KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
Work Logs Found: 122
Category Work Time: 322 Hours
 Date
Hours
Work Log Summary

Details

 07-27-2019
2.00
First Engine Start
Details
       

 07-13-2019
3.00
Engine Prep for Start
Details
       

 07-11-2018
2.00
More Cushion Clamps
Details
       

 07-06-2018
2.00
Change Cooling Hoses
Details
       

 06-24-2018
2.00
Re-Align / Re-Route Exhaust
Details
       

 05-05-2018
2.00
Alternator Belt Installation
Details
       

 12-18-2016
2.00
SCAT Routing and Clamping
Details
       

 12-17-2016
5.00
SCAT Routing Through Engine Mount
Details
       

 11-26-2016
4.00
Re-routing SCAT from Heat Muff to FW
Details
       

 08-27-2016
5.00
Relocating the Heat Muff Flange
Details
       

 08-10-2016
2.00
Fuel Line Attach Bracket
Details
       

 08-09-2016
2.00
Fuel Servo to Red Cube line
Details
       

 07-31-2016
4.00
Fuel Line Servo to Red Cube rethink
Details
       

 07-25-2016
2.00
Fuel, Oil and Prop Line Specifications
Details
       

 07-24-2016
4.00
New Red Cube Mounting
Details
       

 07-23-2016
4.00
More Red Cube Location Work
Details
       

 07-16-2016
4.00
SCAT tube for Cabin Heat
Details
       

 07-14-2016
2.00
Cabin Heat Bypass Installation
Details
       

 07-11-2016
2.00
Fuel Line Specifications
Details
       

 06-30-2016
2.00
Alternator Blast Tube and Cowl Fitting
Details
       

 06-29-2016
2.00
Ignition Harness Wedge Clamps
Details
       

 06-25-2016
5.00
Oil Cooler Installation
Details
       

 06-19-2016
6.00
Baffle Air Seal Riveting Continued
Details
       

 06-18-2016
5.00
Oil Cooler Installation
Details
       

 06-18-2016
4.00
Installing Oil Cooler and Lines
Details
       

 06-18-2016
4.00
Baffle Air Seal Riveting Continued
Details
       

 06-16-2016
2.00
Baffle Air Seal Riveting
Details
       

 06-15-2016
2.00
Baffle Air Seal
Details
       

 06-13-2016
2.00
Engine Baffle Braces
Details
       

 06-12-2016
4.00
Engine Baffle Tension Rods
Details
       

 06-11-2016
4.00
Ignition Wire Baffle Pass-Thru
Details
       

 06-10-2016
2.00
Baffle Priming
Details
       

 06-08-2016
2.00
Cylinder Baffle Clips
Details
       

 06-06-2016
2.00
Resume Top Cowl Fitting
Details
       

 05-29-2016
7.00
Fitting the Top Cowl - Continued
Details
       

 05-28-2016
6.00
Fitting the Top Cowl
Details
       

 05-26-2016
2.00
Conical Gussets for front engine baffle
Details
       

 05-25-2016
2.00
Front Baffle Assy - Finish
Details
       

 05-24-2016
2.00
Front Baffle Assy Continues.,..
Details
       

 05-23-2016
2.00
Front Baffle Assy
Details
       

 05-22-2016
6.00
Conical Gussets
Details
       

 05-21-2016
9.00
More Engine Baffle Work
Details
       

 05-19-2016
2.00
Engine Baffle Front Ramps
Details
       

 05-18-2016
2.00
Cowl to Engine Baffle, Baffle Trimming
Details
       

 05-16-2016
2.00
FAB Air Seal
Details
       

 05-10-2016
2.00
Engine Baffle Clips / Air Intake Work...
Details
       

 05-08-2016
4.00
FAB Filter Bypass Cable/Knob Intall
Details
       

 05-03-2016
2.00
FAB Filter Bypass
Details
       

 05-01-2016
5.00
FAB II Continued
Details
       

 04-28-2016
2.00
FAB II Continued
Details
       

 04-26-2016
2.00
FAB II
Details
       

 04-19-2016
2.00
Cowl Baffle WIP
Details
       

 04-16-2016
4.00
FAB Adjustment for RSA Bendix Mixture
Details
       

 04-09-2016
4.00
Trimming the FAB for cowl fitting
Details
       

 04-06-2016
2.00
Fabbing the FAB
Details
       

 04-04-2016
2.00
Fitting Cowl and FAB
Details
       

 04-03-2016
4.00
FAB Fabbing
Details
       

 01-24-2015
5.00
New 3-port Manifold
Details
       

 07-12-2014
6.00
Adjust Engine Control Cables, etc...
Details
       

 07-10-2014
2.00
Prop Governor Re-Adjust and Re-Install
Details
       

 07-09-2014
2.00
Engine Control Cables Installation
Details
       

 07-08-2014
3.00
Engine Control Quadrant Install
Details
       

 06-30-2014
2.00
Engine Controls Quadrant Assembly
Details
       

 05-29-2014
2.00
Clevis Rod End to Control Cable for Throttle Quadr
Details
       

