KitLog pro

Powered By Kitlog Pro v2.0

Chad's Challenger II Site
Work Logs Found: 15
Category Work Time: 43 Hours
 Date
Hours
Work Log Summary

Details

 03-25-2006
8.00
Rotax 503 DCDI Break-in Procedure
Details
       

 02-25-2006
5.00
Running the engine
Details
       

 01-14-2006
2.00
Installed Redrive
Details
     

 11-26-2005
6.00
Throttle and Enricher cables
Details
       

 11-26-2005
0.00
More pictures of Throttle and Enricher routing
       

 11-25-2005
0.00
Throttle Levers
       

 11-25-2005
6.00
Throttle cable installation, Mechanical fuel pump
Details
       

 10-25-2005
0.00
Muffler Bracket Part 2
       

 10-25-2005
1.00
Muffler bracket
Details
       

 10-23-2005
2.00
Partially Installed Muffler Assembly
Details
     

 10-22-2005
2.50
Exhaust Manifold amd Carburetors
Details
       

 10-20-2005
0.25
Hung the engine on the root tube
Details
       

 10-15-2005
5.00
Installed Engine Mount and Starter Relay
Details
       

 09-10-2005
2.00
Installed GPL Starter
Details
       

 07-26-2005
3.00
Spark plug wire shielding
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.