KitLog pro

Powered By Kitlog Pro v2.0

Neils Web Site
Work Logs Found: 43
Category Work Time: 206 Hours
 Date
Hours
Work Log Summary

Details

 05-08-2024
2.00
Install front seat
Details
     

 05-03-2024
2.00
Installed rear sling seat
Details
     

 04-29-2024
3.00
Install rear and mid right interior panels
Details
     

 04-26-2024
4.00
Install left side interior panels
Details
       

 03-01-2024
2.00
Tail wheel chains and springs
Details
     

 02-26-2024
3.00
Plumb brakes and protect lines
Details
       

 02-23-2024
2.00
Install Brakes
Details
     

 10-11-2023
3.00
Mount engine on Airframe
Details
     

 10-09-2023
4.00
Install rudder cable guards in cargo area
Details
     

 10-06-2023
5.00
Attach Elevator and Rudder Cables
Details
       

 10-03-2023
5.00
Attach Tail Feathers
Details
     

 08-14-2023
4.00
Install and Configure front suspension
Details
     

 07-21-2023
4.50
Install engine mount
Details
     

 06-29-2023
2.00
Reinstall Flap Handle
Details
     

 06-29-2023
1.50
Install foam tape for rear Windows and Deck
Details
     

 06-28-2023
3.00
Install Seat Belts
Details
       

 06-26-2023
5.00
Moved aircraft back to Solberg
Details
     

 05-29-2023
1.50
Clean and install tape to install rear windows
Details

 05-01-2023
1.00
Paint Aircraft
Details
       

 03-15-2023
8.00
Cover right side of fusalage
Details
       

 03-13-2023
8.00
Cover Left side of fusalage
Details
     

 03-09-2023
8.00
Cover underside of fusalage
Details
     

 03-08-2023
2.00
Install Vortex Generators on Right Wing
Details
     

 03-07-2023
1.50
Prime Right Wing
Details
     

 03-01-2023
15.00
Prime and Paint Tail feathers
Details
       

 02-28-2023
32.00
Cover left wing
Details

 02-27-2023
8.00
Complete Right Wing
Details
     

 02-24-2023
8.00
Install inspection rings - right wing
Details
     

 02-23-2023
8.00
Cover Top of Right Wing
Details
     

 02-22-2023
8.00
Start Covering wings
Details
     

 11-17-2022
3.00
Remove wings and move
Details

 10-12-2022
2.00
Install and adjust Flap Control Rods
Details
     

 10-10-2022
3.00
Mount Flap Handle
Details
     

 10-07-2022
3.00
Mount Flaps
Details
       

 10-06-2022
3.00
Mount Ailerons
Details
     

 10-05-2022
3.00
Route Aileron Cables
Details
       

 08-10-2022
8.00
Trim drill and fit interior panels
Details
       

 04-25-2022
3.00
Install Jury Struts
Details
       

 04-20-2022
3.00
Install Tie down and Lift Rings
Details
       

 04-19-2022
1.00
Establish Aircraft Centering Points
Details
       

 04-18-2022
3.00
Readjust wing dihedral
Details
       

 04-14-2022
4.00
Mount wings on Fusalage
Details
       

 04-01-2021
3.00
Install wiring for ELT
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.