Date
|
Hours
|
Work Log Summary

|
Details

|
09-10-2018
|
1.50
|
Fixing the wingtip countersinks
|
Details
|
 |
|
09-09-2018
|
1.00
|
Fixing the wingtip countersinks
|
Details
|
 |
|
07-29-2018
|
2.00
|
Wingtip lenses
|
Details
|
|
|
07-21-2018
|
1.00
|
Wingtip trailing edge adjustment 4
|
Details
|
 |
|
07-20-2018
|
2.00
|
Wingtip trailing edge adjustment 3
|
Details
|
|
|
07-19-2018
|
2.00
|
Wingtip trailing edge adjustment 2
|
Details
|
 |
|
07-18-2018
|
1.50
|
Wingtip trailing edge adjustment 1
|
Details
|
|
|
07-17-2018
|
0.50
|
Wingtip notes
|
Details
|
  |
|
07-14-2018
|
1.00
|
Wingtip riveting
|
Details
|
|
|
07-14-2018
|
1.00
|
Wingtip adjustments
|
Details
|
|
|
06-03-2018
|
2.00
|
Wing tip hinge
|
Details
|
|
|
06-03-2018
|
2.00
|
Drilled the wingtip
|
Details
|
  |
|
06-02-2018
|
3.00
|
Started wing tips
|
Details
|
|
|
06-02-2018
|
1.00
|
Drilled left wing tip
|
Details
|
|
|
04-28-2018
|
2.00
|
Pitot access panel
|
Details
|
|
|
04-09-2018
|
0.50
|
Now the wings are done
|
Details
|
|
|
04-08-2018
|
4.00
|
Finished the left wing
|
Details
|
|
|
04-07-2018
|
3.00
|
Started the last wing skin riveting
|
Details
|
  |
|
04-05-2018
|
2.00
|
Brace for pitot wiring and stall warning wire
|
Details
|
  |
|
04-03-2018
|
1.00
|
|
Details
|
|
|
03-27-2018
|
1.50
|
Right wing outer bottom skin - 4
|
Details
|
 |
|
03-26-2018
|
1.50
|
Right wing outer bottom skin - 3
|
Details
|
  |
|
03-25-2018
|
4.00
|
Right wing outer bottom skin - 2
|
Details
|
 |
|
03-24-2018
|
4.00
|
Right wing outer bottom skin - 1
|
Details
|
|
|
03-23-2018
|
1.50
|
Finishing Stall warning inspection cover
|
Details
|
|
|
03-20-2018
|
1.50
|
Started stall warning inspection cover
|
Details
|
 |
|
03-20-2018
|
1.00
|
SB 16-03-28 - 3
|
Details
|
|
|
03-18-2018
|
1.00
|
SB 16-03-28 - 2
|
Details
|
 |
|
03-18-2018
|
2.00
|
SB 16-03-28 - 1
|
Details
|
|
|
01-14-2018
|
2.00
|
Dimpled both bottom outboard skin
|
Details
|
  |
|
01-12-2018
|
1.00
|
Riveted inspection cover nutplates
|
Details
|
  |
|
01-07-2018
|
4.50
|
Primed the outboard bottom skins
|
Details
|
|
|
12-26-2017
|
0.50
|
Modified grommets
|
Details
|
|
|
12-22-2017
|
1.50
|
Cut and drilled the elevator pushrod
|
Details
|
  |
|
12-20-2017
|
2.00
|
Aileron pushrod
|
Details
|
  |
|
12-18-2017
|
1.00
|
Finished the right inboard bottom skin
|
|
  |
|
12-17-2017
|
6.50
|
Continue rivet the right inboard bottom skin
|
Details
|
|
|
12-16-2017
|
3.00
|
Riveted on the right flap brace
|
Details
|
  |
|
12-14-2017
|
0.50
|
Riveted on nutplate on the flap brace
|
|
  |
|
12-13-2017
|
2.00
|
Primed the right flap brace
|
|
  |
|
12-12-2017
|
1.00
|
Made split hinge pins for flaps
|
Details
|
  |
|
12-11-2017
|
3.00
|
Drilled the right flap hinge
|
Details
|
  |
|
12-11-2017
|
2.00
|
Dimpling the right inboard bottom skin
|
Details
|
