Powered By Kitlog Pro v2.0
My RV-8 Build Log
RV-8
Engine
Work Logs Found:
122
Category Work Time:
322 Hours
Date
Hours
Work Log Summary
Details
07-27-2019
2.00
First Engine Start
Details
07-13-2019
3.00
Engine Prep for Start
Details
07-11-2018
2.00
More Cushion Clamps
Details
07-06-2018
2.00
Change Cooling Hoses
Details
06-24-2018
2.00
Re-Align / Re-Route Exhaust
Details
05-05-2018
2.00
Alternator Belt Installation
Details
12-18-2016
2.00
SCAT Routing and Clamping
Details
12-17-2016
5.00
SCAT Routing Through Engine Mount
Details
11-26-2016
4.00
Re-routing SCAT from Heat Muff to FW
Details
08-27-2016
5.00
Relocating the Heat Muff Flange
Details
08-10-2016
2.00
Fuel Line Attach Bracket
Details
08-09-2016
2.00
Fuel Servo to Red Cube line
Details
07-31-2016
4.00
Fuel Line Servo to Red Cube rethink
Details
07-25-2016
2.00
Fuel, Oil and Prop Line Specifications
Details
07-24-2016
4.00
New Red Cube Mounting
Details
07-23-2016
4.00
More Red Cube Location Work
Details
07-16-2016
4.00
SCAT tube for Cabin Heat
Details
07-14-2016
2.00
Cabin Heat Bypass Installation
Details
07-11-2016
2.00
Fuel Line Specifications
Details
06-30-2016
2.00
Alternator Blast Tube and Cowl Fitting
Details
06-29-2016
2.00
Ignition Harness Wedge Clamps
Details
06-25-2016
5.00
Oil Cooler Installation
Details
06-19-2016
6.00
Baffle Air Seal Riveting Continued
Details
06-18-2016
5.00
Oil Cooler Installation
Details
06-18-2016
4.00
Installing Oil Cooler and Lines
Details
06-18-2016
4.00
Baffle Air Seal Riveting Continued
Details
06-16-2016
2.00
Baffle Air Seal Riveting
Details
06-15-2016
2.00
Baffle Air Seal
Details
06-13-2016
2.00
Engine Baffle Braces
Details
06-12-2016
4.00
Engine Baffle Tension Rods
Details
06-11-2016
4.00
Ignition Wire Baffle Pass-Thru
Details
06-10-2016
2.00
Baffle Priming
Details
06-08-2016
2.00
Cylinder Baffle Clips
Details
06-06-2016
2.00
Resume Top Cowl Fitting
Details
05-29-2016
7.00
Fitting the Top Cowl - Continued
Details
05-28-2016
6.00
Fitting the Top Cowl
Details
05-26-2016
2.00
Conical Gussets for front engine baffle
Details
05-25-2016
2.00
Front Baffle Assy - Finish
Details
05-24-2016
2.00
Front Baffle Assy Continues.,..
Details
05-23-2016
2.00
Front Baffle Assy
Details
05-22-2016
6.00
Conical Gussets
Details
05-21-2016
9.00
More Engine Baffle Work
Details
05-19-2016
2.00
Engine Baffle Front Ramps
Details
05-18-2016
2.00
Cowl to Engine Baffle, Baffle Trimming
Details
05-16-2016
2.00
FAB Air Seal
Details
05-10-2016
2.00
Engine Baffle Clips / Air Intake Work...
Details
05-08-2016
4.00
FAB Filter Bypass Cable/Knob Intall
Details
05-03-2016
2.00
FAB Filter Bypass
Details
05-01-2016
5.00
FAB II Continued
Details
04-28-2016
2.00
FAB II Continued
Details
04-26-2016
2.00
FAB II
Details
04-19-2016
2.00
Cowl Baffle WIP
Details
04-16-2016
4.00
FAB Adjustment for RSA Bendix Mixture
Details
04-09-2016
4.00
Trimming the FAB for cowl fitting
Details
04-06-2016
2.00
Fabbing the FAB
Details
04-04-2016
2.00
Fitting Cowl and FAB
Details
04-03-2016
4.00
FAB Fabbing
Details
01-24-2015
5.00
New 3-port Manifold
Details
07-12-2014
6.00
Adjust Engine Control Cables, etc...
Details
07-10-2014
2.00
Prop Governor Re-Adjust and Re-Install
Details
07-09-2014
2.00
Engine Control Cables Installation
Details
07-08-2014
3.00
Engine Control Quadrant Install
Details
06-30-2014
2.00
Engine Controls Quadrant Assembly
Details
05-29-2014
2.00
Clevis Rod End to Control Cable for Throttle Quadr
Details
05-28-2014
3.00
Connecting Throttle Quadrant to Control Cables
Details
05-26-2014
2.00
Fitting the Throttle Quadrant Console
Details
05-25-2014
2.50
Throttle Quadrant Initial Fitting
Details
05-25-2014
2.50
Fuel Line and Control Cable Routings...
