Powered By Kitlog Pro v2.0
GLENN'S WEB SITE
AirCam
Fuel Tanks
Work Logs Found:
20
Category Work Time:
43 Hours
Date
Hours
Work Log Summary
Details
08-06-2015
1.50
Fuel tank vent tubes
Details
05-15-2014
4.50
PRC lids to tanks
Details
04-28-2014
0.40
Curtis drain valve
Details
04-28-2014
0.30
curtis drain valve
Details
03-18-2014
1.50
Sealed interior seams and tube
Details
03-18-2014
0.00
More pictures
Details
02-13-2014
3.00
Fuel pick up lines and vents
Details
02-04-2014
7.00
PRC
Details
01-26-2014
5.00
Started PRC of fuel tanks
Details
01-26-2014
1.00
PRC clean up.
Details
01-25-2014
6.30
Prep parts for prc
Details
01-19-2014
0.50
Fuel pick up lines
Details
01-13-2014
0.50
Drilled out AC-CT-028 attachment Brackets
Details
01-13-2014
4.00
Drilled all holes out with #30
Details
01-13-2014
1.00
counter sunk all the attachment brackets with 100c
Details
01-12-2014
2.50
Internal tank stiffeners and ribs
Details
01-12-2014
1.00
Cleco both tanks together
Details
01-05-2014
2.00
Fule tank ring doublers
Details
01-04-2014
0.50
lower tank drain valve assemblies
01-04-2014
0.70
Fuel caps
Details
SITE NAVIGATION
Contact Builder
AirCam Home
Category
# Logs
# Hours
All
284
547
Ailerons
10
16
Center wing
91
229
Elevator trim tab.
6
3
Elevators
22
36
Flaps
6
12
Fuel Tanks
20
43
Fuselage
2
3
Horizontal Stabilize
38
63
Paint booth
1
8
Rudder
19
30
Tools
1
0
Vertical Stab
46
71
Wings
22
33
Copyright © 2001-2024 Matronics. All Rights Reserved.