  |
|
12-10-2017
|
1.50
|
Drilled the right flap hinge
|
Details
|
 |
|
12-09-2017
|
8.00
|
Riveted on left inboard bottom skin
|
Details
|
|
|
12-06-2017
|
1.00
|
Added RTV to the conduits
|
Details
|
|
|
12-04-2017
|
0.50
|
Prepping for skin riveting
|
Details
|
  |
|
12-03-2017
|
2.50
|
Dimpled left inboard bottom skin
|
Details
|
|
|
12-02-2017
|
2.50
|
Riveted the bulkhead doubler
|
Details
|
|
|
11-27-2017
|
1.00
|
Primed the bulkhead doubler
|
Details
|
  |
|
11-26-2017
|
1.50
|
Installed pitot and AOA bulkhead fitting
|
Details
|
 |
|
11-25-2017
|
2.50
|
Primed the inboard bottom skins
|
|
 |
|
11-24-2017
|
3.00
|
Deburred the inboard bottom skins
|
Details
|
  |
|
01-07-2016
|
1.00
|
Flap hinge pin fastening nutplate
|
Details
|
  |
|
12-31-2015
|
3.00
|
Riveted right aileron brackets
|
Details
|
|
|
12-31-2015
|
2.00
|
Aileron bracket adjustment
|
Details
|
|
|
12-27-2015
|
2.00
|
Aileron brace for right wing
|
Details
|
|
|
12-25-2015
|
1.00
|
Flap brace for left wing
|
Details
|
|
|
12-13-2015
|
4.00
|
Riveted Right top skin
|
Details
|
 |
|
12-05-2015
|
2.00
|
Wing Stand Support
|
Details
|
|
|
11-29-2015
|
4.00
|
inboard upper skin riveted
|
Details
|
  |
|
07-20-2015
|
1.00
|
Baffle inspection
|
Details
|
|
|
07-19-2015
|
3.00
|
Fuel tank baffle
|
Details
|
|
|
07-05-2015
|
4.00
|
Proseal fuel tank components
|
Details
|
|
|
06-23-2015
|
4.00
|
Riveted fuel tank
|
Details
|
 |
|
06-20-2015
|
3.00
|
Fuel tank ribs
|
Details
|
|
|
06-17-2015
|
2.00
|
Leading edge lights
|
Details
|
|
|
06-14-2015
|
3.00
|
Riveting Fuel Tank Root Rib
|
Details
|
|
|
06-10-2015
|
2.00
|
Last Night Work Revisited
|
Details
|
|
|
06-09-2015
|
3.00
|
Fuel cap
|
Details
|
  |
|
06-07-2015
|
1.00
|
Fuel tank inspection
|
Details
|
  |
|
06-06-2015
|
3.00
|
Introducing Proseal
|
Details
|
  |
|
06-05-2015
|
2.00
|
Right Fuel Tank Root Rib
|
Details
|
 |
|
06-03-2015
|
3.00
|
Leading edge
|
Details
|
  |
|
06-02-2015
|
2.00
|
Riveting leading edge
|
Details
|
  |
|
06-01-2015
|
3.00
|
Leading Edge Riveting
|
Details
|
  |
|
05-31-2015
|
6.00
|
Landing light
|
Details
|
|
|
05-30-2015
|
6.50
|
Riveted Right leading edge
|
Details
|
|
|
05-29-2015
|
3.50
|
Leading Edge dimpling
|
Details
|
|
|
05-28-2015
|
2.50
|
Tank skin countersinks and vent line
|
Details
|
|
|
05-27-2015
|
3.00
|
Dimpling the Right fuel tank
|
Details
|
|
|
05-26-2015
|
2.50
|
Finish prepping the LE and FT
|
Details
|
  |
|
05-25-2015
|
6.00
|
Leading Edge
|
Details
|
|
|
05-25-2015
|
1.00
|
Fuel Tank deburring
|
Details
|
  |
|
05-24-2015
|
6.00
|
Fuel Tank
|
Details
|
|
|
05-23-2015
|
2.00
|
Z-brackets and fuel tank baffle
|
Details
|
|
|
05-23-2015
|
2.00
|
Fuel tank deburring
|
Details
|
|
|
05-23-2015
|
6.00
|
Fuel Tank
|
Details
|
|
|
05-22-2015
|
6.00
|
Z-brackets
|
Details
|
|
|
05-16-2015
|
3.00
|
