Powered By Kitlog Pro v2.0
Bill & Brendas RV-8 QB
RV-8
cowling
Work Logs Found:
58
Category Work Time:
130 Hours
Date
Hours
Work Log Summary
Details
01-26-2015
3.00
engine baffle gap seal final and hinge pin retaini
Details
01-23-2015
1.50
lower cowl final fit preps for DAR inspection
Details
01-22-2015
0.50
Plate nuts instaled fpr cowl pin retention
Details
01-11-2015
0.50
Cowl pin retaining screws
Details
12-31-2014
1.00
cowl pin alternate set up
Details
12-28-2014
3.00
Hinge fit work
Details
11-03-2014
1.00
oil door rivited on to cowl and wet sanded primer
Details
10-31-2014
1.50
Cowl induction glassing final sanding and primer
Details
10-30-2014
1.00
cut intake air snout back and then sanded smooth
Details
10-29-2014
3.00
More air snout glass work and oil door fitting
Details
10-21-2014
2.00
Top cowl sanding and wet sanding
Details
10-21-2014
2.50
Lower cowl cooling inlet seals fabricated abd inst
Details
10-21-2014
1.00
Induction inlet glass day2
Details
10-20-2014
3.00
Cowl carb air induction glass and top cowl sanding
Details
10-19-2014
1.50
upper cowl repoxy coat 3 and 4
Details
10-12-2014
1.00
epoxy coat to inside of top cowl
Details
10-08-2014
5.00
oil door
Details
10-07-2014
1.50
final lower cowl prep and wetsanding
Details
10-05-2014
2.00
Sanding top cowl and sand and fill work on bottom
Details
10-04-2014
1.50
Bottom cowl primered with coat 1
Details
10-03-2014
1.00
Sanding the bottom cowl again
Details
10-02-2014
3.00
More exterior sanding and epoxy application
Details
09-28-2014
3.00
Bottom cowl micro and top cowl epoxy pin hole fill
Details
09-19-2014
5.00
Front lower cowling sanding and epoxy
Details
07-01-2014
2.00
Feather sanding of the top cowling upper inlet ram
Details
06-30-2014
1.50
upper cowl inlet ramps continues 2
Details
06-27-2014
1.00
More sanding on the upper air inlet ramps
Details
06-22-2014
1.00
Upper cowling upper intake ramp sanding on left si
06-13-2014
1.25
upper intake cowl ramps epoxy1 and 2
Details
05-20-2014
1.75
Sanding the cowl
Details
02-16-2014
1.00
Cowl misc and contour molding
Details
01-29-2014
4.00
Finish installing all hinges to cowling
Details
01-26-2014
4.00
More top cowl fit adjustments and epoxy bottom cow
Details
01-25-2014
5.00
Rivit on the upper cowl top hinges and lots of fit
Details
01-24-2014
0.75
Upper cowl firewall hinge epxoxied to the cowl
Details
01-23-2014
1.50
right upper cowl hinge installed
Details
01-22-2014
1.00
left upper cowl hinge 2
Details
01-20-2014
4.00
Upper cowl hrozontal paint relief cuts and hinge w
Details
01-19-2014
2.50
Drill the right upper cowl hinge. Nose nut plates
Details
01-18-2014
2.00
Left side upper cowl hinge drilled
Details
01-14-2014
2.50
Fire seal firewall flanges and rivit on cowl hinge
Details
01-13-2014
4.00
Bottom Cowl horizontal piano hinge fitting and mis
Details
01-12-2014
4.50
Drill firewall hinges to lower cowl and made horiz
Details
01-11-2014
4.00
Bottom cowl hinges and firewall side hinges
Details
01-10-2014
2.50
Upper cowl redrill hinge and shims
Details
01-10-2014
2.50
Bottomr cowl bottom aft cuts for fit
Details
01-04-2014
4.50
Upper cowl re-fit-1
Details
12-31-2013
1.50
upper cowling fitting with shims
Details
12-31-2013
1.00
Bottom cowl basic fitting
Details
12-30-2013
2.00
Upper cowl-4 the sim strip
Details
12-30-2013
1.50
Lower cowl bottom hinges left and right sides
Details
12-29-2013
2.75
Upper cowl fitting and drilling to upper fwd hinge
Details
12-28-2013
2.50
Upper cowl trim process-day two
Details
12-27-2013
3.00
first trim cut to upper cowling
Details
12-03-2013
3.00
Cowl firewall hinge 2
Details
12-02-2013
1.00
Drill upper cowl piano hinge to firewall
Details
12-01-2013
1.00
cowl fitting 2
Details
11-30-2013
3.00
cowl fitting 1-oil access door
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1040
2332
baffles
37
97
brake system
16
23
Canopy
64
162
Canopy skirt
47
75
Canopy/windscreen
64
162
cowling
58
130
electical-FWF
4
3
Electrical-cockpit
12
16
Elevators
20
63
Empennage
11
28
Engine
20
41
Exterior lights and
6
8
FAB
16
36
Fiberglass fairings
9
8
Fiberglass tips
46
68
Firewall Forward
46
90
Fuselage
136
329
Horizontal Stabilize
15
68
interior cushions an
3
8
Inventory
8
19
jigs, cradles, stand
6
15
Kit arrival
7
6
labels and plackards
2
3
Landing gear
17
40
Lights
12
28
Miscellaneous
56
96
None
1
1
Panel
40
78
paperwork
2
4
phase one tests
4
Practice kit
6
23
practice kit or tria
1
2
Prop
12
29
Propeller/Spinner
12
29
Rudder
16
43
Seats and floors
7
31
Tools
1
1
Vertical Stabilizer
8
18
weight and balance
3
8
Wing Fit/install
27
76
Wing Fitting
27
76
wing tip lights and
5
16
Wing Tips
7
20
Wings
43
123
Wire work
22
27
Wiring behind panel
34
63
wiring-cabin
24
42
Copyright © 2001-2024 Matronics. All Rights Reserved.