KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
Work Logs Found: 58
Category Work Time: 130 Hours
 Date
Hours
Work Log Summary

Details

 01-26-2015
3.00
engine baffle gap seal final and hinge pin retaini
Details
       

 01-23-2015
1.50
lower cowl final fit preps for DAR inspection
Details

 01-22-2015
0.50
Plate nuts instaled fpr cowl pin retention
Details
     

 01-11-2015
0.50
Cowl pin retaining screws
Details
       

 12-31-2014
1.00
cowl pin alternate set up
Details
     

 12-28-2014
3.00
Hinge fit work
Details
       

 11-03-2014
1.00
oil door rivited on to cowl and wet sanded primer
Details
     

 10-31-2014
1.50
Cowl induction glassing final sanding and primer
Details
 

 10-30-2014
1.00
cut intake air snout back and then sanded smooth
Details
     

 10-29-2014
3.00
More air snout glass work and oil door fitting
Details
       

 10-21-2014
2.00
Top cowl sanding and wet sanding
Details

 10-21-2014
2.50
Lower cowl cooling inlet seals fabricated abd inst
Details
       

 10-21-2014
1.00
Induction inlet glass day2
Details
       

 10-20-2014
3.00
Cowl carb air induction glass and top cowl sanding
Details
       

 10-19-2014
1.50
upper cowl repoxy coat 3 and 4
Details
       

 10-12-2014
1.00
epoxy coat to inside of top cowl
Details
       

 10-08-2014
5.00
oil door
Details
       

 10-07-2014
1.50
final lower cowl prep and wetsanding
Details
     

 10-05-2014
2.00
Sanding top cowl and sand and fill work on bottom
Details
       

 10-04-2014
1.50
Bottom cowl primered with coat 1
Details
     

 10-03-2014
1.00
Sanding the bottom cowl again
Details

 10-02-2014
3.00
More exterior sanding and epoxy application
Details
     

 09-28-2014
3.00
Bottom cowl micro and top cowl epoxy pin hole fill
Details
       

 09-19-2014
5.00
Front lower cowling sanding and epoxy
Details
       

 07-01-2014
2.00
Feather sanding of the top cowling upper inlet ram
Details
       

 06-30-2014
1.50
upper cowl inlet ramps continues 2
Details

 06-27-2014
1.00
More sanding on the upper air inlet ramps
Details

 06-22-2014
1.00
Upper cowling upper intake ramp sanding on left si
     

 06-13-2014
1.25
upper intake cowl ramps epoxy1 and 2
Details
       

 05-20-2014
1.75
Sanding the cowl
Details

 02-16-2014
1.00
Cowl misc and contour molding
Details

 01-29-2014
4.00
Finish installing all hinges to cowling
Details
       

 01-26-2014
4.00
More top cowl fit adjustments and epoxy bottom cow
Details
       

 01-25-2014
5.00
Rivit on the upper cowl top hinges and lots of fit
Details
       

 01-24-2014
0.75
Upper cowl firewall hinge epxoxied to the cowl
Details
       

 01-23-2014
1.50
right upper cowl hinge installed
Details
       

 01-22-2014
1.00
left upper cowl hinge 2
Details
       

 01-20-2014
4.00
Upper cowl hrozontal paint relief cuts and hinge w
Details
       

 01-19-2014
2.50
Drill the right upper cowl hinge. Nose nut plates
Details
       

 01-18-2014
2.00
Left side upper cowl hinge drilled
Details
     

 01-14-2014
2.50
Fire seal firewall flanges and rivit on cowl hinge
Details
       

 01-13-2014
4.00
Bottom Cowl horizontal piano hinge fitting and mis
Details
       

 01-12-2014
4.50
Drill firewall hinges to lower cowl and made horiz
Details
       

 01-11-2014
4.00
Bottom cowl hinges and firewall side hinges
Details
       

 01-10-2014
2.50
Upper cowl redrill hinge and shims
Details
       

 01-10-2014
2.50
Bottomr cowl bottom aft cuts for fit
Details
       

 01-04-2014
4.50
Upper cowl re-fit-1
Details
     

 12-31-2013
1.50
upper cowling fitting with shims
Details
       

 12-31-2013
1.00
Bottom cowl basic fitting
Details
       

 12-30-2013
2.00
Upper cowl-4 the sim strip
Details
       

 12-30-2013
1.50
Lower cowl bottom hinges left and right sides
Details
       

 12-29-2013
2.75
Upper cowl fitting and drilling to upper fwd hinge
Details
       

 12-28-2013
2.50
Upper cowl trim process-day two
Details
       

 12-27-2013
3.00
first trim cut to upper cowling
Details
       

 12-03-2013
3.00
Cowl firewall hinge 2
Details
       

 12-02-2013
1.00
Drill upper cowl piano hinge to firewall
Details
       

 12-01-2013
1.00
cowl fitting 2
Details
       

 11-30-2013
3.00
cowl fitting 1-oil access door
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.