 05-28-2014
3.00
Connecting Throttle Quadrant to Control Cables
Details
       

 05-26-2014
2.00
Fitting the Throttle Quadrant Console
Details
       

 05-25-2014
2.50
Throttle Quadrant Initial Fitting
Details
       

 05-25-2014
2.50
Fuel Line and Control Cable Routings...
Details
       

 05-21-2014
2.50
Mixture Control Rod Modification
Details
       

 05-20-2014
1.50
Fuel Line DG Clamp Relocation
Details
       

 05-19-2014
1.00
Fuel Line Clamp - Pump to Servo Relocation Needed
Details
       

 05-18-2014
3.00
Engine Baffle Install - Exhaust Redo, etc.
Details
       

 05-18-2014
2.50
Engine Baffle Install - CB Trimming and Init Cowl
Details
       

 05-17-2014
2.50
Engine Baffle Install - Left Front CB Ramp [2] B
Details
       

 05-17-2014
2.50
Engine Baffle Install - Left Front CB Ramp [1]
Details
       

 05-10-2014
5.00
Engine Baffle Install - More Baffle Fitting
Details
       

 05-09-2014
1.00
Engine Baffle Install - Baffle Fitting
Details
       

 05-08-2014
1.50
Engine Baffle Install - Oil Cooler Location
Details
       

 05-08-2014
1.50
Engine Baffle Install - Oil Cooler Cut Out
Details
       

 05-07-2014
1.00
Engine Baffle Install - More Baffles
Details
       

 05-07-2014
2.00
Engine Baffle Install - Engine Case Brackets
Details
       

 05-07-2014
1.50
Engine Baffle Install - Baffles and Brackets
Details
       

 05-06-2014
2.00
Engine Baffle Install - Left Aft Baffle and Oil Co
Details
       

 05-06-2014
2.00
Engine Baffle Install - Baffles, Brackes & Doubler
Details
       

 05-05-2014
1.50
Engine Baffle Install - Side Baffles
Details
       

 05-05-2014
2.50
Engine Baffle Install - Bracket Separation, etc.
Details
       

 05-02-2014
2.00
Engine Baffle Install - Trial Fitting Panels
Details
       

 04-30-2014
1.50
Prop Governor Install - Part 2
Details
       

 04-30-2014
1.00
Prop Governor Install - Part 1
Details
       

 04-29-2014
2.50
Mixture and Throttle Rod End Bearing Linkage Redo
Details
       

 04-27-2014
4.00
FWF Fuel Pump Vent and FW Cable Penetration
Details
       

 04-26-2014
4.00
FWF Prop Governor Control Cable
Details
       

 04-22-2014
2.50
FWF Engine Control Rod End Bearings
Details
       

 04-18-2014
2.50
FWF Prop Governer Bracket
Details
       

 04-17-2014
2.50
FWF Fuel Line DG Clamps
Details
       

 04-16-2014
2.50
FWF Fuel Lines
Details
       

 04-12-2014
3.00
FWF Engine Control Bracket Install
Details
       

 03-30-2014
3.00
FWF Engine Control Bracket, Cable FW Pass-THru
Details
       

 03-29-2014
2.00
FWF Crankcase Vent
Details
       

 03-27-2014
3.00
FWF Manifold, Oil and Fuel Pressure Lines
Details
       

 03-24-2014
1.50
FWF Oil Pressure Line
Details
       

 03-23-2014
2.00
FWF Exhaust Support Part 2
Details
       

 03-23-2014
3.00
FWF Exhaust Support Part 1
Details
       

 03-22-2014
2.00
FWF Exhaust Install Part 2
Details
       

 03-22-2014
3.00
FWF Exhaust Install Part 1
Details
       

 03-22-2014
3.00
FWF Beginning.... VA1-128 Sender Mount Install
Details
       

 03-20-2014
2.00
FWF Identification
Details
       

 03-17-2014
2.00
FWF Kit Sorting...
Details
       

 03-17-2014
2.00
FWF Kit arrival and inspection
Details
       

 03-02-2014
2.00
Ensuring Engine Bolts and Castle Nuts align
Details
       

 03-01-2014
1.50
Correcting Bottom Mount Washers
Details
       

 02-16-2014
1.00
Engine Installed - now for FWF
Details
       

 02-16-2014
1.50
Engine Install - Part 2
Details
       

 02-15-2014
1.50
Engine Install - Part 1
Details
       

 02-15-2014
1.50
Engine Install - Getting everything ready
Details
       

 02-10-2014
1.00
Received Engine from Williamson Aircraft
Details
       

 01-19-2014
1.00
Engine Test After Overhaul
Details
       

 01-19-2014
1.00
Engine Test After Overhaul
Details
       

 01-10-2014
1.00
IO360-A1A Assembly
Details
       

 01-10-2014
1.00
IO360-A1A Assembly
Details
       

 01-09-2014
1.00
IO360-A1A Assembly
Details
       

 12-20-2013
2.00
Engine Found !
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.