KitLog pro

Powered By Kitlog Pro v2.0

MIKE'S WEB SITE
Work Logs Found: 117
Category Work Time: 408 Hours
 Date
Hours
Work Log Summary

Details

 09-17-2016
16.00
Finished aileron hinge
Details

 08-13-2016
10.00
Final assembly
Details

 08-12-2016
8.00
F‌inal Assembly
Details

 08-11-2016
1.00
Cabin inspection my Matt
Details

 06-25-2016
3.00
Trailered fuse to hangar
     

 11-05-2015
6.00
Glare shield and windscreen.
Details
       

 11-01-2015
2.00
Installed rudder and trim
Details
       

 10-31-2015
6.00
Baggage area aft
Details
     

 10-29-2015
6.00
Top Skin
Details
     

 10-27-2015
6.00
Bleed brakes with garden sprayer
Details
       

 10-24-2015
3.00
Pushrod. Fuel sender wiring. New zip ties.
Details
     

 01-16-2015
1.00
Finished rivets near the tail area
     

 12-31-2014
1.00
Replaced hinge pin on trim tab with SS
Details
       

 12-20-2014
8.00
Misc. electrical tasks
Details
       

 08-12-2014
3.00
Riveted aft skin

 08-07-2014
2.00
Mounted tail
Details
       

 08-07-2014
7.00
Electrical prep and brake lines
Details
       

 08-06-2014
3.00

Details
       

 07-21-2014
2.50
Roll bar
Details
       

 07-17-2014
2.50
Riveted antenna doublers and pitch servo mount.
Details
     

 07-15-2014
6.50
Antenna Doublers. Firewall recess
Details
       

 07-12-2014
1.00
Temp. mounted pitch servo
     

 07-12-2014
2.50
Installed rudder cable fairings.
Details
       

 07-11-2014
3.50
ELT wire run. Fixed ELT mount. Started building ad
Details
       

 07-11-2014
1.50
Cleaned up fuse. Drilled, prepped and primed pitch
     

 07-10-2014
1.00
Firewall misc.
Details
     

 07-10-2014
5.00
AOA and pitot run. Mounted OAT. Firewall misc.
Details
       

 07-09-2014
5.00
AOA and pitot routed to back. Tanks to wings.
Details
     

 07-08-2014
7.00
Finished boost pump fuel runs
Details
       

 07-07-2014
2.00
Boost pump
Details
     

 07-06-2014
5.00
Fixed contactor mounts. Finished cabin covers.
Details
       

 04-20-2014
1.50
Removed interior. Prepped cabin covers.