Fuel pick up and brackets
|
Details
|
|
|
05-16-2015
|
0.50
|
Fuel drain
|
Details
|
|
|
05-15-2015
|
5.00
|
R Fuel Tank
|
Details
|
  |
|
05-14-2015
|
3.00
|
Leading edge
|
Details
|
|
|
05-13-2015
|
1.00
|
Re-hung the Right wing
|
Details
|
  |
|
05-10-2015
|
3.00
|
Main spar countersinking
|
Details
|
|
|
05-10-2015
|
2.00
|
Leading edge ribs adjustment
|
Details
|
|
|
05-09-2015
|
4.00
|
Drilled RW bottom skin
|
Details
|
  |
|
05-08-2015
|
2.00
|
Drilled RW Top skin
|
Details
|
|
|
05-07-2015
|
1.50
|
Tank joint plate
|
Details
|
  |
|
05-06-2015
|
1.50
|
Leading Edge fitting
|
Details
|
 |
|
05-05-2015
|
2.00
|
Hung the Right wing
|
Details
|
|
|
05-04-2015
|
1.50
|
Finished Right main rib riveting
|
Details
|
|
|
05-03-2015
|
1.50
|
Riveting Right main ribs
|
Details
|
|
|
05-02-2015
|
3.00
|
LE Ribs and Right Main spar retouching
|
Details
|
|
|
05-01-2015
|
6.00
|
R Wing Rib priming
|
Details
|
|
|
04-30-2015
|
0.50
|
Prepping for priming
|
Details
|
  |
|
04-29-2015
|
2.00
|
Drilled main ribs to spars
|
Details
|
  |
|
04-28-2015
|
1.00
|
Adjusted main ribs
|
Details
|
|
|
04-15-2015
|
1.00
|
Drilled holes for the right wing conduit
|
Details
|
  |
|
04-14-2015
|
2.50
|
Wing main ribs and leading edge
|
Details
|
 |
|
04-13-2015
|
2.00
|
Main rib deburring
|
Details
|
  |
|
04-12-2015
|
1.50
|
Main rib deburring
|
Details
|
  |
|
04-11-2015
|
1.50
|
Main rib deburring
|
Details
|
  |
|
04-10-2015
|
0.50
|
Leading edge rib deburring
|
Details
|
  |
|
04-09-2015
|
1.00
|
Right wing ribs deburring
|
Details
|
  |
|
04-08-2015
|
0.50
|
Right wing ribs deburring
|
Details
|
  |
|
04-06-2015
|
0.50
|
Right wing ribs deburring
|
Details
|
  |
|
04-05-2015
|
1.20
|
Right wing ribs deburring
|
Details
|
  |
|
04-04-2015
|
1.00
|
Right wing ribs deburring
|
Details
|
  |
|
04-03-2015
|
1.00
|
Right wing ribs deburring
|
Details
|
  |
|
12-17-2014
|
1.50
|
Primed the pitot mast and mounting hardware
|
|
  |
|
11-23-2014
|
2.00
|
Wing stand modification
|
Details
|
|
|
11-20-2014
|
1.00
|
Securing pitot tubes to bell crank
|
Details
|
 |
|
11-19-2014
|
2.00
|
Pitot pluming
|
Details
|
|
|
11-06-2014
|
3.00
|
Pitot tube forming clamps
|
Details
|
|
|
11-01-2014
|
3.00
|
Pitot plumbing
|
Details
|
|
|
10-22-2014
|
2.00
|
Finished flap locking mechanism
|
Details
|
|
|
10-21-2014
|
2.00
|
Started constructing locking mechanism for flap hi
|
Details
|
|
|
10-17-2014
|
2.00
|
Primed pitot mast hardware and mounted control box
|
Details
|
|
|
10-16-2014
|
1.50
|
Riveted control box nutplates to the wing rib
|
Details
|
|
|
10-14-2014
|
1.00
|
Made and mounted aileron stop out of delrin
|
Details
|
 |
|
10-12-2014
|
1.00
|
Pitot tubes and control box
|
Details
|
|
|
10-02-2014
|
2.50
|
Match drilled the flap to the wing
|
Details
|
|
|
09-29-2014
|
1.00
|
Left bell crank.
