The Rosel Boys RV 8
RV-8
Fuselage
Work Logs Found:
79
Category Work Time:
652 Hours
Date
Hours
Work Log Summary
Details
01-17-2017
6.00
Upper/Lower gear leg fairings and pants
Details
12-27-2016
10.00
Wheel pant prep/paint
Details
12-19-2016
12.00
Canopy skirt prep/paint; Upper gear fairing
Details
11-21-2016
3.00
Bleed Brakes
Details
11-18-2016
18.00
Oil door/APU door
Details
11-14-2016
0.00
Front windshield pics
11-14-2016
60.00
Front windshield install
Details
10-10-2016
10.00
Baggage door latch
Details
09-23-2016
26.00
Top forward skin install/Wing tips/Fairings/Wing R
Details
08-31-2016
26.00
Fiberglass fairings & Flap positioning system
Details
08-15-2016
6.00
Missing fuselage screws installed!
Details
06-24-2016
16.00
Wheel Fairing/Canopy Taxi Position Tab
Details
05-03-2016
16.00
Flap positioning system
Details
04-15-2016
12.00
Stick Grips
Details
04-06-2016
23.00
Wiring install through bulkheads
Details
02-26-2016
15.00
Air vent install
Details
02-10-2016
10.00
Heater box
Details
12-28-2015
8.00
Painting Interior
Details
12-17-2015
8.00
Heat knob/Baffle Seal
Details
09-30-2015
18.00
Cowling fit and finish
Details
08-24-2015
14.00
Throttle Quads/Cowling Hinges
Details
08-14-2015
12.00
Lower Cowling/Cowling Hinges
Details
07-31-2015
12.00
Rear Throttle Quadrant
Details
07-15-2015
12.00
Cowling Fit
Details
04-18-2015
8.00
Wheel pants; Receive firewall forward kit
Details
04-07-2015
4.00
Gear leg fairings
Details
04-06-2015
8.00
Brake Lines
Details
04-02-2015
4.00
Wheel Install
Details
04-02-2015
0.00
Axle Alignment Pics
03-17-2015
10.00
Canopy Latch
Details
03-08-2015
6.00
Canopy rivet to frame
Details
03-05-2015
9.00
Canopy
Details
03-02-2015
6.00
Canopy skirt
Details
03-01-2015
5.00
Canopy skirt
Details
02-28-2015
4.00
Canopy
Details
02-19-2015
5.00
Canopy skirt
Details
02-16-2015
6.00
Canopy: Finish drill and Big Cut
Details
02-07-2015
12.00
Canopy frame
Details
02-04-2015
6.00
Canopy Rail
Details
01-14-2015
2.00
Wings: Initial install
Details
11-23-2014
2.00
EAA Inspection
Details
11-11-2014
6.00
Baggage Door
Details
10-23-2014
4.00
Fuselage Naca Scoop
Details
10-20-2014
3.00
Windshield Support
Details
10-19-2014
3.00
Fuse: control mount
Details
10-13-2014
5.00
Fuse: Floor construction
Details
10-12-2014
3.00
Fuse: Seatback
Details
10-11-2014
4.00
Fuse: Seatback
Details
10-09-2014
5.00
Fuse: Seatback assembly
Details
09-15-2014
4.00
Forward Top Skin
Details
09-01-2014
13.00
Aft Upper Skin Install
Details
08-30-2014
4.00
Aft Upper Skin
Details
08-29-2014
2.00
WD 814 Poor fit
Details
08-20-2014
8.00
Aft Bulkheads
Details
08-11-2014
2.00
Static System
Details
08-09-2014
8.00
Brake Installation
Details
08-01-2014
6.00
Fuel System and Vent Line Install
07-30-2014
9.00
Fuel System Install
Details
07-25-2014
16.00
Rear Rudder Assemby
Details
07-23-2014
10.00
Brake and Rudder Assemby Contstruction
07-22-2014
4.00
Brake and Rudder Assemby Contstruction
07-21-2014
6.00
Brake and Rudder Assemby Contstruction
07-18-2014
6.00
Rudder Install
Details
07-17-2014
6.00
Control Arms
Details
07-15-2014
6.00
Pushrod Assembly continued
Details
07-14-2014
4.00
F840 & F841 Pushrod Assembly
Details
07-13-2014
2.00
F-635 Bellcrank Assembly
Details
07-11-2014
1.00
Vert Stab Continued
07-09-2014
1.00
Vertical Stab install continued
07-08-2014
6.00
Align and Install Vert Stab
07-05-2014
6.00
Horizontal Stab align and install
Details
07-01-2014
3.00
Horiz Stab Install
Details
06-30-2014
5.50
Fuse: Floor
Details
06-28-2014
4.00
Fuse: Floors
Details
06-26-2014
4.00
Fuse: Floors
Details
06-25-2014
5.00
Fuse: Seatbacks
Details
06-05-2014
10.00
Fuse: Landing Gear
Details
05-18-2014
4.00
Fuse: Landing Gear
Details
10-20-2013
4.00
Fuselage: Delivery
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
208
1591
Avionics
12
189
Empennage
43
209
Engine
28
298
Fuselage
79
652
Miscellaneous
10
95
Shop Supplies
2
4
Wings
34
144