Powered By Kitlog Pro v2.0
Mark's Web Site
RV-12
Empennage
Work Logs Found:
76
Category Work Time:
176 Hours
Date
Hours
Work Log Summary
Details
09-10-2018
2.00
Tail cone install (12-11)
Details
09-09-2018
2.00
Tail cone plate nuts (12-10)
Details
08-19-2018
0.50
Trim tab (7A-02)
Details
05-20-2018
0.50
Tail cone install (12-09)
Details
05-18-2018
0.50
Tail cone (12-08)
Details
05-17-2018
0.50
Tail cone install (12-07)
Details
05-16-2018
1.00
Start tail cone install (12-05)
Details
07-20-2017
0.50
Trim Tab Installation (11-08)
Details
07-19-2017
0.50
Trip tabs installed (11-08)
Details
01-25-2017
4.00
Attach stabilator (11-03 & 32-13)
Details
08-16-2014
2.00
Trim Servo Molex connections (11-07)
Details
08-09-2014
1.00
Hanging up the Empennage
Details
08-04-2014
2.00
Trim Servo Pushrod Assembly
Details
07-21-2014
2.00
Servo tray - round 2 (11-05)
Details
07-19-2014
1.00
Servo Tray prep (11-05)
Details
06-23-2014
2.00
Final attachment for Empennage skins (10-11)
Details
06-21-2014
4.00
Prep and install top skin (10-11)
Details
06-19-2014
3.00
Attach bracket and prep top plate (10-11)
Details
06-07-2014
6.00
Rivet side and upper side skins in place (10-10)
Details
06-05-2014
1.00
F-1238 bracket prep and drill (10-10)
Details
06-04-2014
4.00
Tailcone upper left skin prep (10-10)
Details
05-19-2014
1.00
Staic Port installation (10-09)
Details
05-17-2014
1.00
Routing wire and control cable string (10-08)
Details
05-15-2014
5.00
Side Skin Installation (10-08)
Details
05-14-2014
1.00
Stabilator Hinge Washer placement (10-05)
Details
05-12-2014
4.00
Finished lower skin installation (10-07)
Details
05-10-2014
6.00
Lower skin intallation (10-07)
Details
05-09-2014
4.00
Clecoed Bottom skins and tail cone frames (10-06)
Details
05-08-2014
3.00
Attach J-stiffners to bottom skins (10-06)
Details
04-22-2014
2.00
Attaching J-stiffner to bottom skin (10-06) and sq
Details
04-19-2014
5.00
Bottom tail cone skin preperation (10-06)
Details
04-17-2014
2.00
Talked to VANS about missing part (10-04)
Details
04-12-2014
0.00
Missing parts from bulkhead assembly (10-04)
Details
04-10-2014
4.00
Fuselage bulkhead assembly (10-04)
Details
04-08-2014
6.00
Fuselage bulkhead prep (10-03)
Details
04-07-2014
3.00
FabricatedTail skid bracket (10-03)
Details
04-05-2014
3.00
Started Fuselage frames (10-02)
Details
04-04-2014
1.00
Hang up Stabilator and start tail cone
Details
04-03-2014
1.00
Control Horn Installation (09-10)
Details
03-31-2014
2.00
Aft Stabilator attachment (09-09)
Details
03-29-2014
4.00
Stabilator skin installation (09-08)
Details
03-28-2014
1.00
Stabilator main skin installation (09-08)
Details
03-27-2014
1.00
Hinge bracket installation (09-07)
Details
03-22-2014
5.00
Horizontal Stabilizer skeleton (09-06)
Details
03-14-2014
5.00
Spar box assembly (09-04)
Details
03-13-2014
3.00
Drill nut plate holes and hinge brakets (09-04)
Details
03-11-2014
2.00
Spar Box assembly (09-03)
Details
03-10-2014
1.00
HS- spar cap assembly (09-03)
Details
03-08-2014
3.00
Stabilator Spar cap assembly
Details
03-01-2014
2.00
Deburring spar caps (09-02)
Details
02-22-2014
2.00
Countersink 101 (09-02)
Details
02-21-2014
2.00
Start Horizontal Stabilizer (09-02)
Details
02-15-2014
4.00
Anti-servo tab (08-03 & 08-04)
Details
02-11-2014
2.00
Anti-servo tab (08-02)
Details
02-08-2014
3.00
Rudder completion (07-04 & 07-05)
Details
02-04-2014
2.00
Rudder skeleton assembly (07-03)
Details
02-01-2014
2.00
Start rudder assembly (07-02)
Details
02-01-2014
1.00
Rudder fit check with VS (07-03)
Details
01-18-2014
2.00
Finished VS skin (06-07)
Details
01-16-2014
3.00
Started riveting VS skin (06-07)
Details
01-15-2014
3.00
VS fit check (06-07)
Details
01-14-2014
3.00
VS skin prep (06-06)
Details
01-11-2014
3.00
Prep & prime VS spar and ribs (06-05)
Details
01-09-2014
2.00
Rivet spar caps to rear spar (06-05)
Details
01-09-2014
0.00
Complete rear spar assembly (06-05)
Details
01-08-2014
0.50
Rivetting lower spar cap to VS spar (06-05)
Details
01-04-2014
1.00
Waiting on parts, so did some advance prep work on
Details
01-03-2014
2.00
VS Fwd skin and Main skin prep work (06-06)
Details
01-02-2014
0.50
The good the bad and the ugly (06-04)
Details
01-01-2014
5.00
Vertical Stabilizer Spar (06-04)
Details
12-31-2013
2.00
Organized, practiced and set first rivets (06-02)
Details
12-30-2013
3.00
Repair dent on VS, build paint booth (06-02)
Details
12-28-2013
2.00
Upper & Lower hinge assembly (06-02)
Details
12-27-2013
2.00
Started vertical stabilizer (06-02)
Details
12-26-2013
0.00
Storage shelves for empennage kit parts
Details
12-25-2013
3.00
Day One
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
632
1257
Avionics
23
22
Certification
1
1
Empennage
76
176
Engine
67
78
Finishing
144
290
Flight
3
Fuselage
163
348
Miscellaneous
2
None
9
3
Paint
24
50
PAP
14
18
Service Bulletin
21
30
Shop Supplies
4
Tools
2
Wings
79
241
Copyright © 2001-2024 Matronics. All Rights Reserved.