KitLog pro

Powered By Kitlog Pro v2.0

Chad's Challenger II Site
Work Logs Found: 42
Category Work Time: 155 Hours
 Date
Hours
Work Log Summary

Details

 02-02-2008
3.00
Installed Windshield
Details
       

 05-26-2007
8.00
Prepping the Fuselage
Details
       

 05-13-2007
4.00
Instrument Panel Redo
Details
     

 05-12-2007
5.00
Fabricated and Installed Access Panel
Details
       

 05-06-2007
4.00
Panel Access Cover
Details
       

 10-21-2006
4.00
Rear Gap Cover installation
Details
       

 10-20-2006
4.00
Gap Cover continued
Details
       

 10-08-2006
4.00
Installation of Gap Cover Center Section
Details
       

 09-30-2006
3.00
Front Gap Cover Installation
Details
     

 12-26-2005
7.00
Painted some parts with self-etching primer
Details
       

 12-26-2005
0.00
More 12/26 pictures
       

 12-03-2005
3.00
Finished door latches and started throttle cables
Details
       

 11-27-2005
5.00
Door rear windows
Details
       

 09-03-2005
5.00
Door rear panels and latches
Details
       

 08-06-2005
4.00
Left side door glass
Details
       

 07-30-2005
5.00
Right side door glass
Details

 06-05-2005
7.00
Building the doors - day 2
Details
       

 06-04-2005
8.00
Building the doors - day 1
Details

 05-28-2005
4.00
Misc.
Details
       

 05-22-2005
5.00
Firewall wiring connectors
Details
       

 05-21-2005
4.00
Misc.
Details
       

 05-17-2005
1.00
Finished carry-thru
Details
     

 05-15-2005
5.00
High side rail modification
Details
       

 05-14-2005
2.00
Elevator control horn carry-thru
Details
     

 05-11-2005
1.00
Dorsal Fin part 1
Details

 05-08-2005
6.00
Landing gear part 2
Details
       

 05-07-2005
3.00
Gear installation part 1 and misc.
Details
       

 05-05-2005
1.00
Installed belly cross-mdmbers and steering head br
Details
       

 05-04-2005
2.00
Steering head brace - Belly cross-members
Details
       

 04-17-2005
3.00
Bottom firewall plate
Details
       

 04-16-2005
2.00
Installed landing light
Details
       

 04-10-2005
5.00
Rudder pedal modified with bike pedals
Details
       

 03-20-2005
4.00
Finished floorboard
Details
       

 03-13-2005
2.00
Floorboard fabrication
Details

 03-09-2005
1.00
Flaperon control adjustments
Details
     

 03-06-2005
1.00
Rudder pedal attachment and planning
Details

 03-05-2005
4.00
Misc.
Details
       

 02-26-2005
5.00
Fabric attach plates and battery box
Details
       

 02-20-2005
3.00
Vertical stabilizer and door frame
Details
     

 02-19-2005
2.00
Fuel tank box installation
Details
       

 02-06-2005
2.00
Fuel tank box
Details
       

 02-05-2005
4.00
Nose wheel, tailwheel, seat rivets
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.