KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
Work Logs Found: 53
Category Work Time: 155 Hours
 Date
Hours
Work Log Summary

Details

 01-29-2014
2.50
No fuel pressure
Details
       

 10-01-2013
10.00
Worked fuel pump location
Details
       

 01-25-2013
2.50
Provisions for rear position lamp
Details

 01-22-2013
0.80
Starter
Details

 01-22-2013
1.00
Compass lighting
Details

 12-29-2012
20.00
Replaced battery
Details
       

 10-10-2012
2.10
Replaced master relay
Details
       

 09-29-2012
11.10
Connected lights and pitot tube under port seat.
Details
       

 06-18-2012
2.00
Replaced master relay fuse
Details
       

 05-15-2012
0.75
Finished battery installation
Details
       

 05-14-2012
1.20
Electrical system work
Details
     

 05-14-2012
0.50
Began battery installation
Details

 05-08-2012
1.10
Routed tach pickup
Details
     

 05-07-2012
1.10
Prepared leads from CDI for battery connection
Details
     

 05-05-2012
3.10
Installed Lightspeed control in aircraft
Details
       

 05-04-2012
4.00
Updated Light Speed Control panel
Details
       

 04-26-2012
2.50
Fabricated control panel for Lightspeed unit
Details
       

 03-12-2012
1.50
Replaced alternator circuit breaker
Details
       

 03-05-2012
2.10
Installed alternator & tachometer drive assembly
Details
       

 02-07-2012
4.90
Fixed Illuminated switches & Fuel pump switch
Details
     

 09-21-2011
10.00
Debug and run ground test
Details

 06-23-2011
6.00
Installed light dimmer
Details
       

 06-01-2011
0.20
Install instrument light strips
Details
       

 10-04-2010
0.50
Drilled mounting holes for wet compass atop panel
Details

 09-23-2010
2.00
Updated electrical drawings
Details

 09-14-2010
2.70
Moved stobe control to port side of aircraft
Details
     

 09-11-2010
0.90
Installed lighting above instrument panel.
Details
       

 09-09-2010
2.50
Installed more wires behind panel
Details
     

 08-26-2010
2.00
Corrected error in electrical location of ammeter
Details
       

 08-25-2010
3.10
Added power and ground to selected instruments
Details
       

 08-24-2010
3.10
Added terminal board 3 and avionics ground
Details
       

 08-23-2010
0.40
Painted screw head for instrumetns
Details
       

 08-23-2010
2.00
Ordered parts for instrument panel
Details

 08-17-2010
2.50
Installed strobe power supply
Details
       

 08-16-2010
6.00
Installed TB1
Details
       

 08-14-2010
6.00
Routed more wires in center console and revised wi
Details
       

 08-13-2010
5.00
Cleaned up wiring in center console area
Details
       

 08-06-2010
0.00
Reinstalled console, and routed wiring
Details
     

 08-05-2010
0.50
Installed protective grommet in console panel
Details
       

 08-05-2010
0.80
Installed ammeter shunt
Details
       

 03-31-2010
0.70
Clecoed wiring bundles to side of fairings
Details

 03-29-2010
1.00
Clecoed wiring bundles inside arm rest
Details
       

 03-26-2010
4.10
Added wiring from master relay to front of aircraf
Details
       

 02-22-2010
1.00
Installed flap motor
Details
       

 01-20-2010
0.90
Replaced battery wiring
Details
     

 01-19-2010
0.50
Reworked battery power installation
Details
       

 12-12-2009
1.30
Design/document trim and flap control wiring
Details

 12-08-2009
2.30
Installed Master power relay
Details
       

 12-07-2009
2.30
Installed battery box
Details
       

 12-06-2009
2.00
Completed design of battery box installation
Details

 12-05-2009
2.00
Documented existing battery box planned for aircra
Details

 12-05-2009
2.30
Designed battery box installation, cut initial pie
Details
       

 11-19-2009
4.00
Cleaned up existing battery box
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.