Powered By Kitlog Pro v2.0
JAMESs Web Site
VELOCITY- XLRG
Control System
Work Logs Found:
17
Category Work Time:
58 Hours
Date
Hours
Work Log Summary
Details
06-24-2018
2.00
Rudder are stop.
Details
06-21-2018
2.00
Finish working on the rudder cable system.
Details
06-20-2018
6.00
Rigging the roll system to operate the ailerons.
Details
06-19-2018
8.00
Heat protection done. Cable wheels in place.
Details
02-15-2018
3.00
Remove wing and move fuselage in shop.
Details
02-13-2018
8.00
Worked on getting the rudder on the Pilot side.
Details
02-13-2018
0.00
Clean up mess and make petal stop.
Details
02-01-2018
6.00
Rudder cable pulleys installation.
Details
01-25-2018
0.00
Aileron torque tube.
Details
01-25-2018
6.00
Aileron torque tube installation.
Details
12-07-2017
2.00
Time to work on the rudder cables.
Details
12-12-2015
6.00
Fit torque tubes into fuselage, install stick push
Details
12-01-2015
3.00
I got the trim actuator set up and bolted
Details
11-30-2015
1.00
Trim base bolted up
Details
11-28-2015
1.00
Trim base
Details
11-26-2015
1.00
Elevator trim base
Details
11-14-2013
3.50
Lay - up the dog house
Details
SITE NAVIGATION
Contact Builder
VELOCITY- XLRG Home
Category
# Logs
# Hours
All
847
2528
Brakes
3
10
Bulkheads
1
1
Canard/Elevator
49
122
Control System
17
58
Doors/Windows
78
192
Electrical/Instrumen
21
66
Engine/Propeller
141
432
Fairings
10
34
Filling to priming
155
533
Final Assembly/Finis
1
2
Fuel System
137
407
Fuselage
75
194
Inspections
1
1
Instrument Panel
7
20
Interior
52
192
Kit Purchase/Conditi
2
26
Landing Gear/RG
30
103
Painting
2
8
Shop
5
16
Time away from build
18
Tools
2
5
Wheels/Axles
4
10
Wings/Winglets
36
96
Copyright © 2001-2024 Matronics. All Rights Reserved.