Powered By Kitlog Pro v2.0
GEORGE'S WEB SITE
CH750
Wings
Work Logs Found:
11
Category Work Time:
62 Hours
Date
Hours
Work Log Summary
Details
08-29-2016
8.00
Conditioned and riveted bottom skin on wings
Details
07-07-2016
1.00
Expanded drilling pilot holes on O/B Bottom Skin.
Details
07-04-2016
4.00
Set up level surface for frame, Attached O/B bott
Details
07-02-2016
4.00
Completed Riveting Frame
Details
04-24-2016
4.00
Assembled Wing 1
Details
04-23-2016
1.00
Rear Channel
Details
09-06-2015
4.00
Preassemble Wing Sheleton
Details
08-30-2015
6.00
Fabricated Nose Ribs for wings
Details
08-30-2015
3.00
Completed Wing Nose Ribs
Details
08-16-2015
24.00
Completed Flaps and Slats
Details
01-12-2014
3.00
Opened and inspected Flap and Slat Kit
Details
SITE NAVIGATION
Contact Builder
CH750 Home
Category
# Logs
# Hours
All
75
215
Flaps and Slats
18
51
Shop Supplies
1
6
Tail
41
89
Tools
4
7
Wings
11
62
Copyright © 2001-2024 Matronics. All Rights Reserved.