Powered By Kitlog Pro v2.0
Joe's OneX #129 Project
OneX
Fuselage
Work Logs Found:
89
Category Work Time:
304 Hours
Date
Hours
Work Log Summary
Details
08-29-2014
3.50
Finish fitting the rebuilt cross tie.
Details
08-27-2014
4.50
Modified cross tie
Details
08-26-2014
4.50
Riveted right #1 rib to fuselage side
Details
08-11-2014
1.50
Received a replacement F19-05 Cross Tie from Sonex
Details
08-07-2014
1.50
Installed top fuselage splice plate bolts & screws
Details
07-31-2014
2.00
Turned fuselageand to install rudder cable pulleys
Details
07-31-2014
1.50
Tried fitting the rear spar to the fuselage
Details
07-29-2014
1.00
Made additional brace for F12-13 edge clearance pr
Details
07-29-2014
4.00
Drilled main spar mounting brackets
Details
07-28-2014
2.00
Riveted turtle deck skin
Details
07-28-2014
2.50
Began fitting the wing spar attach brackets
Details
07-25-2014
3.00
Began riveting turtle deck skin
Details
07-24-2014
1.00
Made trim control angle mount
Details
07-23-2014
1.50
More work on panel & rudder pedals
Details
07-23-2014
3.50
Fit new instrument panel
Details
07-21-2014
5.00
Riveted rudder cable pulley's to bulkheads
Details
07-19-2014
2.00
Cut part of panel
Details
07-18-2014
3.00
Installed Temp Sensor wire clips
Details
07-17-2014
2.00
Verify Fuel tank fit and drilled Registration plat
Details
07-17-2014
2.50
Attached NACA vent to fuselage skin
Details
07-16-2014
4.00
Cut NACA vent on fuselage side
Details
07-15-2014
3.00
Updrilled holes connecting front and rear fuselage
Details
07-14-2014
3.50
Assembled Van's Cabin Heat Selector Box
Details
07-10-2014
4.00
More glare shield work
Details
07-09-2014
4.00
More work on glare shield
Details
07-07-2014
3.00
Work on glare shield
Details
07-05-2014
3.00
Drilled AN3 bolt holes for fuel tank straps
Details
07-04-2014
1.50
Drilled and attached glareshield attachstrap to to
Details
07-02-2014
2.00
More work on panel, FW & glare shield attachment
Details
07-01-2014
3.50
Panel and glare shield attachment
Details
06-23-2014
4.00
Drilled top FW & glare shield to attach strap
Details
06-20-2014
4.50
Battery box & instrument panel
Details
06-19-2014
3.00
Fitting fuselage halves & battery box work
Details
06-17-2014
2.00
Continue work on battery box
Details
06-16-2014
3.00
Fabricate new battery box
Details
06-10-2014
3.00
Started fitting the fuselage together.
Details
06-09-2014
3.50
Drilled and reamed engine mount to fuselage
Details
06-05-2014
4.00
Updrilled and reamed LG and fuselage holes to AN5
Details
06-04-2014
2.50
Engine turned FWs
Details
06-03-2014
4.00
Initial drilling of landing gear
Details
06-02-2014
4.50
Drill & ream motor mounts for AN3 hardware
Details
05-30-2014
4.00
Updrilled to #30 FWs to frame.
Details
05-29-2014
4.50
More drilling & deburring on forward fuselage
Details
05-28-2014
4.50
Continue fitting front fuselage components
Details
05-27-2014
4.50
Cleco fuselage & champher engine mount parts
Details
05-23-2014
4.00
Working on fuselage forward bottom section
Details
05-22-2014
4.50
Completed updrilling forward left & right fuselage
Details
05-21-2014
4.50
Updrilled left fuselage side.
Details
05-20-2014
4.50
Cut cowl hinges & rivet fuselage horizontal box to
Details
05-19-2014
4.00
Bent and riveted seat sling
Details
05-16-2014
4.00
Work on seat sling & flap detent bracket.
Details
05-13-2014
4.00
Clecoed front fuselage
Details
05-09-2014
3.00
Fitted fuselage front & rear splice plates.
Details
05-07-2014
4.50
Deburred turtledeck skin and formers
Details
05-06-2014
4.00
Finished match drilling turtledeck skin to frame.
Details
05-05-2014
5.00
Continue work on turtle deck.
Details
05-02-2014
4.00
Continue work on turtle deck
Details
05-01-2014
4.00
Fit turtle deck to fuselage
Details
04-11-2014
2.00
Riveted turtledeck skins together
Details
12-05-2013
4.00
Worked on static system
Details
12-03-2013
4.50
Installed tail spring fairing
Details
11-27-2013
1.00
Trimmed rear VS angle bracket
Details
11-26-2013
2.00
Worked trying to adjust the elevator up limit
Details
11-21-2013
1.00
Drilled tailwheel steering linkage
Details
11-20-2013
2.00
Drilled some of the tail wheel weldments
Details
11-19-2013
5.00
Drilled tail wheel spring hole.
Details
11-14-2013
4.50
More tail feather stuff
Details
11-13-2013
5.00
Tail feathers again
Details
11-12-2013
3.00
More work on the tail feathers
Details
11-11-2013
4.00
More work mounting tail feathers
Details
11-09-2013
4.00
Updrilled HS & VS together and to fuselage
Details
11-08-2013
4.50
Match drilled idler to longeron & bottom skin
Details
11-07-2013
5.00
Finished enlarging elevator pushrod holes
Details
11-05-2013
3.00
Fit HS to fuselage
Details
10-26-2013
6.00
Installed rudder cable fairings
Details
10-23-2013
4.00
Worked on rudder cable holes & idler assembly
Details
10-21-2013
5.50
More work on rudder cable routing
Details
10-20-2013
4.00
Work on rudder cable routing
Details
10-19-2013
2.00
Assembled rudder cable guides & misc. stuff
Details
10-17-2013
5.00
Make fuselage rudder cable guides & idler assembly
Details
10-16-2013
4.50
Continue fitting rear fuselage components.
Details
10-15-2013
4.00
Cleco'ed rear fuselage sides together & match dril
Details
10-12-2013
3.50
Finished riveting the side skins per F20 drawing
Details
10-11-2013
4.50
F20 - partially riveted rear side skins to lower a
Details
10-10-2013
3.00
Clico right rear fuselage side together
Details
10-09-2013
4.00
Worked on F21 fuselage side parts
Details
10-08-2013
3.50
Started on rear fuselage side sections F-21
Details
09-05-2013
1.00
Made the tail spring fairing
Details
09-03-2013
2.00
Made rudder cable fairings
Details
SITE NAVIGATION
Contact Builder
OneX Home
Category
# Logs
# Hours
All
192
645
Airframe
3
11
Avionics - Design
1
Electrical - Design
1
Empennage
22
86
Fuselage
89
304
Miscellaneous
9
25
Paint - Schemes
1
Panel - Layouts
2
RV9-A Project
1
Shop Supplies
2
1
Tools
3
2
Wings
58
216
Copyright © 2001-2024 Matronics. All Rights Reserved.