|
Details
|
|
|
09-20-2014
|
2.00
|
Riveted the left flap
|
Details
|
|
|
09-17-2014
|
2.00
|
Assembled the right aileron
|
Details
|
|
|
09-17-2014
|
1.00
|
Assembled the left flap
|
Details
|
|
|
09-14-2014
|
4.00
|
Primed the right aileron parts
|
Details
|
|
|
09-12-2014
|
1.50
|
Match drilled the right aileron
|
Details
|
|
|
09-09-2014
|
1.50
|
Spacer for the leading edge/tank interface
|
Details
|
|
|
09-08-2014
|
1.50
|
Fuel tank fitting
|
Details
|
  |
|
09-06-2014
|
2.00
|
Finished the right aileron
|
Details
|
|
|
09-04-2014
|
1.50
|
Final assembly of right aileron.
|
Details
|
 |
|
08-30-2014
|
2.50
|
Match drilling the left aileron skin and ribs
|
Details
|
|
|
08-24-2014
|
2.00
|
Starting match drilling the left aileron spar
|
Details
|
|
|
08-22-2014
|
2.50
|
Finishing reverting the flap
|
Details
|
|
|
08-21-2014
|
2.00
|
Flap riveting
|
Details
|
|
|
08-20-2014
|
1.00
|
Riveted aileron stiffeners
|
Details
|
 |
|
08-20-2014
|
0.50
|
Adjusted the flap skin
|
Details
|
|
|
08-19-2014
|
3.50
|
Aileron dimpling
|
Details
|
  |
|
08-18-2014
|
2.00
|
Aileron stiffeners
|
Details
|
  |
|
08-17-2014
|
2.50
|
Right flap drilling
|
Details
|
  |
|
08-16-2014
|
5.50
|
Primed the aileron components
|
Details
|
|
|
08-15-2014
|
1.50
|
Match drilled the right aileron stiffeners
|
Details
|
  |
|
08-14-2014
|
1.00
|
Removed vinyl on ailerons
|
Details
|
|
|
08-12-2014
|
2.00
|
Aileron and Flap cradle
|
Details
|
 |
|
08-10-2014
|
3.50
|
Started deburring the right aileron components.
|
Details
|
 |
|
08-09-2014
|
2.00
|
Drilled the stiffeners to the aileron skin.
|
Details
|
|
|
08-08-2014
|
1.50
|
Countersunk the left flap nutplate
|
Details
|
  |
|
08-07-2014
|
2.00
|
Deburred the left aileron stiffeners
|
Details
|
  |
|
08-06-2014
|
2.00
|
Cut the aileron stiffeners (left/right)
|
Details
|
|
|
08-05-2014
|
2.00
|
Drilled the flap hinge
|
Details
|
|
|
08-05-2014
|
1.50
|
Deburred and drilled the FL-706B
|
Details
|
|
|
08-04-2014
|
2.50
|
Clecoed the left flap
|
Details
|
 |
|
08-03-2014
|
0.50
|
Left fuel tank pressure holding
|
Details
|
  |
|
07-29-2014
|
0.50
|
Pressure still holding
|
Details
|
  |
|
07-25-2014
|
0.00
|
Pressure holding for the left fuel tank
|
Details
|
 |
|
07-24-2014
|
2.50
|
Started left fuel tank leak test
|
Details
|
  |
|
07-17-2014
|
2.00
|
Mounted and sealed the inspection cover
|
Details
|
|
|
07-15-2014
|
2.50
|
Finished up the aileron brackets.
|
Details
|
 |
|
07-14-2014
|
3.00
|
Riveted the aileron brackets
|
Details
|
  |
|
07-13-2014
|
6.50
|
Riveted the left baffle
|
Details
|
 |
|
07-12-2014
|
3.00
|
Redid the aileron brackets
|
Details
|
  |
|
06-22-2014
|
3.00
|
Installed flop tube
|
Details
|
|
|
06-17-2014
|
2.00
|
Test fit the flop tube
|
Details
|
|
|
06-08-2014
|
1.00
|
Flop tube safety wire
|
Details
|
|
|
06-07-2014
|
1.00
|
Proseal inspection
|
Details
|
 |
|
05-30-2014
|
2.00
|
Last rib on left fuel tank
|
Details
|
 |
|
05-11-2014
|
2.00
|
Drilled new holes for my spacers ala Nilberg
|
Details
|
 |
|
05-10-2014
|
8.00
|
Capacity plate spacers
|
Details
|
|
|
05-07-2014
|
0.50
|
Match drilled the braces to the left wing.
