Work Logs Found: 79
Category Work Time: 128 Hours
 Date
Hours
Work Log Summary

Details

 07-10-2016
0.50
Filling small voids
Details
       

 05-22-2016
1.00
Fill a few gaps at top longerons
Details
       

 05-01-2016
2.00
Sand top surface of upper longerons
Details
       

 04-30-2016
1.50
Finished trimming aft end of fuselage sides
Details
       

 04-24-2016
2.00
Trimming fuselage edges
Details
       

 04-03-2016
2.50
Prepare to square off fuselage sides
Details
       

 03-25-2016
1.00
Prepare outer surface and forms (left side)
Details
       

 03-12-2016
1.00
Prepare outer surface and forms (right side)
Details
       

 03-05-2016
1.00
Popped sides out of forms
Details
       

 02-15-2016
1.50
Trim and Sand aft area fiberglass
Details
       

 02-06-2016
4.00
Apply 6 layers of BID
Details
       

 01-10-2016
1.50
Fill cracks with dry micro
Details
       

 01-09-2016
1.00
Fuselage aft electrical channels enclosed.
Details
       

 01-08-2016
0.50
Sanded Electrical Channel Covers
Details
       

 01-03-2016
1.50
Electric Channel Covers
Details
       

 01-01-2016
1.50
Shaped the electrical channel transitions
Details
       

 12-31-2015
2.00
Shaped foam for aft fuselage
Details
       

 12-28-2015
2.00
Apply BID cloth to support the stringers
Details
       

 12-27-2015
1.00
Prepare for LWX LWY corner layup
Details
       

 12-26-2015
2.00
Flox'd stringers LWX & LWY in place
Details
       

 12-24-2015
1.00
1 ply BID cloth to the electrical channels
Details
       

 12-19-2015
1.00
Sanding and LWX LWY positioning
Details
       

 11-22-2015
1.00
Cut away layers covering electrical channels
Details
       

 11-01-2015
1.50
Fabricate wooden stringers
Details
       

 10-31-2015
1.00
Install 20.5" doublers
Details
       

 10-26-2015
1.50
Prepared fuselage side aft bottom doublers
Details
       

 10-17-2015
2.00
Sanding bottom of fuselage sides
Details
       

 10-12-2015
2.00
Lower longeron left fuselage side
Details
       

 10-10-2015
1.00
Flox lower longeron to right side of fuselage
Details
       

 10-04-2015
1.50
Fabricated wood blocks for clamping longerons
Details
       

 10-02-2015
2.00
Temporarily positioned lower longerons
Details
       

 09-18-2015
2.00
Preparation of lower triangular longerons
Details
       

 08-22-2015
1.00
Inject Epoxy into air gaps
Details
       

 08-03-2015
1.00
Sanding top longerons and inspected for air bubble
Details

 07-31-2015
1.00
Trimming the top longerons
Details
       

 06-13-2015
5.00
Glassed Top Longerons
Details
       

 05-08-2015
1.50
Sanding Fuselage Sides
Details
       

 04-30-2015
1.50
Fuselage Side Repairs
Details
       

 04-18-2015
8.00
Inside Layup & Install Upper Longerons
Details
       

 04-05-2015
1.00
Fuselage Side glassing preparation
Details
       

 04-04-2015
0.50
Completing step 3
Details
     

 03-15-2015
1.00
Trial Fit Upper Longerons
Details
       

 03-07-2015
1.00
Left fuel sight gauge depression
Details
       

 03-01-2015
0.50
Right fuel sight gauge location prepared
Details
       

 02-28-2015
1.00
Create control stick depressions
Details
       

 02-27-2015
0.10
Locate fuel sight guage locations
Details
       

 02-21-2015
0.50
Locate 8" diam depression for control sticks
Details
       

 02-15-2015
1.50
Fuselage Side Contouring Complete
Details
       

 02-01-2015
1.50
Installed bottom right side spacers
Details
       

 01-25-2015
1.00
Shaped remaining EE spacers
Details
       

 01-24-2015
1.50
Shaped Left side spacer EE piece #1
Details
       

 01-13-2015
2.50
Install aft spacers
Details
       

 01-12-2015
2.00
Shape the aft end spacers
Details
       

 01-10-2015
3.50
Shape & install spacers CC
Details
       

 01-09-2015
3.00
Shape & install spacers BB
Details
       

 01-08-2015
3.00
Shape & install spacers AA
Details
       

 01-07-2015
2.00
Determining Spacer Dimensions
Details
       

 01-03-2015
1.00
Fix PVC foam to forms
Details
       

 11-29-2014
2.50
Assembling the forms
Details
       

 11-23-2014
1.00
Measure & mark reference locations for jigs
Details
       

 11-22-2014
1.50
Sand & 30 degree lines
Details
       

 11-16-2014
2.00
Add length and trim fuselage sides
Details
       

 11-15-2014
2.00
Cutting Foam
Details
       

 11-09-2014
1.50
Epoxy foam pieces together
Details
       

 11-01-2014
1.00
Complete the masonite fuselage side forms
Details
       

 10-28-2014
0.50
Epoxy masonite pieces to length
Details
       

 10-25-2014
2.50
Cut remainder of masonite forms
Details
       

 10-24-2014
2.00
Prepare masonite to cut
Details
       

 10-05-2014
1.00
Completed Top Longerons
Details
       

 09-29-2014
1.00
Taper the doublers
Details
       

 09-16-2014
0.50
Measure 5.5" doublers
Details
       

 09-07-2014
1.00
Flox 60" stiffners to the top longerons
Details
       

 05-19-2014
1.00
Cut stiffners to match longeron curvatures
Details
       

 05-18-2014
1.00
Taper wood stiffner ends
Details
       

 05-11-2014
1.50
Laminated Top Longerons
Details
       

 05-08-2014
1.00
Fuselage side top longerons ready for laminating
Details
       

 01-01-2014
1.50
Jigs for top longerons secured to worktable
Details
     

 12-28-2013
4.00
Finished Fuselage Side Jigs
Details
     

 09-14-2013
2.00
Traced & Cut Jigs
Details
     