elivator
06-27-2014
2.00
Working on parts for trim tab
06-23-2014
5.50
Riveted bottom of the trim tab
Details
06-19-2014
4.00
Work on trim tab
06-13-2014
2.00
Continue riveting Right elevator
06-12-2014
8.00
Begin riveting right elevator
06-11-2014
4.50
Deburring and dimpling right erlevator
06-09-2014
4.00
elivator assembled with cleko's
06-05-2014
5.00
Elivavator trim hinge
Details
06-03-2014
7.00
Progress on the elevator
Details
06-02-2014
5.50
Start elevator
05-30-2014
2.00
Finished riveting the horizontal stabalizer
05-29-2014
3.50
Started riveting the aft spar
05-28-2014
5.50
Continue riveting the horizontal empennage togethe
05-27-2014
6.00
Continued riveting horizontal stabilizer
05-23-2014
9.00
Nose ribs riveted to skin and to rib assembly
Details
05-21-2014
4.00
Horizontal stabilizer structure
05-20-2014
3.00
Finished dimpling the skins. Started riveting ribs
05-19-2014
7.00
Horizontal Stabalizer
Details
05-17-2014
2.50
Finish riviting the gussets to the forward spar
05-16-2014
3.00
Working on the stiffiners for the front spar
05-14-2014
3.50
Start on Horz Stab forward spar
05-13-2014
5.00
Start Horz Stab
05-08-2014
3.50
Finish Rudder and Start Horizontal Stab
05-06-2014
6.00
Rudder almost done
Details
05-05-2014
6.00
Begin Riveting Rudder together
05-02-2014
5.50
Start the reassemble of the rudder with rivets
05-01-2014
4.50
Disassembled rudder, deburred, Dimpled 400 holes
04-30-2014
6.00
Drill out every hole, disassemble, debure
04-29-2014
4.50
Rudder initial cleco assembly
04-24-2014
6.00
Started rudder
04-23-2014
3.00
Final Riveting of VS
Details
04-22-2014
5.00
Dimpling and Start Riveting VS
04-17-2014
5.00
Start Riviting Process
Details
04-16-2014
2.00
Disasemble and debur
04-05-2014
4.00
Figured out fluting and did initial covering of VS
Details
04-04-2014
2.00
Start working on step 2
03-30-2014
1.50
pg 06-02 doubler install
03-22-2014
3.00
Inventory kit
Details
03-13-2014
2.00
empennage and wing kits delivered
Details
SITE NAVIGATION
Contact Builder
RV10 Home
RV14a Home
Category
# Logs
# Hours
All
609
3147
10 Interior
1
128
Avionics
90
485
De Ice
33
170
Empennage
90
408
Engine
6
30
Finish Kit
62
338
Firewall Forward
65
379
Fuselage
72
378
Inspection
7
24
Miscellaneous
18
89
None
1
3
Paint
52
251
Shop
4
Wings
108
464