Steves Web Site
Work Logs Found: 38
Category Work Time: 244 Hours
 Date
Hours
Work Log Summary

Details

 10-03-2015
13.00
complete FF wiring + weight and balance
Details
       

 10-02-2015
5.00
FWF wiring and terminations
     

 12-06-2014
4.00
finish flap controller installation
     

 11-13-2014
8.50
complete testing
Details
     

 11-10-2014
4.00
test avionics for proper wiring
Details

 11-05-2014
9.00
finish airframe wiring, power up panel and elec sy
Details
       

 11-04-2014
6.00
finish L sub panel wiring and J1
       

 10-29-2014
8.00
firewall forward wiring
Details
       

 10-27-2014
6.00
install and wire audio jacks
       

 10-25-2014
6.00
airframe wiring cont.
       

 10-23-2014
3.00
airframe wiring cont.
     

 10-22-2014
9.00
airframe wiring cont.
Details
       

 10-21-2014
6.00
battery and fuel gage wiring
       

 10-20-2014
6.00
rebuild main connectors, wire fuel gages

 10-14-2014
8.00
forward airframe wiring
Details
     

 10-13-2014
6.50
airframe wiring cont.
Details
       

 10-12-2014
8.00
wiring cont.
       

 10-07-2014
6.50
install and wire seat heaters
       

 10-06-2014
4.00
wire flap controller
       

 10-04-2014
8.50
airframe wiring cont.
Details
       

 10-03-2014
7.50
wire pitch servo, GPS antenna, adsb antenna, insta
       

 10-02-2014
8.50
fab ELT bracket and install. Install Transponder b
       

 10-01-2014
5.50
finish trim wiring
       

 09-30-2014
6.00
stick grip wiring
Details
       

 09-29-2014
4.00
trim and autopilot wiring
     

 09-27-2014
7.00
fuselage wiring
Details
       

 09-26-2014
8.00
redo contactor configuration and fuel line, plan a
       

 09-25-2014
7.00
finish battery box, mount contactors, cover plate
Details
       

 09-24-2014
4.00
continue battery box construction
       

 09-20-2014
7.00
fabricate custom battery mount for lithium battery
     

 09-13-2014
4.00
mount transponder antenna
Details
       

 09-13-2014
1.00
install ELT antenna
     

 09-12-2014
8.50
finish cb panel, install com and ADSB antennas
       

 09-11-2014
8.00
put fuse back on rotisserrie, begin wiring cb pane
       

 09-09-2014
8.00
begin wiring
Details
       

 05-31-2014
4.00
layout, drill, test fit CB panel
       

 12-29-2013
9.00
create schematics and wiring diagrams
       

 02-16-2013
2.00
work on electrical system design