Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
Chap 5: Fuselage Sid
Work Logs Found:
79
Category Work Time:
128 Hours
Date
Hours
Work Log Summary
Details
07-10-2016
0.50
Filling small voids
Details
05-22-2016
1.00
Fill a few gaps at top longerons
Details
05-01-2016
2.00
Sand top surface of upper longerons
Details
04-30-2016
1.50
Finished trimming aft end of fuselage sides
Details
04-24-2016
2.00
Trimming fuselage edges
Details
04-03-2016
2.50
Prepare to square off fuselage sides
Details
03-25-2016
1.00
Prepare outer surface and forms (left side)
Details
03-12-2016
1.00
Prepare outer surface and forms (right side)
Details
03-05-2016
1.00
Popped sides out of forms
Details
02-15-2016
1.50
Trim and Sand aft area fiberglass
Details
02-06-2016
4.00
Apply 6 layers of BID
Details
01-10-2016
1.50
Fill cracks with dry micro
Details
01-09-2016
1.00
Fuselage aft electrical channels enclosed.
Details
01-08-2016
0.50
Sanded Electrical Channel Covers
Details
01-03-2016
1.50
Electric Channel Covers
Details
01-01-2016
1.50
Shaped the electrical channel transitions
Details
12-31-2015
2.00
Shaped foam for aft fuselage
Details
12-28-2015
2.00
Apply BID cloth to support the stringers
Details
12-27-2015
1.00
Prepare for LWX LWY corner layup
Details
12-26-2015
2.00
Flox'd stringers LWX & LWY in place
Details
12-24-2015
1.00
1 ply BID cloth to the electrical channels
Details
12-19-2015
1.00
Sanding and LWX LWY positioning
Details
11-22-2015
1.00
Cut away layers covering electrical channels
Details
11-01-2015
1.50
Fabricate wooden stringers
Details
10-31-2015
1.00
Install 20.5" doublers
Details
10-26-2015
1.50
Prepared fuselage side aft bottom doublers
Details
10-17-2015
2.00
Sanding bottom of fuselage sides
Details
10-12-2015
2.00
Lower longeron left fuselage side
Details
10-10-2015
1.00
Flox lower longeron to right side of fuselage
Details
10-04-2015
1.50
Fabricated wood blocks for clamping longerons
Details
10-02-2015
2.00
Temporarily positioned lower longerons
Details
09-18-2015
2.00
Preparation of lower triangular longerons
Details
08-22-2015
1.00
Inject Epoxy into air gaps
Details
08-03-2015
1.00
Sanding top longerons and inspected for air bubble
Details
07-31-2015
1.00
Trimming the top longerons
Details
06-13-2015
5.00
Glassed Top Longerons
Details
05-08-2015
1.50
Sanding Fuselage Sides
Details
04-30-2015
1.50
Fuselage Side Repairs
Details
04-18-2015
8.00
Inside Layup & Install Upper Longerons
Details
04-05-2015
1.00
Fuselage Side glassing preparation
Details
04-04-2015
0.50
Completing step 3
Details
03-15-2015
1.00
Trial Fit Upper Longerons
Details
03-07-2015
1.00
Left fuel sight gauge depression
Details
03-01-2015
0.50
Right fuel sight gauge location prepared
Details
02-28-2015
1.00
Create control stick depressions
Details
02-27-2015
0.10
Locate fuel sight guage locations
Details
02-21-2015
0.50
Locate 8" diam depression for control sticks
Details
02-15-2015
1.50
Fuselage Side Contouring Complete
Details
02-01-2015
1.50
Installed bottom right side spacers
Details
01-25-2015
1.00
Shaped remaining EE spacers
Details
01-24-2015
1.50
Shaped Left side spacer EE piece #1
Details
01-13-2015
2.50
Install aft spacers
Details
01-12-2015
2.00
Shape the aft end spacers
Details
01-10-2015
3.50
Shape & install spacers CC
Details
01-09-2015
3.00
Shape & install spacers BB
Details
01-08-2015
3.00
Shape & install spacers AA
Details
01-07-2015
2.00
Determining Spacer Dimensions
Details
01-03-2015
1.00
Fix PVC foam to forms
Details
11-29-2014
2.50
Assembling the forms
Details
11-23-2014
1.00
Measure & mark reference locations for jigs
Details
11-22-2014
1.50
Sand & 30 degree lines
Details
11-16-2014
2.00
Add length and trim fuselage sides
Details
11-15-2014
2.00
Cutting Foam
Details
11-09-2014
1.50
Epoxy foam pieces together
Details
11-01-2014
1.00
Complete the masonite fuselage side forms
Details
10-28-2014
0.50
Epoxy masonite pieces to length
Details
10-25-2014
2.50
Cut remainder of masonite forms
Details
10-24-2014
2.00
Prepare masonite to cut
Details
10-05-2014
1.00
Completed Top Longerons
Details
09-29-2014
1.00
Taper the doublers
Details
09-16-2014
0.50
Measure 5.5" doublers
Details
09-07-2014
1.00
Flox 60" stiffners to the top longerons
Details
05-19-2014
1.00
Cut stiffners to match longeron curvatures
Details
05-18-2014
1.00
Taper wood stiffner ends
Details
05-11-2014
1.50
Laminated Top Longerons
Details
05-08-2014
1.00
Fuselage side top longerons ready for laminating
Details
01-01-2014
1.50
Jigs for top longerons secured to worktable
Details
12-28-2013
4.00
Finished Fuselage Side Jigs
Details
09-14-2013
2.00
Traced & Cut Jigs
Details
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.