Powered By Kitlog Pro v2.0
PETER'S WEB SITE
Tri Gear
Wings
Work Logs Found:
39
Category Work Time:
140 Hours
Date
Hours
Work Log Summary
Details
10-19-2015
4.00
Fit wing farings and faring rubber to wings.
10-14-2015
2.00
Worked at rigging the flight controls. see detial
Details
10-10-2015
2.00
Riveted the wing tips and see detaild.
Details
10-07-2015
4.00
Installed Ailerons and Flaps on the wings.
09-04-2015
3.00
Drill tips and installed lights.
08-12-2015
5.00
See details
Details
08-04-2015
2.00
See details
Details
08-03-2015
4.00
See Details
Details
08-02-2015
1.00
Cut and fit the wing tips.
Details
06-02-2014
3.00
Rich & Peter drilled wing attachment holes again.
05-29-2014
2.00
Put wings together and drilled attachment hole.
05-22-2014
5.00
See Detailes
Details
05-17-2014
2.00
See Detailed Description
Details
05-03-2014
5.00
Rich and Peter finished installing the wings.
Details
04-30-2014
5.00
Rich and Peter worked on installing wings.
04-28-2014
5.00
Set wings up for installation.
Details
04-24-2014
1.00
Worked on wing attachments.
04-22-2014
3.00
Worked on preparing wings to be installed.
Details
04-21-2014
4.00
Rich and Peter worked on wings
Details
04-19-2014
4.00
Worked at installing wings
Details
04-07-2014
6.50
Rich & Peter worked on left wing.
Details
04-05-2014
5.00
Rich and Peter installed left leading edge.
04-04-2014
3.00
Rich & Peter riveted left skin aft skins.
04-02-2014
4.50
Rich and Peter worked on right wing.
Details
04-01-2014
3.00
Worked on left wing.
Details
03-31-2014
6.50
Worked on left wing
Details
03-26-2014
3.50
Continued work on left wing.
Details
03-24-2014
2.00
Wired the wing and installed airspeed tubes
03-24-2014
3.50
Installed leading edge of right wing.
Details
03-22-2014
4.50
Rich & Peter worked on wings
Details
03-21-2014
1.00
Rich & Peter worked on leading edge.
03-19-2014
3.50
Rich and Peter removed leading edge to finish it.
Details
03-17-2014
6.00
Installed leading edge of right wing.
03-15-2014
2.50
Riveted top right wing skin and started leading ed
03-14-2014
3.00
Work on right wing.
Details
03-12-2014
3.00
Finished deburing right wing and revited lower aft
03-10-2014
4.00
Rich & Peter worked on wings.
Details
03-08-2014
6.00
Rich & Peter worked on deburing wings.
03-07-2014
3.00
Rich & Peter Worked on installing flaps & Ailerons
SITE NAVIGATION
Contact Builder
Tri Gear Home
Category
# Logs
# Hours
All
289
1297
Aileron
9
34
Avionics
20
54
Brakes & Landing
17
50
Canopy
7
29
Controls
2
2
Cowling & Canopy
33
105
Empennage
11
52
Engine
34
121
Flaps
4
20
Fuel & Elec
13
48
Fuselage
27
106
Instrument Panel
2
8
Miscellaneous
61
468
Tail Kit
10
60
Wings
39
140
Copyright © 2001-2024 Matronics. All Rights Reserved.