 04-12-2014
4.00
Battery Box complete.
Details
     

 04-10-2014
7.00
Firewall work
Details
       

 04-09-2014
8.00
Firewall work
Details
       

 04-08-2014
7.50
Cabin covers and fuel pump
Details
       

 03-21-2014
2.00
Mount ELT
Details
     

 03-11-2014
4.00
Fabricated ADAHRS Bracket
Details
       

 03-07-2014
5.00
Front Deck
Details
       

 03-06-2014
4.50
Front Deck
Details
     

 03-05-2014
8.00
Front Deck
Details
       

 03-03-2014
6.50
Front deck
Details
       

 01-31-2014
3.00
Front Deck
Details
       

 01-27-2014
2.00
Small parts for Front Deck
Details
     

 01-26-2014
5.00
Prepping interior parts for paint
Details

 12-31-2013
1.50
Removed wings.
Details
     

 12-30-2013
10.00
Fixed aileron pushrods and re-rigged. Installed ai
Details
       

 12-28-2013
3.00
Fuel line for left tank to selector valve
Details
     

 12-20-2013
0.50
Finished right fuel tank line
Details
       

 12-20-2013
6.00
Finished left wing root fairing. Made right fuel v
Details
       

 12-19-2013
3.00
Right wing root fairing installed
       

 12-17-2013
0.75
Started on aileron stop
Details
       

 12-17-2013
3.00
Ailreron stops
Details
       

 12-16-2013
4.00
Rigged ailerons and started on flaps
Details
       

 12-16-2013
2.00
Finished flap pushrod holes and rigged up test swi
Details
       

 12-15-2013
2.00
More wing fit
Details
       

 12-14-2013
2.00
Misc. wing fitament
Details
     

 12-14-2013
6.50
Installed wings with Pete and Mark
Details
       

 12-11-2013
3.00
Fuel vent line for left side
Details
     

 12-10-2013
0.75
Installed flap assemebly
Details
       

 12-09-2013
3.00
Painted some misc. interior parts
Details
     

 12-08-2013
5.00
Painted interior
Details
       

 11-29-2013
3.00
Cleaned holes on main spars
Details
       

 11-16-2013
4.50
More tail
Details
       

 11-15-2013
1.50
Finished static port tubing.
Details
       

 11-09-2013
3.00
Disassembled tail. Primed tail parts. Started Stat
Details
       

 11-08-2013
7.00
Mount Vertical stab.
Details
       

 11-08-2013
1.00
Fixed down elevator stops
Details
       

 10-04-2013
2.00
Set elevator down stops
Details
     

 10-03-2013
4.50
Mounted horizontal
Details
       

 09-30-2013
2.50
Static port install
Details
       

 09-30-2013
1.00
Started fabricating parts necessarry for tail inst
Details

 09-27-2013
2.00
Started static
Details
       

 09-21-2013
3.50
Elevator pushrods
Details
       

 09-19-2013
4.00
Finished missing single lug nut plates. F-7114 gus
Details

 09-12-2013
2.00
Seatbelt wear blocks
Details
       

 09-11-2013
1.00
Flaps entry continued for more pics
       

 09-11-2013
6.00
Flaps
Details
       

 09-10-2013
2.50
Started Flaps
Details
       

 09-07-2013
1.00
Finished center and cabin cover
Details
       

 09-06-2013
4.00
Finished center tunnel cover. Heat baffle and fowa
Details
       

 09-05-2013
1.00
Started working on center tunnel cover

 09-02-2013
7.00
Baggage compartment floor install. Prep aft floor.
Details
       

 09-02-2013
0.10
Alex has been waiting to get back in.
       

 08-30-2013
1.00
Prepping baggage compartment floor area
Details
     

 08-28-2013
5.00
Crotch strap brackets
Details
       

 08-27-2013
0.75
Setback hing pins
Details
       

 08-27-2013
6.00
Finished seat backs.
Details
       

 08-26-2013
4.00
Seat backs
Details
       

 08-26-2013
1.00
Built right seat back

 08-25-2013
0.75
Started seat backs.
Details
       

 08-25-2013
2.00
Center brace for rudder pedal assembly
Details
     

 08-24-2013
4.00
Rudder pedal assembly
Details
       

 08-23-2013
3.00
Rudder pedal assembly
Details
       

 08-21-2013
3.00
F-7112
Details
     

 08-20-2013
1.00
trimmed f-7112 rib stiffeners
Details
       

 08-20-2013
1.00
Match drilled f-7112
Details

 08-20-2013
1.50
F-7112 skin
Details
       

 08-19-2013
5.00
Misc. wiring, static holes. Elevator bellcrank. Fi
Details
       

 08-18-2013
1.50
Fuel tank attach bracket
Details
       

 08-17-2013
1.00
Rudder pedals
Details
     

 08-16-2013
1.00
Interior choices and tail number
Details
       

 08-13-2013
6.00
Fuel tank attach bracket. Started on rudder pedals
Details
       

 08-12-2013
2.50
Removed floors. Started on Fuel tank attach bracke
Details
       

 08-12-2013
2.00
Fuel tank attach bracket
Details
     

 08-11-2013
2.50
Wd-409 mounted to f-712
Details
       

 08-11-2013
1.00
Riveted F-711 and keeper rivets to WD-409
Details
     

 08-09-2013
7.00
WD-409 and misc. fuse work
Details
       

 08-07-2013
0.50
Finished F-705 rivets
Details
     

 08-07-2013
1.25
F-757 gusset plates
Details
     

 07-29-2013
2.50
F-705 Bulkhead work
Details
       

 07-24-2013
5.00
Riveted seat adjustment assembly and started
Details
       

 07-17-2013
2.00
Prep for control mounting
Details
     

 07-16-2013
5.50
Fuse begins
Details
     

 06-26-2013
0.50
More fuse inventory

 06-23-2013
1.50
Inventory
     

 06-18-2013
1.00
QB Wings and Fuse arrive
     










Copyright © 2001-2024 Matronics. All Rights Reserved.