Powered By Kitlog Pro v2.0
John B.s Web Site
RV-9A
Cowling
Work Logs Found:
29
Category Work Time:
70 Hours
Date
Hours
Work Log Summary
Details
08-19-2014
2.00
Install upper cowl
Details
08-17-2014
3.00
Install air intake baffle seals
Details
08-15-2014
2.50
Bottom cowl air intake baffle seal
Details
08-14-2014
2.00
Fuel drain opening, cowl intake baffle
Details
08-13-2014
1.75
Install reflective foil on right side of lower cow
Details
08-06-2014
1.00
Install heat protector on half the cowling
Details
09-21-2013
2.00
Work on Cowling
Details
09-20-2013
2.75
Work on Cowling
Details
09-18-2013
3.50
Install Prop, Work on fairing, cowling, engine
Details
09-17-2013
1.75
Windscreen fairing
Details
09-08-2013
1.50
Work on Cowling
Details
09-07-2013
1.50
Work on Cowling
Details
09-06-2013
3.00
Work on Cowling
Details
09-06-2013
0.10
Work on Cowling
Details
09-05-2013
2.75
Work on Cowling
Details
09-04-2013
5.50
Sand lower cowl
Details
08-31-2013
2.75
Work on lower and upper cowl
Details
08-30-2013
5.00
Sand lower cowling
Details
08-29-2013
2.50
Sand lower cowling
Details
08-26-2013
4.50
Sand second coat of epoxy on upper cowling
Details
08-24-2013
1.25
Second coat of epoxy on upper cowl
Details
08-24-2013
1.25
Second coat of epoxy on upper cowl
Details
08-24-2013
1.20
Rivet piano hinge on fuselage for upper cowling
Details
08-23-2013
2.00
Apply the second epoxy coat on upper cowling
Details
08-22-2013
2.75
Sand cowling
Details
08-21-2013
2.75
Fill pin holes on clowling
Details
08-05-2013
2.00
Prime spinner bulkheads
Details
08-04-2013
2.75
Prepare Spinner Bulkheads for Priming
Details
08-03-2013
2.50
Seal Inside of the cowling halfs
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
1347
2941
Avionics
207
496
Canopy
50
145
Cowling
29
70
Electrical
18
49
Empennage
35
60
Engine
119
248
FilteredAirBox
7
17
Firewall Forward
68
152
Fuselage
464
944
Hardware
3
4
Labels
6
10
Miscellaneous
46
103
Paperwork
2
0
Prop
1
2
Seat belt
3
8
Wings
289
633
Copyright © 2001-2024 Matronics. All Rights Reserved.