KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
Work Logs Found: 26
Category Work Time: 48 Hours
 Date
Hours
Work Log Summary

Details

 11-16-2023
3.00
Re-sealed Right Fuel Transducer
Details
     

 10-22-2020
2.00
Replace Both Fuel Drains
Details
       

 01-31-2019
3.00
Fuel Flow Test: Nose Low
Details
     

 01-15-2019
3.00
Fuel Flow Test: Nose High
Details
     

 01-10-2019
6.00
Right Fuel Tank Level Calibration
Details

 01-07-2019
4.00
Left Fuel Tank Level Calibration
Details

 01-27-2018
2.00
Fuel Connections Complete
Details
       

 10-22-2016
0.50
Fuel Plumbing Through the Cabin Complete
Details
     

 10-17-2016
1.00
Fuel Plumbing Through the Cabin 8
Details
     

 10-16-2016
2.50
Fuel Plumbing Through the Cabin 7
Details
       

 10-15-2016
1.50
Fuel Plumbing Through the Cabin 6
Details
       

 10-12-2016
0.50
Fuel Plumbing Through the Cabin 5
Details
       

 10-08-2016
2.50
Fuel Plumbing Through the Cabin 4
Details
       

 10-05-2016
1.50
Fuel Plumbing Through the Cabin 3
Details
       

 10-03-2016
1.00
Fuel Plumbing Through the Cabin 2
Details
       

 09-27-2016
1.00
Fuel Plumbing Through the Cabin 1
Details
       

 12-11-2015
1.00
Forward fuel Hose Routing - Complete
Details
     

 12-06-2015
1.00
Forward Fuel Hose Routing - Begin
Details
     

 06-15-2015
1.50
Electric Fuel Selector Valve Install
Details
       

 12-01-2013
1.50
Fuel Sender, Wing Flip
Details
       

 10-14-2013
1.00
Left Fuel Tank Install Start
Details
     

 10-12-2013
1.00
Left Fuel Tank Leak Test
Details
     

 09-05-2013
1.00
Fuel Cap Fitting
Details
       

 09-01-2013
2.00
Fuel Tank Cork and Filler Hole
Details
       

 08-30-2013
1.50
Fuel Sender Calibration
Details
       

 08-29-2013
1.00
Fuel Tank Fitting
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.