Powered By Kitlog Pro v2.0
Bill & Brendas RV-8 QB
RV-8
wiring-cabin
Work Logs Found:
24
Category Work Time:
42 Hours
Date
Hours
Work Log Summary
Details
08-09-2013
1.00
Fuel sender wire and OAT probe wires run
Details
06-04-2013
1.25
front stick grip repair attempt 1
Details
06-04-2013
1.00
eyball light final install and pilot stick grip re
Details
06-03-2013
1.50
Left side pilot eyball light wiring and misc
Details
06-02-2013
5.00
Final stick grip, relays, trim wiring
Details
06-02-2013
0.00
2nd pic set of 6/2/13
06-01-2013
3.50
More wiring on the sticks and relay
Details
05-31-2013
1.00
Flap switch wiring-final
Details
05-31-2013
2.00
Aileron/elevator trim servo wiring
Details
05-26-2013
3.00
Trim servo, relays, stick wire testing and plannin
Details
05-25-2013
3.00
replace strobe/position wires with shielded wire c
Details
05-21-2013
0.00
pic set b 5/21/13
05-21-2013
2.00
Flap switch wiring 1 and removing some wire from v
Details
05-19-2013
0.00
pic set two of work5/19
05-19-2013
3.00
Conectorize rear 12v dc aux plug and run wire. Sta
Details
05-17-2013
3.00
wire up the map lights
Details
05-13-2013
2.25
solder headphone and mic jacks front and back
Details
05-13-2013
0.00
Pic set 2 for headset jacks and misc
05-06-2013
1.00
prep wires for soldering to headphone and mic jack
Details
05-05-2013
1.50
Install the stereo input jack, run the wire
Details
04-19-2013
1.50
Attach wires to the switch breakers in console
Details
04-06-2013
2.25
Fab CB buss bar and wire routing prep plus misc
Details
04-05-2013
2.00
Switch install in to console
Details
03-12-2013
1.75
position and drill rear audio/microphone jacks
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1040
2332
baffles
37
97
brake system
16
23
Canopy
64
162
Canopy skirt
47
75
Canopy/windscreen
64
162
cowling
58
130
electical-FWF
4
3
Electrical-cockpit
12
16
Elevators
20
63
Empennage
11
28
Engine
20
41
Exterior lights and
6
8
FAB
16
36
Fiberglass fairings
9
8
Fiberglass tips
46
68
Firewall Forward
46
90
Fuselage
136
329
Horizontal Stabilize
15
68
interior cushions an
3
8
Inventory
8
19
jigs, cradles, stand
6
15
Kit arrival
7
6
labels and plackards
2
3
Landing gear
17
40
Lights
12
28
Miscellaneous
56
96
None
1
1
Panel
40
78
paperwork
2
4
phase one tests
4
Practice kit
6
23
practice kit or tria
1
2
Prop
12
29
Propeller/Spinner
12
29
Rudder
16
43
Seats and floors
7
31
Tools
1
1
Vertical Stabilizer
8
18
weight and balance
3
8
Wing Fit/install
27
76
Wing Fitting
27
76
wing tip lights and
5
16
Wing Tips
7
20
Wings
43
123
Wire work
22
27
Wiring behind panel
34
63
wiring-cabin
24
42
Copyright © 2001-2024 Matronics. All Rights Reserved.