Powered By Kitlog Pro v2.0
Pietenpol Air Camper
Pietenpol Air Camper
Engine
Work Logs Found:
36
Category Work Time:
68 Hours
Date
Hours
Work Log Summary
Details
09-06-2020
1.50
Cylinder Nuts
Details
09-04-2020
1.00
Valve covers
Details
09-02-2020
1.00
Cleaning
Details
08-23-2020
3.00
Mounting the cylinders
Details
08-23-2020
1.00
Mounting the cylinders
Details
08-11-2020
1.50
Pistons
Details
07-28-2020
1.00
#2 cylinder
Details
07-26-2020
1.50
Painting the cylinders
Details
07-24-2020
3.00
Cylinders sandblasted
Details
07-18-2020
1.50
Oil sump
Details
07-06-2020
2.00
Cylinder cleaning
Details
07-05-2020
2.00
Cleaning
Details
07-04-2020
1.50
Engine Assembly
Details
02-16-2020
2.00
Connecting rods
Details
10-02-2016
2.00
Intake manifold
Details
06-10-2016
4.00
Engine mount
Details
05-26-2016
2.50
Intake pipes
Details
05-11-2016
1.00
Piston cleaning
Details
05-10-2016
1.50
#4 piston
Details
04-18-2016
4.00
Crankcase as is.
04-15-2016
3.00
End of disassembly
04-15-2016
3.00
End of disassembly
04-14-2016
3.00
Splitting the case
Details
04-12-2016
3.00
Crankcase
Details
04-11-2016
2.00
Engine disassembly
Details
04-05-2016
3.00
Diassembly
Details
04-04-2016
2.00
Disassembly cont'd
Details
03-31-2016
2.00
Engine on table
Details
03-30-2016
1.00
Disassembly cont'd
Details
03-29-2016
1.00
Disassembly
Details
03-25-2016
1.00
C90-8F
Details
02-07-2016
1.50
Clean up
Details
02-06-2016
1.00
Looking at the engine
Details
02-18-2014
0.50
Primer
Details
02-03-2014
1.00
Magneto
Details
10-07-2013
2.00
Engine
Details
SITE NAVIGATION
Contact Builder
Gyrocopter Home
Pietenpol Air Camper Home
Category
# Logs
# Hours
All
461
1041
Controls
32
60
Covering
1
2
Empennage
67
78
Engine
36
68
Fittings
1
1
Fuselage
98
310
Instruments
9
14
Intro
1
Landing Gear
21
38
Miscellaneous
5
18
Plumbing
12
23
Prop
8
9
Shop Supplies
3
9
Wings
167
411
Copyright © 2001-2025 Matronics. All Rights Reserved.