Steves Web Site
RV8A
Engine
Work Logs Found:
33
Category Work Time:
169 Hours
Date
Hours
Work Log Summary
Details
10-07-2015
3.00
First Engine Start
Details
10-01-2015
3.50
finish baffles
Details
09-30-2015
4.00
fine tune inlet seal strips
Details
09-28-2015
1.00
layed up plugs for upper cowl ramps
Details
09-27-2015
6.00
baffle skirts
09-26-2015
10.00
oil system, baffles
Details
09-24-2015
6.00
baffle tension rods
Details
09-21-2015
4.00
measure and cut upper baffles
Details
09-20-2015
4.00
scat hoses and baffles
Details
09-19-2015
8.00
baffles cont.
Details
09-16-2015
2.00
more baffle work
09-14-2015
2.50
baffles again
09-13-2015
10.00
baffle work cont.
09-09-2015
2.50
baffle cont.
09-06-2015
7.00
baffles cont.
08-30-2015
5.00
finish oil seperator, prep and debur baffle plates
08-29-2015
2.50
install Reiff heaters
Details
08-29-2015
9.00
fuel and oil plumbing FF
08-26-2015
3.00
install alt and starter cables, finalize cabin hea
08-23-2015
7.00
finalize exhaust system
Details
08-19-2015
9.00
finish FAB; prime and paint cowl
Details
08-18-2015
6.50
FAB cont.
Details
08-17-2015
8.00
filtered air box cont.
Details
08-15-2015
3.50
FAB continued
08-13-2015
3.00
filtered air box
Details
08-08-2015
7.00
exhaust system work
Details
08-07-2015
2.00
test fit exhaust system
05-27-2015
9.00
mount engine #3
Details
05-26-2015
4.00
engine mount try #2
Details
05-20-2015
4.50
mount engine #1
Details
11-15-2014
4.50
install throttle and mixture firewall penetrations
11-14-2014
6.00
test fit engine
Details
12-30-2013
2.00
unpack engine and inventory accessories
Details
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
564
2547
Avionics / panel
38
204
Canopy
30
167
Cowl
12
78
Electrical
38
244
Empennage
69
268
Engine
33
169
Fuel System
6
39
Fuselage
62
269
Hangar
52
Miscellaneous
32
114
motorhome
7
Paint
47
257
Panel
38
204
Panel / Avionics
38
204
Shop
5
Tools
1
Wheel pants and fair
14
86
wheels / brakes
3
13
Wings
39
231