KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
Work Logs Found: 20
Category Work Time: 41 Hours
 Date
Hours
Work Log Summary

Details

 12-02-2014
1.00
engine start two
Details

 11-29-2014
2.00
First engine start and run
Details
       

 11-28-2014
1.50
Prep for first engine start
Details
       

 08-26-2014
1.50
Misc engine stuff
Details
       

 08-25-2014
3.00
Carb heat door install
Details
       

 08-24-2014
1.00
Adjust left exhaust brackets until the fuel line t
Details
     

 08-22-2014
2.00
engine case oil breather vent line install
Details
       

 08-21-2014
3.50
Exhaust support hangers fit and install
Details
       

 08-12-2014
2.00
Exhaust hanging-1 and misc
Details
       

 04-27-2014
2.00
Rear throttle linkage and adjustments
Details
       

 04-26-2014
5.00
Engine control cables attached to throttle quadran
Details
       

 04-03-2014
1.50
Begin dry fit of exhaust
Details
     

 03-16-2014
1.50
carburator to engine mounting
Details
       

 03-15-2014
1.50
Drain the engine preservative fluid
Details
     

 11-19-2013
2.00
Fuel hoses and fittings
Details
       

 11-15-2013
1.00
Prep engine with fittings before installing engine
Details
       

 11-15-2013
5.00
Install engine
Details
       

 11-14-2013
1.50
Puncture hole in rear crankshaft plug
Details
       

 11-11-2013
1.50
Engine removed from box
Details
       

 10-03-2013
1.00
Engine arrival and unpacking
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.