Powered By Kitlog Pro v2.0
Brendons Kit Log
RV-10
Fuel Tanks
Work Logs Found:
17
Category Work Time:
92 Hours
Date
Hours
Work Log Summary
Details
03-29-2014
6.00
Install back baffle and Z brackets, right tank
Details
03-15-2014
2.00
Leak check left tank
Details
03-08-2014
6.00
Install right tank attach bracket, inboard rib
Details
02-15-2014
6.00
Install right tank stiffener
Details
02-08-2014
8.00
Install right fuel tank ribs
Details
02-01-2014
8.00
Install right tank stiffeners, left tank back baff
Details
01-25-2014
8.00
Leak check left tank, dimple right tank skin
Details
01-19-2014
4.00
Start right fuel tank
Details
01-18-2014
8.00
Install inboard tank attach bracket
Details
01-04-2014
6.00
Install fuel tank ribs
Details
12-29-2013
6.00
Install tank ribs
Details
12-14-2013
8.00
Install tank stiffeners and fuel cap flange
Details
11-02-2013
2.00
Rivet inboard tank attach bracket
Details
10-02-2013
2.00
Prepare tank parts
Details
09-21-2013
7.00
Drill and C/S back plate, install Z brackets
Details
09-14-2013
4.00
Assemble and match drill fuel tank
09-13-2013
1.00
Prepare tank parts
Details
SITE NAVIGATION
RV-10 Home
Category
# Logs
# Hours
All
488
1672
Aileron
8
34
Doors
16
83
Electrical
16
66
Elevator
24
64
Empennage
15
56
Engine
17
72
Finishing
37
109
Firewall
4
11
Flaps
12
42
Fuel Tanks
17
92
Fuselage
130
461
HS
18
54
Inspection
1
Interior
15
64
Landing Gear
5
19
Miscellaneous
1
Moving
3
8
Panel
5
16
Practice
5
8
Prop
6
12
Rudder
13
34
Tailcone
32
78
Tools
1
VS
11
26
Windows
9
41
Wing - LEFT
28
87
Wing - RIGHT
22
69
Wings
17
66
Copyright © 2001-2024 Matronics. All Rights Reserved.