Powered By Kitlog Pro v2.0
DENNIS'S WEB SITE
RV-10
Fuselage
Work Logs Found:
93
Category Work Time:
481 Hours
Date
Hours
Work Log Summary
Details
06-04-2016
4.00
Seat belts and panel wiring
Details
04-17-2016
5.00
Antenna installation
Details
08-30-2015
3.00
Flap position indicator and magnetometer
Details
08-29-2015
5.00
Wheel pants
Details
08-26-2015
3.00
wheel pants
Details
08-25-2015
3.00
Wheel pants, propellar and wing tips
Details
08-23-2015
5.00
Wheel pant fairings
Details
07-02-2015
2.50
fiberglas work
Details
07-01-2015
2.50
fiberglas
Details
05-31-2015
5.00
Defrost fans
Details
05-27-2015
8.50
Fairing doors to cabin
Details
05-25-2015
6.00
Doors
Details
05-24-2015
7.00
Windscreen
Details
05-23-2015
8.00
windscreen
Details
05-23-2015
8.00
Windscreen
Details
05-22-2015
3.00
Defrost fans
Details
05-21-2015
2.50
windscreen
Details
05-21-2015
2.50
Windscreen
Details
05-20-2015
3.00
Windscreen
Details
05-20-2015
3.00
Windscreen
Details
05-15-2015
6.00
Windshield
Details
05-13-2015
5.00
Upper skin overlying instrument panel
Details
05-08-2015
3.00
Overhead lighting
Details
03-22-2015
3.00
Overhead console lighting
Details
02-21-2015
6.00
Wiring
Details
02-07-2015
10.00
Doors and interior cabin painting
Details
01-31-2015
8.00
Door and cabin windows
Details
01-25-2015
8.00
Door windows
Details
01-15-2015
8.00
Door window
Details
01-02-2015
6.00
Door
Details
12-23-2014
3.00
Filling space between cabin top and fuselage
Details
12-16-2014
4.00
Cabin top and doors
Details
12-14-2014
6.00
Cabin overhead console
Details
12-10-2014
4.00
Doors
Details
12-07-2014
4.00
Overhead console
Details
10-22-2014
4.00
Overhead air circulation
Details
10-20-2014
6.00
Fuel line
Details
10-11-2014
3.00
Fuel valve
Details
10-11-2014
3.00
Fuel valve
Details
10-11-2014
3.00
Cowl attachment hinges
Details
10-04-2014
5.00
Cabin preparation
Details
09-29-2014
1.00
Cabin attachment
Details
09-29-2014
1.00
Cabin attachment
Details
09-28-2014
8.00
Cabin top
Details
09-25-2014
6.00
Control systems
Details
09-16-2014
7.00
rear seat backs
Details
09-10-2014
4.00
Flaps
Details
09-09-2014
3.00
Brake lines
Details
09-01-2014
5.00
Brake lines
Details
08-29-2014
8.00
Painting
Details
08-23-2014
5.00
Rudder pedals and brakes
Details
08-17-2014
7.00
Closeout panels
Details
08-13-2014
3.00
Baggage door
Details
08-03-2014
6.00
Baggage door
Details
07-24-2014
7.00
Baggage compartment
Details
07-16-2014
8.00
Baggage floor
Details
07-06-2014
4.00
Routing conduit
Details
06-27-2014
10.00
Join fuselage to empennage
Details
05-25-2014
5.00
Step installation
Details
05-24-2014
4.00
Landing gear mounts
Details
05-23-2014
4.00
Floor pans and landing gear mount
Details
05-22-2014
6.00
Riveting skins
Details
05-17-2014
8.00
Fwd and Mid side skins to fuselage
Details
05-07-2014
7.00
Preparing side skins for riveting
Details
05-01-2014
8.00
preparing the aluminum
Details
04-25-2014
5.00
Fwd side skins to frame
Details
04-13-2014
3.00
Adding side skins
Details
04-12-2014
6.00
Construction
Details
04-04-2014
13.00
landing gear mount
Details
03-20-2014
6.00
attaching fuselage parts
Details
03-10-2014
5.00
Joining fwd and center fuselage assemblies
Details
03-08-2014
9.50
Details
03-02-2014
4.50
Begining to rivet fwd fuselage subassembly
Details
03-01-2014
7.00
Fuselage construction
Details
02-24-2014
2.00
Forward floor panels
Details
02-22-2014
6.00
Forward fuselage
Details
02-17-2014
1.50
Forward bulkhead
Details
02-16-2014
8.00
Forward Bulkhead Construction
Details
02-14-2014
2.50
Foreward fuselage ribs, bulkheads, and bottom skin
Details
02-07-2014
3.00
Panel access to tunnel
Details
02-03-2014
3.00
Firewall
Details
01-30-2014
3.00
firewall
Details
01-18-2014
7.00
Riveting the lower skins
Details
01-08-2014
11.00
seat subassembly
Details
01-04-2014
4.50
Seat assembly
Details
01-03-2014
3.00
seat subassembly
Details
01-01-2014
6.00
Mid fuselage bulkheads
Details
12-22-2013
4.00
seat subassemblies
Details
12-20-2013
4.00
Inboard seat assemblies
Details
12-11-2013
8.00
bulkheads
Details
12-04-2013
4.00
FWD center section bulkhead
Details
12-01-2013
5.00
main spar
Details
11-14-2013
4.00
Fuselage arrival and inventory
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
343
1641
Avionics
26
157
Doors
12
62
Empennage
105
371
Engine
32
198
Firewall
6
19
Fuselage
93
481
Instrument Panel
6
38
Kit Arrival
1
4
Landing gear
14
85
Miscellaneous
5
26
Vertical Stabelizer
1
2
Wings
1
4
Wings
40
190
Wings
1
4
Copyright © 2001-2024 Matronics. All Rights Reserved.