Powered By Kitlog Pro v2.0
John (Jack) Clark's Web Site
RV-A8
Cowl Flap
Work Logs Found:
13
Category Work Time:
20 Hours
Date
Hours
Work Log Summary
Details
07-14-2014
2.00
Installed a Cowl Flap Position Sensor
Details
07-07-2014
1.00
Covered Cowl Flap Exterior with Microballoons
Details
05-30-2014
0.00
Cowl Flap Operates Well After Reinforcement
Details
03-08-2014
2.00
Fit the Cowl Flap/Adjusted Flap Linkages
Details
03-07-2014
1.00
Installed the Cowl Flap Mechanism on Firewall
Details
10-15-2013
4.00
Installed the Cowl Flap Linear Actuator
Details
10-06-2013
0.50
Tapped One End Of Second cowl Flap Linkage
Details
10-05-2013
2.00
Adjusted the length of the Cowl Flap Linkage
Details
10-04-2013
2.00
Made Cowl Flap Linkage
Details
10-03-2013
0.00
Got Cowl Flap Tube and Arms Back From Welder
Details
10-01-2013
0.50
Took Cowl Flap Tube and Arms to the Welder
Details
09-25-2013
2.00
Installed the Right Cowl Flap Bearing and Doubler
Details
09-24-2013
2.50
Installed Left Cowl Flap Bearing and Doubler
Details
SITE NAVIGATION
Contact Builder
RV-14A Home
RV-A8 Home
Category
# Logs
# Hours
All
2277
6152
Aircraft Related
314
1432
Avionics
206
404
Brakes
11
18
Canopy
41
63
Cooling System
7
9
Cowl Flap
13
20
Cowling
146
354
Electrical System
157
311
Empennage
29
48
Engine
88
158
Fiberglass
148
316
Finishing Kit
27
76
First Flight Prep
4
1
Flight Control Syste
75
118
Flight Testing
18
20
Flights
6
7
Forward Baggage Comp
6
9
Forward Top Skin
24
36
Fuel System
84
155
Fuselage
344
812
Heating System
1
0
Inspection
5
5
Interior
24
20
Landing Gear
53
100
Lighting
17
27
Miscellaneous
8
5
None
14
6
Oxygen System
5
6
Painiting
11
28
Painting
11
28
Prop
22
27
Sensors
5
7
Testing
1
1
Ventilation
3
4
Windscreen
8
13
Wing Construction
27
76
Wings
314
1432
Copyright © 2001-2024 Matronics. All Rights Reserved.