Powered By Kitlog Pro v2.0
Baker's RV-6
RV-6
Control Systems
Work Logs Found:
8
Category Work Time:
12 Hours
Date
Hours
Work Log Summary
Details
05-10-2014
1.00
Interference of Control Rod and Roll Servo
Details
04-22-2014
0.50
Tightened Aileron Jam Nut/Pitot Heat Control Box
Details
03-30-2014
1.50
Applied Cotter Pins to Right Rudder Cable Screws
Details
03-29-2014
2.00
Roll Servo Control Rod Bolted to Control Stick
Details
03-28-2014
3.00
Control Stick Bolts Tightened and Torqued
Details
03-24-2014
0.10
Evaluated Control Stick Movement-Visitor
Details
03-08-2014
2.50
Bolted Center Control Rod to Spar Brackets
Details
03-08-2014
1.50
Assisted with Bolting Control Rod to Brackets
Details
SITE NAVIGATION
Contact Builder
RV-6 Home
Category
# Logs
# Hours
All
3121
5540
Avionics
4
6
Canopy
334
544
Control Systems
8
12
Cowling
164
199
Empennage
326
666
Engine
84
124
Finish Kit
9
17
Firewall Forward
353
570
Flight Training
1
7
Fuselage
643
1225
Inspection
1
0
Instrument Panel
142
227
Interior
4
8
Landing Gear
28
46
Miscellaneous
22
13
Painting
113
256
Prop
3
4
Shop Construction
50
24
Systems
11
35
Tools
1
0
Weighing
8
7
Wings
686
1334
Wiring
126
216
Copyright © 2001-2024 Matronics. All Rights Reserved.