Details
05-21-2014
2.50
Mixture Control Rod Modification
Details
05-20-2014
1.50
Fuel Line DG Clamp Relocation
Details
05-19-2014
1.00
Fuel Line Clamp - Pump to Servo Relocation Needed
Details
05-18-2014
3.00
Engine Baffle Install - Exhaust Redo, etc.
Details
05-18-2014
2.50
Engine Baffle Install - CB Trimming and Init Cowl
Details
05-17-2014
2.50
Engine Baffle Install - Left Front CB Ramp [2] B
Details
05-17-2014
2.50
Engine Baffle Install - Left Front CB Ramp [1]
Details
05-10-2014
5.00
Engine Baffle Install - More Baffle Fitting
Details
05-09-2014
1.00
Engine Baffle Install - Baffle Fitting
Details
05-08-2014
1.50
Engine Baffle Install - Oil Cooler Location
Details
05-08-2014
1.50
Engine Baffle Install - Oil Cooler Cut Out
Details
05-07-2014
1.00
Engine Baffle Install - More Baffles
Details
05-07-2014
2.00
Engine Baffle Install - Engine Case Brackets
Details
05-07-2014
1.50
Engine Baffle Install - Baffles and Brackets
Details
05-06-2014
2.00
Engine Baffle Install - Left Aft Baffle and Oil Co
Details
05-06-2014
2.00
Engine Baffle Install - Baffles, Brackes & Doubler
Details
05-05-2014
1.50
Engine Baffle Install - Side Baffles
Details
05-05-2014
2.50
Engine Baffle Install - Bracket Separation, etc.
Details
05-02-2014
2.00
Engine Baffle Install - Trial Fitting Panels
Details
04-30-2014
1.50
Prop Governor Install - Part 2
Details
04-30-2014
1.00
Prop Governor Install - Part 1
Details
04-29-2014
2.50
Mixture and Throttle Rod End Bearing Linkage Redo
Details
04-27-2014
4.00
FWF Fuel Pump Vent and FW Cable Penetration
Details
04-26-2014
4.00
FWF Prop Governor Control Cable
Details
04-22-2014
2.50
FWF Engine Control Rod End Bearings
Details
04-18-2014
2.50
FWF Prop Governer Bracket
Details
04-17-2014
2.50
FWF Fuel Line DG Clamps
Details
04-16-2014
2.50
FWF Fuel Lines
Details
04-12-2014
3.00
FWF Engine Control Bracket Install
Details
03-30-2014
3.00
FWF Engine Control Bracket, Cable FW Pass-THru
Details
03-29-2014
2.00
FWF Crankcase Vent
Details
03-27-2014
3.00
FWF Manifold, Oil and Fuel Pressure Lines
Details
03-24-2014
1.50
FWF Oil Pressure Line
Details
03-23-2014
2.00
FWF Exhaust Support Part 2
Details
03-23-2014
3.00
FWF Exhaust Support Part 1
Details
03-22-2014
2.00
FWF Exhaust Install Part 2
Details
03-22-2014
3.00
FWF Exhaust Install Part 1
Details
03-22-2014
3.00
FWF Beginning.... VA1-128 Sender Mount Install
Details
03-20-2014
2.00
FWF Identification
Details
03-17-2014
2.00
FWF Kit Sorting...
Details
03-17-2014
2.00
FWF Kit arrival and inspection
Details
03-02-2014
2.00
Ensuring Engine Bolts and Castle Nuts align
Details
03-01-2014
1.50
Correcting Bottom Mount Washers
Details
02-16-2014
1.00
Engine Installed - now for FWF
Details
02-16-2014
1.50
Engine Install - Part 2
Details
02-15-2014
1.50
Engine Install - Part 1
Details
02-15-2014
1.50
Engine Install - Getting everything ready
Details
02-10-2014
1.00
Received Engine from Williamson Aircraft
Details
01-19-2014
1.00
Engine Test After Overhaul
Details
01-19-2014
1.00
Engine Test After Overhaul
Details
01-10-2014
1.00
IO360-A1A Assembly
Details
01-10-2014
1.00
IO360-A1A Assembly
Details
01-09-2014
1.00
IO360-A1A Assembly
Details
12-20-2013
2.00
Engine Found !
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
876
2687
Ailerons and Flaps
1
5
Avionics
61
194
Baggage Door
1
3
Brake System
17
34
Cabin
7
40
Canopy
44
138
Cowl
56
180
DAR Inspection
1
3
Electrical
97
275
Empennage
97
342
Engine
122
322
Fairings
54
153
First Flight
1
2
Flight Control
17
46
Flight Training
2
10
Fuel System
34
106
Fuselage
98
299
Instrument Panel
17
60
Interior
13
42
Landing Gear
8
18
Lighting
10
26
Markings, Placards a
2
4
Miscellaneous
14
66
None
1
Paint and Prep
8
24
Phase I
1
2
Pitot/AOA
2
6
Post DAR Inspection
3
14
Prop
15
46
QB Kit
2
9
Static Pressure Syst
4
10
Tech Councilor Visit
1
2
Tech Inspection
1
2
Tires
1
1
Transition Training
1
10
Weight and Balance
1
3
Windscreen
27
75
Wings
34
115
Copyright © 2001-2024 Matronics. All Rights Reserved.