|
Details
|
  |
|
05-05-2014
|
1.50
|
Flap and aileron deburring
|
Details
|
  |
|
05-04-2014
|
3.00
|
Left riveted the outboard top skin
|
Details
|
 |
|
05-03-2014
|
2.50
|
Left riveted the inboard top skin
|
Details
|
 |
|
05-02-2014
|
3.50
|
Finished riveting the leading edge,
|
Details
|
 |
|
05-01-2014
|
1.50
|
Left aileron brackets
|
Details
|
  |
|
04-30-2014
|
1.50
|
Leading edge rivet repair
|
Details
|
 |
|
04-29-2014
|
2.50
|
Leading edge rivet repair
|
Details
|
  |
|
04-28-2014
|
2.00
|
Rivet inspection and fixing
|
Details
|
 |
|
04-27-2014
|
1.50
|
Jigs for riveting
|
Details
|
|
|
04-26-2014
|
3.00
|
Left landing light
|
Details
|
|
|
04-25-2014
|
2.00
|
Made jigs for the leading edge to spar riveting.
|
Details
|
|
|
04-23-2014
|
2.00
|
Capacitive sender plates and wiring
|
Details
|
|
|
04-22-2014
|
1.00
|
More left fuel tank prep.
|
Details
|
  |
|
04-21-2014
|
1.50
|
Proseal Inspection
|
Details
|
  |
|
04-20-2014
|
2.00
|
Vent line and anti-hang up
|
Details
|
|
|
04-20-2014
|
2.00
|
Riveted nut plates for the inspection plate
|
Details
|
|
|
04-20-2014
|
6.00
|
Primed left top skin and doubler
|
Details
|
|
|
04-20-2014
|
0.00
|
Flop tube
|
Details
|
 |
|
04-19-2014
|
3.50
|
Left fuel tank (proseal)
|
Details
|
  |
|
04-18-2014
|
5.50
|
Left fuel tank (proseal) clecoing
|
Details
|
|
|
04-17-2014
|
3.50
|
Left fuel tank (proseal) clecoing
|
Details
|
|
|
04-08-2014
|
1.50
|
Anti-hang up device
|
Details
|
 |
|
04-07-2014
|
3.00
|
Fuel cap clean up, anti hang-up device
|
Details
|
|
|
04-06-2014
|
3.00
|
Left fuel tank (proseal) riveting
|
Details
|
|
|
04-05-2014
|
2.50
|
Pivot mast opening
|
Details
|
|
|
04-01-2014
|
2.50
|
Left rear spar to ribs riveting
|
Details
|
  |
|
03-31-2014
|
2.50
|
Anti rotation bracket
|
Details
|
  |
|
03-30-2014
|
5.50
|
Fuel tank flap doors, stall warning install
|
Details
|
 |
|
03-29-2014
|
3.00
|
Started riveting the left leading edge.
|
Details
|
 |
|
03-28-2014
|
1.50
|
Leading edge access door
|
Details
|
|
|
03-27-2014
|
1.50
|
Left leading edge dimpling
|
Details
|
  |
|
03-22-2014
|
3.00
|
Vent line clips
|
Details
|
|
|
03-21-2014
|
4.50
|
Leading edge skin priming
|
Details
|
  |
|
03-20-2014
|
1.50
|
Anti hang up device
|
Details
|
  |
|
03-19-2014
|
1.00
|
Flop tube fitting
|
Details
|
|
|
03-18-2014
|
1.00
|
Drilled the left tank tip stiffener/bracket
|
Details
|
|
|
03-16-2014
|
3.00
|
Left fuel tank dimpling
|
Details
|
  |
|
03-15-2014
|
2.00
|
Left fuel tank skin dimpling
|
Details
|
  |
|
03-14-2014
|
1.50
|
Left fuel tank inspection hole
|
Details
|
|
|
03-13-2014
|
2.00
|
Left fuel tank stiffener and brackets
|
Details
|
|
|
03-12-2014
|
2.00
|
Fuel cap countersinking
|
Details
|
|
|
03-11-2014
|
1.50
|
Fuel cap
|
Details
|
|
|
03-10-2014
|
2.00
|
Fuel tank drain
|
Details
|
|
|
03-09-2014
|
6.00
|
Fuel tank fitting and baffle fitting
|
Details
|
|
|
03-08-2014
|
3.00
|
Z-brackets, fuel tank deburring, stall warning
|
Details
|
|
|
03-07-2014
|
3.00
|
Z-bracket priming
|
Details
|
  |
|
03-05-2014
|
1.50
|
Leading edge joint plate
|
Details
|
  |
|
03-04-2014
|
2.50
|
Z-brackets countersinks
|
Details
|
 |
|
03-03-2014
|
2.00
|
Z-bracket drilling
|
Details
|
  |
|
03-02-2014
|
4.00
|
Z-brackets for left wing
|
Details
|
|
|
03-01-2014
|
4.00
|
Left leading edge drilling
|
Details
|
  |
|
02-28-2014
|
2.00
|
Rear spar clean up
|
Details
|
  |
|
02-26-2014
|
2.00
|
Match drilled the left bottom skin.
