KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
Work Logs Found: 37
Category Work Time: 97 Hours
 Date
Hours
Work Log Summary

Details

 12-14-2014
1.00
center front baffle seals rivited and ore adjustin
Details

 12-12-2014
1.25
Baffle seals front right
Details
     

 12-11-2014
0.00
remove screen from inlet bafffle as per service bu
Details
     

 12-11-2014
2.00
Baffle gap seals front and fwd sides
Details
       

 12-07-2014
1.50
Rivit on baffle seals on 3 sides
Details

 12-06-2014
2.00
FWD baffle gap seal s
Details
       

 11-04-2014
3.00
engine baffle seals-1
Details
       

 06-26-2014
0.50
covered the unneeded scat tube flange in aft baffl
Details
     

 06-04-2014
1.75
Left side tension rods revisited
Details
     

 05-30-2014
1.25
rt side baffle tension rods finished and installed
Details
       

 05-30-2014
0.25
Rivit the ram air intake flanfe to front baffle ra
Details
     

 05-24-2014
0.75
New ram air intake cut in to intake ramp
Details
       

 04-02-2014
5.00
Rivit baffles and install gussets to baffles
Details
       

 03-30-2014
5.00
Rivit no 4
Details
       

 03-29-2014
5.00
Refit the left aft baffles to cowling and fit oil
Details

 03-15-2014
1.50
redo cylinder 2/oilcooler baffles-1
Details

 03-10-2014
3.50
Finish Front baffle fit to upper inlet duct and mi
Details
       

 03-09-2014
3.50
Upper cowl inlet ducts-1
Details
       

 03-08-2014
7.00
baffles trim to upper cowl-3 and some rework items
Details
       

 03-08-2014
0.00
additional pics
       

 03-07-2014
5.00
Trimming baffles to top cowl-2
Details
       

 03-07-2014
0.00
baffle trim to top cowl-2 additional pics
Details
       

 03-06-2014
5.00
cutting baffles to fit upper cowl-1
Details
       

 03-01-2014
4.50
Cut in ignition wire holes to rear baffles. More r
Details
       

 02-26-2014
1.00
Ramp stiffner and front baffle clip rivitting
Details
     

 02-25-2014
5.50
Front baffle bend adjust and bracket drilling and
Details
       

 02-24-2014
4.50
baffle ramp brackets and angles and fitting cont.
Details
       

 02-23-2014
5.00
front baffle fit and support bkt and clip fab
Details
       

 02-22-2014
2.50
Inlet ramps 2 and fwd baffles-2
Details
       

 02-21-2014
5.00
Inlet ramps trim and bend etc
Details
       

 02-20-2014
4.00
Baffles and ramps
Details
       

 02-16-2014
0.50
baffle support bracket
Details

 12-01-2013
2.50
baffle-5
Details
       

 11-30-2013
1.00
baffle 4
Details
     

 11-24-2013
2.00
Baffle-3
Details
       

 11-23-2013
2.00
Baffle-2. The oil cooler bracket
Details
       

 11-18-2013
1.50
Baffle kit started
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.