Wendells RV-6A
Work Logs Found: 30
Category Work Time: 115 Hours
 Date
Hours
Work Log Summary

Details

 11-06-2022
8.00
Made Lower Aluminum Stabilizer Fairings
Details
       

 11-05-2022
5.00
Form-fitting forward curves
Details
       

 11-04-2022
5.00
Epoxy filler in small gaps
Details
       

 11-02-2022
5.00
Drill and install fairing
Details
       

 10-14-2021
3.00
Fit the Fairing
Details
       

 10-13-2021
4.00
Adjust Elevator Travel
Details

 10-12-2021
4.00
Bolt elevators together
Details
       

 09-15-2021
8.00
Attach elevators together
Details
       

 01-14-2021
8.00
Installed electric trim
Details
       

 01-13-2021
3.00
Re-attached welded horn
Details
       

 11-03-2020
4.00
Attach Fiberglass Caps
Details
       

 11-01-2020
4.00
Left Elevator Horn Mismatch
Details
       

 09-24-2020
0.00
Make Rudder Stops 2
Details
       

 09-24-2020
4.00
Make Rudder Stops
Details
       

 09-02-2020
4.00
Reverse Bolt Direction
Details
       

 09-01-2020
1.00
Fitting elevators to Horizontal Stabilizer
Details
       

 08-31-2020
0.00
Mount VS for final time 2
Details
       

 08-31-2020
6.00
Mount VS for final time
Details
       

 08-29-2020
1.00
Prime VS parts
Details
       

 08-29-2020
6.00
Finish Drilling Vertical Stabilizer mount
Details
       

 08-29-2020
2.00
Drill rear VS spar to Fuselage
Details
       

 08-27-2020
3.00
Marking up the F681 for drilling.
Details
       

 08-27-2020
6.00
Final Drill Vertical Stab attach holes.
Details
       

 08-26-2020
5.00
Vertical Stabilizer and Rudder Caps
Details
       

 08-26-2020
3.00
Squared up the Vertical Stabilizer
Details
       

 03-25-2020
1.00
Vertical Stabilizer
Details
       

 03-25-2020
1.00
Reinforcement
Details
       

 02-10-2020
3.00
Vertical Stabilizer
Details
       

 02-09-2020
8.00
Install Horizontal Stabilizer
Details
       

 02-02-2014
0.00
Vans issues Svc Bulletin on Stabilizer Spar
Details
       