Powered By Kitlog Pro v2.0
Chad's Challenger II Site
Challenger II Long Wing
Fuselage
Work Logs Found:
42
Category Work Time:
155 Hours
Date
Hours
Work Log Summary
Details
02-02-2008
3.00
Installed Windshield
Details
05-26-2007
8.00
Prepping the Fuselage
Details
05-13-2007
4.00
Instrument Panel Redo
Details
05-12-2007
5.00
Fabricated and Installed Access Panel
Details
05-06-2007
4.00
Panel Access Cover
Details
10-21-2006
4.00
Rear Gap Cover installation
Details
10-20-2006
4.00
Gap Cover continued
Details
10-08-2006
4.00
Installation of Gap Cover Center Section
Details
09-30-2006
3.00
Front Gap Cover Installation
Details
12-26-2005
7.00
Painted some parts with self-etching primer
Details
12-26-2005
0.00
More 12/26 pictures
12-03-2005
3.00
Finished door latches and started throttle cables
Details
11-27-2005
5.00
Door rear windows
Details
09-03-2005
5.00
Door rear panels and latches
Details
08-06-2005
4.00
Left side door glass
Details
07-30-2005
5.00
Right side door glass
Details
06-05-2005
7.00
Building the doors - day 2
Details
06-04-2005
8.00
Building the doors - day 1
Details
05-28-2005
4.00
Misc.
Details
05-22-2005
5.00
Firewall wiring connectors
Details
05-21-2005
4.00
Misc.
Details
05-17-2005
1.00
Finished carry-thru
Details
05-15-2005
5.00
High side rail modification
Details
05-14-2005
2.00
Elevator control horn carry-thru
Details
05-11-2005
1.00
Dorsal Fin part 1
Details
05-08-2005
6.00
Landing gear part 2
Details
05-07-2005
3.00
Gear installation part 1 and misc.
Details
05-05-2005
1.00
Installed belly cross-mdmbers and steering head br
Details
05-04-2005
2.00
Steering head brace - Belly cross-members
Details
04-17-2005
3.00
Bottom firewall plate
Details
04-16-2005
2.00
Installed landing light
Details
04-10-2005
5.00
Rudder pedal modified with bike pedals
Details
03-20-2005
4.00
Finished floorboard
Details
03-13-2005
2.00
Floorboard fabrication
Details
03-09-2005
1.00
Flaperon control adjustments
Details
03-06-2005
1.00
Rudder pedal attachment and planning
Details
03-05-2005
4.00
Misc.
Details
02-26-2005
5.00
Fabric attach plates and battery box
Details
02-20-2005
3.00
Vertical stabilizer and door frame
Details
02-19-2005
2.00
Fuel tank box installation
Details
02-06-2005
2.00
Fuel tank box
Details
02-05-2005
4.00
Nose wheel, tailwheel, seat rivets
Details
SITE NAVIGATION
Contact Builder
Challenger II Long Wing Home
Category
# Logs
# Hours
All
193
693
Avionics
9
19
Controls
4
15
Covering
31
133
Electrical
13
50
Empennage
7
20
Engine
15
43
Fuselage
42
155
Instruments
2
15
Miscellaneous
15
49
None
7
6
Paint
22
96
Wings
26
92
Copyright © 2001-2024 Matronics. All Rights Reserved.