KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
Work Logs Found: 86
Category Work Time: 194 Hours
 Date
Hours
Work Log Summary

Details

 07-28-2014
3.00
Repaired CDI control
Details
     

 02-05-2014
2.00
Fabricated battery box
Details
       

 01-20-2014
3.00
CDI problem
Details
     

 05-20-2011
4.00
Riveted top and nose skins back in place
Details
       

 05-12-2011
3.00
Installed balance weight
Details
     

 05-10-2011
2.00
Began reinstallation of nose skin
Details
       

 05-04-2011
4.00
Finished installing modified nose ribs
Details
       

 04-22-2011
3.90
Added stiffners to upper skin
Details
       

 04-20-2011
0.70
Drilled upper skin mounting holes through 6ZU1-2
Details
     

 04-17-2011
4.10
Prepared Extrusion angle and nose ribs for install
Details
       

 04-15-2011
0.80
Bolt wing root doubler into position.
Details
       

 04-14-2011
2.30
Prepare installation of wing root doubler
Details
       

 04-09-2011
2.00
Drilled out AN3 rivets used to assemble spar
Details
       

 04-08-2011
0.50
Removed nose ribs 1-3 for modification
Details
     

 04-07-2011
1.10
Removed stbd wing nose skins and fuel tank
Details
     

 04-05-2011
2.10
Rivet stiffners
Details
       

 04-02-2011
0.90
Close aileron & install reinforcements
Details
       

 04-01-2011
5.10
Install balance arm
Details
       

 03-31-2011
0.50
Remove aileron rivets
Details
       

 03-26-2011
2.50
Reinforce bellcrank
Details
       

 03-25-2011
1.90
Cut wing stiffners and cleco in place
Details
       

 03-23-2011
3.00
Riveted rear wing spar reinforcements
Details
       

 03-22-2011
2.50
Positioned 6ZU1-7,8 and 6's
Details
       

 03-22-2011
2.00
Drilled new rivet holes in 6ZU1
Details
       

 03-21-2011
1.50
Finished removing upper skin rivets
Details
       

 03-19-2011
2.50
Started stbd wing mod
Details
       

 03-12-2011
10.00
Reinstalled wing skin and nose skin
Details
       

 03-10-2011
0.50
Reinstalled port fuel tank
Details
       

 03-10-2011
0.50
Reconnected aileron trim cable
Details
     

 03-10-2011
0.50
Installed aileron and balance weights
Details
     

 03-09-2011
1.30
Install Extrusion 6Z1-1
Details
       

 03-05-2011
1.90
Cut and drilled upper port stiffners
Details
       

 03-05-2011
0.40
Added mass balance protection to upper skin
Details
       

 03-04-2011
4.00
rivet stiffners to bottom port wing skin
Details
       

 02-17-2011
3.10
Added reinforcements to nose rib 1
Details
       

 02-16-2011
7.30
Added reinforcements to nose ribs 2 and 3
Details
       

 02-10-2011
1.70
Prepared installation of Wing Root Doubler
Details
       

 02-08-2011
3.90
Prepared wing root doubler 6ZU1-1 for installation
Details
       

 02-07-2011
1.20
Replaced rivets in port aileron
Details
       

 02-07-2011
0.50
Balanced aileron
Details
       

 01-31-2011
3.40
Mounted added ribs in aileron
Details
       

 01-29-2011
1.90
Cut holes for balance arm
Details
       

 01-28-2011
3.50
Drilled mounting holes in added ribs
Details
       

 01-27-2011
1.10
Prepared various parts for installtion in port ail
Details
       

 01-27-2011
1.30
Prepared stiffners for aileron
Details
       

 01-26-2011
2.80
Riveted rear spar stiffners
Details
       

 01-24-2011
1.50
Removed, cleaned. and primed 6ZU1-6,7, and 8
Details
       

 01-24-2011
2.50
Made installation provisions for 6ZU1-7, and inboa
Details
       

 01-22-2011
2.00
Prepared inboard 6ZU1-6 for installation
Details
       

 01-22-2011
1.70
Prepare aileron hole doubler
Details
       

 01-21-2011
2.50
Added skin stiffners
Details
       

 01-20-2011
2.10
Replaced bellcrank mount
Details
       

 01-19-2011
1.10
Removed first two nose ribs
Details
     

 01-15-2011
3.70
Added provisions for extrusion 6ZU1-1
Details
     

 01-14-2011
4.00
Removed port top front spar stiffner
Details
       

 01-06-2011
1.00
Removed upper wing skin
Details
       

 01-06-2011
2.10
Removed rivets from leading edge of port wing.
Details
       

 01-05-2011
4.10
Removed upper port wing skin rivets
Details
       

 03-09-2010
3.90
Added seat modifications
Details
       

 03-06-2010
0.50
Rework of aileron control stop
Details
     

 03-06-2010
3.50
Reinstalled fuselage parts
Details
       

 03-06-2010
0.70
Installed "Z" angle stiffner
Details
       

 03-05-2010
4.30
Installed bottom skin doubler 6ZU2-9
Details
       

 03-04-2010
3.10
Installed center-spar fuselage connection mods
Details
       

 03-02-2010
2.10
Fabbed and installed side doublers
Details
       

 03-01-2010
2.10
rework center spar
       

 03-01-2010
2.70
rework center spar
Details
       

 02-22-2010
1.70
Installed replacement port attach plate
Details
       

 02-21-2010
2.50
Installed replacement stbd attach plate
Details
       

 02-19-2010
3.50
Installed aileron stop
Details
       

 02-18-2010
1.00
Riveted uprights in place
Details
       

 02-18-2010
1.50
Riveted upper stiffner to front of center spar
Details
       

 02-17-2010
0.70
riveted remaining part of aft center spar
Details
       

 02-17-2010
1.50
Drilled rivet holes in added stiffner
Details
     

 02-08-2010
1.50
began riveting rear center spar
Details
     

 02-07-2010
2.50
Transferred hole for AN5 bolts to doublers
Details

 02-06-2010
2.10
Mounted 6ZU2-4's on back of center spar
Details
       

 02-06-2010
1.50
fabricated 6ZU2-4
Details
       

 02-06-2010
3.00
Drilled doublers on back of center spar
Details

 02-05-2010
2.00
Removed remaining caps from center spar
Details
       

 02-05-2010
1.40
Drilled 6ZU2-7
Details
     

 02-05-2010
1.50
Drilled 6ZU2-1
Details
       

 01-06-2010
1.00
Separate center spar for modification
Details
       

 01-06-2010
1.40
Remove center spar
Details
       

 12-03-2009
0.20
Removed dual control provisions
Details
     

 12-02-2009
0.80
Removed pilot seat for Zenith modification
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.