KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
Work Logs Found: 17
Category Work Time: 58 Hours
 Date
Hours
Work Log Summary

Details

 06-24-2018
2.00
Rudder are stop.
Details
       

 06-21-2018
2.00
Finish working on the rudder cable system.
Details
     

 06-20-2018
6.00
Rigging the roll system to operate the ailerons.
Details
       

 06-19-2018
8.00
Heat protection done. Cable wheels in place.
Details
       

 02-15-2018
3.00
Remove wing and move fuselage in shop.
Details
       

 02-13-2018
8.00
Worked on getting the rudder on the Pilot side.
Details
       

 02-13-2018
0.00
Clean up mess and make petal stop.
Details
       

 02-01-2018
6.00
Rudder cable pulleys installation.
Details
       

 01-25-2018
0.00
Aileron torque tube.
Details
       

 01-25-2018
6.00
Aileron torque tube installation.
Details
       

 12-07-2017
2.00
Time to work on the rudder cables.
Details
       

 12-12-2015
6.00
Fit torque tubes into fuselage, install stick push
Details
       

 12-01-2015
3.00
I got the trim actuator set up and bolted
Details
       

 11-30-2015
1.00
Trim base bolted up
Details
     

 11-28-2015
1.00
Trim base
Details
       

 11-26-2015
1.00
Elevator trim base
Details
     

 11-14-2013
3.50
Lay - up the dog house
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.