Powered By Kitlog Pro v2.0
GEORGE'S WEB SITE
CH750
Tail
Work Logs Found:
41
Category Work Time:
89 Hours
Date
Hours
Work Log Summary
Details
12-08-2013
4.00
Mated horrizontal stabilizer with elevator
Details
12-02-2013
2.00
Mated horizontal stabilizer with Elevator
Details
11-30-2013
1.00
Piveted elevator
Details
11-29-2013
1.00
Riveting elevator
Details
11-27-2013
1.00
Riveting of Elevator
Details
11-25-2013
1.00
Final riveting
Details
11-24-2013
2.00
Finished drilling on Elevator
Details
11-23-2013
2.00
More Drilling on the Elevator, Part 2
Details
11-22-2013
2.00
Drilled pilot holes on Elevator Part 1
Details
11-18-2013
2.00
Remounted a front elevator skin and front skin spa
Details
11-17-2013
2.00
Mounted Trim Tab Servo Part 2
Details
11-15-2013
2.00
Linkage for Trim Tab Server Part 1
Details
11-10-2013
2.00
Initially drilled holes for Trim Tab Servo
Details
11-09-2013
2.00
Mounted Trim tab on Horizontal stabilizer
Details
11-08-2013
2.00
Initial drilling of Trim hinge
Details
11-06-2013
2.00
Fabrication of Elevator horn
Details
11-03-2013
2.00
Final riveting Horizontal Stabilizer
Details
10-28-2013
2.00
Drilled Mounting bracket horizontal stabilizer
Details
10-23-2013
2.00
Mounted elevator horn
Details
10-20-2013
2.00
Trim tab mounting on elevator
Details
10-18-2013
2.00
Drilled skin on elevator
Details
10-17-2013
2.00
Mount skin on Elevator
Details
10-15-2013
2.00
Assemble Elevator
Details
10-14-2013
2.00
Deburr and rivet
Details
10-13-2013
3.00
Debur and Cortec Horizonal Stabilizer
Details
10-11-2013
1.00
Debur Horizontal Stabilizer
Details
10-10-2013
1.00
Deburring Horizontal Stabilizer
Details
10-08-2013
1.00
Deburring
Details
10-03-2013
2.00
Deburring
Details
10-02-2013
2.00
Redrill Non-compliant Holes
Details
10-01-2013
2.00
Redrilling Horizontal Stabilizer
Details
09-30-2013
2.00
Drilling Inspection
Details
09-24-2013
1.00
Drilling
Details
09-22-2013
6.00
Horizontal Stabilizer Skin
Details
09-21-2013
6.50
Rear Mounting Bracket and tools
Details
09-19-2013
2.00
Cut rear mounting bracket
Details
09-17-2013
1.00
Drilled front spar
Details
09-15-2013
2.50
Started Construction
Details
09-08-2013
4.00
Set out parts and tools for Tail Kit
Details
09-07-2013
4.00
Inventory Tail Kit
Details
08-30-2013
2.00
Rear Mounting Bracket Redrill.
Details
SITE NAVIGATION
Contact Builder
CH750 Home
Category
# Logs
# Hours
All
75
215
Flaps and Slats
18
51
Shop Supplies
1
6
Tail
41
89
Tools
4
7
Wings
11
62
Copyright © 2001-2024 Matronics. All Rights Reserved.