Powered By Kitlog Pro v2.0
RV-7
RV-7
Tanks
Work Logs Found:
27
Category Work Time:
92 Hours
Date
Hours
Work Log Summary
Details
12-14-2013
2.00
Leak tested the tanks
Details
11-17-2013
3.00
Install left tank baffle
Details
11-16-2013
3.50
Install right rear baffle
Details
11-09-2013
4.50
Riviting the tanks .. 5
Details
11-03-2013
4.00
Anti hangup fixtures and trap door
Details
11-02-2013
4.00
Capacitaive fuel sender install
Details
10-27-2013
4.50
Riveting the tanks .. 4
Details
10-26-2013
5.00
Riveting the tanks .. 3
Details
10-24-2013
1.00
Riveting the tanks .. 2
Details
10-20-2013
4.00
Riveting the tanks .. 1
Details
10-19-2013
1.00
Forward inboard tank bracket (do over)
Details
10-17-2013
1.50
Prep of inboard tank ribs
Details
10-13-2013
6.00
Sealing right tank inside ribs
Details
10-12-2013
4.50
Sealing left tank inside ribs
Details
10-06-2013
4.00
Stiffener install
Details
10-05-2013
6.50
Final tank prep
Details
10-03-2013
1.00
Dimpled right skin
Details
09-29-2013
5.00
Caps and drains and senders
Details
09-22-2013
4.00
Fabricate forward attach bracket
Details
09-22-2013
4.50
Drilling the z brackets - left wing
Details
09-21-2013
5.00
Drilling the z-brackets - Right wing
Details
09-14-2013
5.50
Initial fit of tanks on spars
Details
09-13-2013
1.50
Fabricate tank stiffiners
Details
09-12-2013
2.00
Initial install of brackets to spars
Details
09-10-2013
1.00
Riveting nutplates onto Z-brackets
Details
09-08-2013
2.00
Drilling brackets to spars
Details
09-07-2013
2.00
Starting the tanks
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
495
2357
Avionics
33
180
Empennage
74
222
Engine
35
180
Finishing
93
533
Firewall forward
30
136
Fuselage
117
665
Miscellaneous
3
2
None
1
6
Prop
1
3
Service Bulletins
4
19
Tanks
27
92
Tools
7
11
Wings
70
308
Copyright © 2001-2025 Matronics. All Rights Reserved.