Powered By Kitlog Pro v2.0
GLENN'S WEB SITE
AirCam
Vertical Stab
Work Logs Found:
46
Category Work Time:
71 Hours
Date
Hours
Work Log Summary
Details
12-27-2013
0.70
Fin cap rib
Details
12-22-2013
2.00
Fin cap
Details
12-18-2013
1.90
Finished riveting right side skins
Details
12-17-2013
1.00
Push rod lugs
Details
12-17-2013
0.10
Front spar attachement hardware.
12-17-2013
1.00
Clecoed skins to right side
Details
12-12-2013
0.10
counter weight
Details
12-11-2013
1.70
elevator push rod
Details
12-11-2013
1.50
elevator horn
Details
12-07-2013
1.10
left side skins and spar doublers
Details
12-06-2013
1.50
Leading edge skin
Details
12-06-2013
0.60
Attached stringers to skins
Details
12-05-2013
0.40
VS-010 and VS-013
Details
12-05-2013
0.40
Top rudder hinge braket VS-012
Details
12-05-2013
0.40
spar cable attachment braket
Details
12-05-2013
0.20
Shear plate VS-023
Details
12-05-2013
1.50
Ribs to spars
Details
12-05-2013
0.70
left and right elevator hinge brakets to spar
Details
12-05-2013
1.20
Inspection covers redone
Details
12-05-2013
1.80
inspection cover doublers and covers
Details
12-05-2013
0.40
Compression bracket
Details
12-05-2013
0.20
Attached VS-019 rudder hinge assembly
Details
12-04-2013
3.00
Sprayed epoxy primer EC117
Details
12-03-2013
3.40
treated parts with Aluma-Dyne E2310
Details
11-26-2013
3.50
pre sand parts for corrosion protection
Details
11-15-2013
2.00
prep fpr corrosion protection
Details
11-14-2013
3.00
corrosuon protection prep
Details
11-10-2013
4.00
polishing of spar doublers
Details
11-09-2013
2.00
Step drilling VS-010, and 013
Details
11-09-2013
1.00
step drill part #VS-015 to top inspar
11-09-2013
2.00
inspection covers and doublers
Details
11-08-2013
0.40
VS-023
Details
11-07-2013
1.50
Step drilled vs-014 and VS-010
11-07-2013
1.50
Details
11-07-2013
1.80
Details
11-04-2013
1.50
Step drilled VS-017 and VS-016
Details
11-01-2013
1.00
Nose spars and in spars
Details
10-30-2013
1.50
De burred skins and doublers
Details
10-29-2013
1.50
take apart skins
Details
10-27-2013
2.50
drilled al to #29, then over spars to #19
10-26-2013
1.50
Drilled to #29
Details
10-24-2013
2.50
drilled out to #40
Details
10-24-2013
4.50
drilled from #40 to #29 then #19 over spars
Details
10-22-2013
3.00
Drilled all hole to #40
Details
10-21-2013
1.50
Parts inventory
Details
10-21-2013
0.10
First hole drilled and Clecoed
SITE NAVIGATION
Contact Builder
AirCam Home
Category
# Logs
# Hours
All
284
547
Ailerons
10
16
Center wing
91
229
Elevator trim tab.
6
3
Elevators
22
36
Flaps
6
12
Fuel Tanks
20
43
Fuselage
2
3
Horizontal Stabilize
38
63
Paint booth
1
8
Rudder
19
30
Tools
1
0
Vertical Stab
46
71
Wings
22
33
Copyright © 2001-2024 Matronics. All Rights Reserved.