Powered By Kitlog Pro v2.0
Kents RV-10 Construction Site
RV-10
Fuel Tanks
Work Logs Found:
47
Category Work Time:
118 Hours
Date
Hours
Work Log Summary
Details
11-04-2013
3.75
Fuel Tank Attach
Details
09-02-2013
4.00
Fuel Tank Testing
Details
05-07-2013
0.75
Fuel Tank Final Assembly
Details
05-04-2013
3.50
Fuel Tank Final Assembly
Details
04-22-2013
3.25
Fuel Tank Final Assembly
Details
04-21-2013
1.00
Fuel Tank Final Assembly
Details
04-20-2013
1.50
Fuel Tank Final Assembly
Details
04-18-2013
1.50
Fuel Tank Final Assembly
Details
04-17-2013
1.50
Fuel Tank Final Assembly
Details
04-16-2013
1.50
Fuel Tank Final Assembly
Details
04-14-2013
2.00
Fuel Tank Final Assembly
Details
04-07-2013
1.00
Fuel Tank Final Assembly
Details
04-06-2013
1.00
Fuel Tank Final Assembly
Details
04-04-2013
1.75
Fuel Tank Final Assembly
Details
04-02-2013
1.75
Fuel Tank Final Assembly
Details
04-01-2013
1.00
Fuel Tank Final Assembly
Details
03-25-2013
1.50
Fuel Tank Final Assembly
Details
03-20-2013
4.50
Fuel Tank Final Assembly
Details
03-19-2013
1.50
Fuel Tank Final Assembly
Details
03-18-2013
2.00
Fuel Tank Final Assembly
Details
03-17-2013
2.25
Fuel Tank Final Assembly
Details
03-16-2013
1.50
Fuel Tank Final Assembly
Details
03-15-2013
1.50
Fuel Tank Final Assembly
Details
03-13-2013
1.50
Fuel Tank Final Assembly
Details
03-12-2013
1.50
Fuel Tank Final Assembly
Details
03-11-2013
1.75
Fuel Tank Final Assembly
Details
03-09-2013
2.00
Fuel Tank Final Assembly
Details
03-05-2013
1.75
Fuel Tank Final Assembly
Details
03-02-2013
2.00
Fuel tank final assembly
Details
02-18-2013
8.50
Fuel Tank Final Assembly
Details
02-16-2013
1.50
Fuel tank prep
Details
02-13-2013
0.75
Fuel tank misc.
Details
02-09-2013
3.75
Fuel tank prep
Details
01-19-2013
8.00
Fuel tank prep
Details
01-03-2013
15.50
Fuel tank skin prep
Details
12-14-2012
1.75
Fuel tank skin
Details
12-07-2012
2.50
Fuel tank initial assembly
Details
12-04-2012
1.50
Fuel tank initial assembly
Details
12-03-2012
1.00
Fuel tank
Details
12-02-2012
2.00
Fuel tank baffles and attach Zee's
Details
12-01-2012
2.50
Fuel cap flange and tank attach Zee's
Details
11-30-2012
1.00
Fuel tank ribs and filler flange
Details
11-24-2012
2.00
Fuel tank stiffeners and ribs
Details
11-18-2012
1.75
Fuel tank stiffeners
Details
11-17-2012
1.25
Fuel tank ribs
Details
11-13-2012
4.25
Fuel tank stiffeners
Details
11-05-2012
3.00
Fuel tank rib straightening
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1063
2301
Access Covers and Fl
18
36
Aileron
23
53
Aileron Actuation
8
26
Air Conditioning
112
197
Avionics
52
94
Baggage Area
19
36
Baggage Door
10
20
Bottom Wing Skins
28
82
Brake Lines
6
13
Cabin Cover
16
26
Cabin Doors and Tran
15
28
Control System
14
34
Elevators
42
81
Empennage Attach
20
30
Empennage Fairings
13
22
Engine Mount and Lan
25
47
Firewall
25
56
Firewall Forward
6
12
Flap System
11
20
Flaps
23
82
For. Fuse Ribs, BHDS
31
85
Fuel System
13
28
Fuel Tanks
47
118
Fuselage
3
6
Fuselage Side Skins
68
149
Horizontal Stab
38
67
Horizontal Stabilize
38
67
Landing Lights
7
20
Mid Fuse Bulkheads
14
44
Mid Fuse Ribs & Bott
20
80
Miscellaneous
1
0
Outboard Leading Edg
30
59
Pitot-Static-AOA
1
1
Rear Seat Backs
1
2
Rear Spar
9
22
Rudder
17
31
Rudder Pedals and Br
9
20
Seats and Seat Belts
1
2
Stall Warning System
3
4
Step Installation
4
8
Tailcone
64
115
Tailcone Attachment
41
79
Top Wing Skins
12
56
Upper Forward Fusela
27
48
Vertical Stabilizer
21
40
Wing Main Spar
19
31
Wing Ribs
10
46
Wing Tip
13
47
Wiring
15
31
Copyright © 2001-2024 Matronics. All Rights Reserved.