Powered By Kitlog Pro v2.0
Jims Web Site
601XLB
Ignition
Work Logs Found:
86
Category Work Time:
194 Hours
Date
Hours
Work Log Summary
Details
07-28-2014
3.00
Repaired CDI control
Details
02-05-2014
2.00
Fabricated battery box
Details
01-20-2014
3.00
CDI problem
Details
05-20-2011
4.00
Riveted top and nose skins back in place
Details
05-12-2011
3.00
Installed balance weight
Details
05-10-2011
2.00
Began reinstallation of nose skin
Details
05-04-2011
4.00
Finished installing modified nose ribs
Details
04-22-2011
3.90
Added stiffners to upper skin
Details
04-20-2011
0.70
Drilled upper skin mounting holes through 6ZU1-2
Details
04-17-2011
4.10
Prepared Extrusion angle and nose ribs for install
Details
04-15-2011
0.80
Bolt wing root doubler into position.
Details
04-14-2011
2.30
Prepare installation of wing root doubler
Details
04-09-2011
2.00
Drilled out AN3 rivets used to assemble spar
Details
04-08-2011
0.50
Removed nose ribs 1-3 for modification
Details
04-07-2011
1.10
Removed stbd wing nose skins and fuel tank
Details
04-05-2011
2.10
Rivet stiffners
Details
04-02-2011
0.90
Close aileron & install reinforcements
Details
04-01-2011
5.10
Install balance arm
Details
03-31-2011
0.50
Remove aileron rivets
Details
03-26-2011
2.50
Reinforce bellcrank
Details
03-25-2011
1.90
Cut wing stiffners and cleco in place
Details
03-23-2011
3.00
Riveted rear wing spar reinforcements
Details
03-22-2011
2.50
Positioned 6ZU1-7,8 and 6's
Details
03-22-2011
2.00
Drilled new rivet holes in 6ZU1
Details
03-21-2011
1.50
Finished removing upper skin rivets
Details
03-19-2011
2.50
Started stbd wing mod
Details
03-12-2011
10.00
Reinstalled wing skin and nose skin
Details
03-10-2011
0.50
Reinstalled port fuel tank
Details
03-10-2011
0.50
Reconnected aileron trim cable
Details
03-10-2011
0.50
Installed aileron and balance weights
Details
03-09-2011
1.30
Install Extrusion 6Z1-1
Details
03-05-2011
1.90
Cut and drilled upper port stiffners
Details
03-05-2011
0.40
Added mass balance protection to upper skin
Details
03-04-2011
4.00
rivet stiffners to bottom port wing skin
Details
02-17-2011
3.10
Added reinforcements to nose rib 1
Details
02-16-2011
7.30
Added reinforcements to nose ribs 2 and 3
Details
02-10-2011
1.70
Prepared installation of Wing Root Doubler
Details
02-08-2011
3.90
Prepared wing root doubler 6ZU1-1 for installation
Details
02-07-2011
1.20
Replaced rivets in port aileron
Details
02-07-2011
0.50
Balanced aileron
Details
01-31-2011
3.40
Mounted added ribs in aileron
Details
01-29-2011
1.90
Cut holes for balance arm
Details
01-28-2011
3.50
Drilled mounting holes in added ribs
Details
01-27-2011
1.10
Prepared various parts for installtion in port ail
Details
01-27-2011
1.30
Prepared stiffners for aileron
Details
01-26-2011
2.80
Riveted rear spar stiffners
Details
01-24-2011
1.50
Removed, cleaned. and primed 6ZU1-6,7, and 8
Details
01-24-2011
2.50
Made installation provisions for 6ZU1-7, and inboa
Details
01-22-2011
2.00
Prepared inboard 6ZU1-6 for installation
Details
01-22-2011
1.70
Prepare aileron hole doubler
Details
01-21-2011
2.50
Added skin stiffners
Details
01-20-2011
2.10
Replaced bellcrank mount
Details
01-19-2011
1.10
Removed first two nose ribs
Details
01-15-2011
3.70
Added provisions for extrusion 6ZU1-1
Details
01-14-2011
4.00
Removed port top front spar stiffner
Details
01-06-2011
1.00
Removed upper wing skin
Details
01-06-2011
2.10
Removed rivets from leading edge of port wing.
Details
01-05-2011
4.10
Removed upper port wing skin rivets
Details
03-09-2010
3.90
Added seat modifications
Details
03-06-2010
0.50
Rework of aileron control stop
Details
03-06-2010
3.50
Reinstalled fuselage parts
Details
03-06-2010
0.70
Installed "Z" angle stiffner
Details
03-05-2010
4.30
Installed bottom skin doubler 6ZU2-9
Details
03-04-2010
3.10
Installed center-spar fuselage connection mods
Details
03-02-2010
2.10
Fabbed and installed side doublers
Details
03-01-2010
2.10
rework center spar
03-01-2010
2.70
rework center spar
Details
02-22-2010
1.70
Installed replacement port attach plate
Details
02-21-2010
2.50
Installed replacement stbd attach plate
Details
02-19-2010
3.50
Installed aileron stop
Details
02-18-2010
1.00
Riveted uprights in place
Details
02-18-2010
1.50
Riveted upper stiffner to front of center spar
Details
02-17-2010
0.70
riveted remaining part of aft center spar
Details
02-17-2010
1.50
Drilled rivet holes in added stiffner
Details
02-08-2010
1.50
began riveting rear center spar
Details
02-07-2010
2.50
Transferred hole for AN5 bolts to doublers
Details
02-06-2010
2.10
Mounted 6ZU2-4's on back of center spar
Details
02-06-2010
1.50
fabricated 6ZU2-4
Details
02-06-2010
3.00
Drilled doublers on back of center spar
Details
02-05-2010
2.00
Removed remaining caps from center spar
Details
02-05-2010
1.40
Drilled 6ZU2-7
Details
02-05-2010
1.50
Drilled 6ZU2-1
Details
01-06-2010
1.00
Separate center spar for modification
Details
01-06-2010
1.40
Remove center spar
Details
12-03-2009
0.20
Removed dual control provisions
Details
12-02-2009
0.80
Removed pilot seat for Zenith modification
Details
SITE NAVIGATION
601XLB Home
Category
# Logs
# Hours
All
823
2512
aircraft kit
26
57
Avionics
26
57
controls
22
44
Electrical
53
155
elevator
12
23
Elevator
22
44
Engine
79
352
Fuel System
53
155
Fuselage
179
542
horizonal stabilisze
13
24
Ignition
86
194
Landing gear
13
24
Miscellaneous
13
23
None
3
192
prop
2
4
Prop
2
3
Purchasing
53
155
rudder
12
23
Tools
1
1
Wings
14
91
Wiring
53
155
Zenith modification
86
194
Copyright © 2001-2024 Matronics. All Rights Reserved.