|
Details
|
 |
|
02-25-2014
|
1.50
|
Match drilled the left top skin.
|
Details
|
  |
|
02-24-2014
|
1.50
|
Stall warning assembly
|
Details
|
  |
|
02-19-2014
|
2.00
|
Wing walk doubler and skin joints
|
Details
|
  |
|
02-17-2014
|
2.00
|
Leading edge drilling
|
Details
|
 |
|
02-16-2014
|
2.00
|
Riveting Wing Ribs to Spar
|
Details
|
|
|
02-15-2014
|
3.00
|
Left wing ribs to spar riveting
|
Details
|
  |
|
02-14-2014
|
2.00
|
Left tank rib deburring
|
Details
|
  |
|
02-13-2014
|
1.00
|
Left leading edge deburring
|
Details
|
  |
|
02-12-2014
|
2.00
|
Left leading edge
|
Details
|
  |
|
02-11-2014
|
2.00
|
Built Leading Edge Cradle.
|
Details
|
|
|
02-10-2014
|
2.00
|
Built Leading Edge Cradle.
|
Details
|
 |
|
02-09-2014
|
4.00
|
Left wing rib priming
|
Details
|
  |
|
02-08-2014
|
5.00
|
Left wing rib prepping
|
Details
|
  |
|
02-07-2014
|
2.00
|
Wing drilling
|
Details
|
|
|
02-06-2014
|
1.00
|
Conduit
|
Details
|
  |
|
02-05-2014
|
3.00
|
Wing Stand
|
Details
|
  |
|
02-02-2014
|
4.00
|
Deburring wing ribs
|
Details
|
|
|
02-01-2014
|
3.00
|
Deburring wing ribs
|
Details
|
  |
|
01-31-2014
|
1.50
|
Deburring wing ribs
|
Details
|
  |
|
01-30-2014
|
1.50
|
Deburring wing ribs
|
Details
|
  |
|
01-29-2014
|
1.50
|
Deburring wing ribs
|
Details
|
  |
|
01-28-2014
|
2.00
|
Started left wing ribs deburring
|
Details
|
 |
|
01-27-2014
|
3.00
|
Rear spar riveting
|
Details
|
|
|
01-26-2014
|
2.00
|
Tie-down priming
|
Details
|
  |
|
01-25-2014
|
5.00
|
Rear spar priming
|
Details
|
|
|
01-24-2014
|
3.00
|
Started rear spars
|
Details
|
|
|
01-22-2014
|
1.00
|
Wing stand hardware
|
Details
|
  |
|
01-20-2014
|
2.00
|
Wing stand hardware
|
Details
|
|
|
01-19-2014
|
2.00
|
Wing stand hardware
|
Details
|
|
|
01-19-2014
|
3.00
|
Drilled tie-down brackets to spar and countersunk
|
Details
|
|
|
01-18-2014
|
4.00
|
Built the wing hanging stand framework
|
Details
|
  |
|
01-16-2014
|
1.00
|
Manufactured the tie-down spacers
|
Details
|
|
|
01-13-2014
|
2.00
|
Nutplates on right spar
|
Details
|
 |
|
01-12-2014
|
4.00
|
Installed nutplates
|
Details
|
|
|
01-10-2014
|
2.00
|
Constructed Rib straitening device
|
Details
|
|
|
12-26-2013
|
2.00
|
Inventory of wing kit finished
|
Details
|
  |
|
12-24-2013
|
2.00
|
Inventory of wing kit
|
Details
|
  |
|
12-22-2013
|
2.00
|
Inventory of wing kit
|
Details
|
  |
|
12-20-2013
|
1.00
|
Wing Kit Arrived
|
Details
|
 |
|
10-21-2013
|
0.00
|
Received shipping date for wing kit
|
Details
|
 |
|
10-08-2013
|
0.00
|
Ordered the wing kit
|
Details
|
  |