Powered By Kitlog Pro v2.0
AARON'S WEB SITE
RV8
Fuel Tanks
Work Logs Found:
56
Category Work Time:
97 Hours
Date
Hours
Work Log Summary
Details
08-19-2014
1.00
drilled skin to spar screws, dimpled
08-08-2014
1.00
proud rivet trimming
08-03-2014
0.75
Right tank leak testing
Details
08-02-2014
0.75
Fuel tank testing
Details
08-01-2014
0.50
Prep for pressure test
Details
07-18-2014
2.50
Final riveting of baffle flange
Details
07-17-2014
1.50
Prep for fuel tank baffle install
Details
07-17-2014
4.00
Back baflfe install
Details
06-23-2014
2.00
Filled tanks with water to look for leaks
Details
01-08-2014
1.00
EAA tech inspection before final seal
Details
11-23-2013
1.50
Fuel drain and access plate sealing
Details
11-22-2013
0.50
Misc tank work
Details
11-18-2013
1.50
Fuel tank end ribs Part 2
Details
11-17-2013
2.00
End ribs of the right tank part 1
Details
11-15-2013
1.00
Installed capacitive senders on right tank
Details
11-14-2013
0.50
Right tank flop tube install
Details
11-11-2013
3.50
Riveting right tank inner ribs
Details
11-10-2013
3.00
Rivet/seal left fuel tank end ribs
Details
11-09-2013
4.00
ReDimple of the right tank skin, prep and seal par
Details
11-08-2013
4.00
Left fuel tank end rib install part 1
Details
11-07-2013
0.50
Safety wire of flop tube
Details
10-23-2013
1.00
Assembly of fuel tank end ribs(fitting and electri
Details
10-22-2013
1.00
Tank end rib fitting install - prep
Details
10-15-2013
1.00
Finish riveting of the inner ribs for the left tan
Details
10-14-2013
3.00
Fuel tank inner rib seal/rivet
Details
10-13-2013
3.00
Redimple the left tank skin and start rib sealing
Details
09-20-2013
2.00
Riveting of the stiffeners
Details
09-19-2013
3.00
stiffeners part 1
Details
09-18-2013
2.00
proseal for end ribs
Details
09-14-2013
6.00
Misc fuel tank prep work
Details
09-12-2013
1.00
Flop tube anti rotation and anti hangup brackets
Details
09-07-2013
1.50
Left fuel tank rib dimpling and test assembly
Details
09-05-2013
1.50
T-410 for outboard rib and baffle line counter sin
Details
08-29-2013
2.00
The rest of the dimpling
Details
08-29-2013
0.75
Created Fuel Vent Lines
Details
08-28-2013
1.25
Dimpling of tank skins and stiffeners
Details
08-26-2013
0.50
Added AN fittings to inboard ribs for vent and ret
Details
08-23-2013
2.00
T-410,T-405, flop tube port
Details
08-19-2013
1.50
Fuel tank access ports
Details
08-16-2013
1.50
Fuel tank work, leading edge bracket
Details
08-14-2013
1.50
Fuel trap door
Details
08-14-2013
1.00
Capacitive Fuel senders
Details
07-31-2013
2.00
Fuel drain and ER tank fuel bung fitted and drille
Details
07-16-2013
1.50
Fitting the T-00007 Fuel Caps
Details
07-15-2013
0.50
First look at T-00007 Fuel Cap for RV8
Details
05-08-2013
2.00
Drilled remaining wing tank and stiffeners
Details
05-02-2013
3.00
Drilled left wing tank
Details
04-23-2013
1.00
Tank re-assembly and baffle drilling
Details
04-22-2013
2.00
Drilling the tank baffle to the Z brackets
Details
04-18-2013
1.00
Remake Z bracket
Details
04-09-2013
1.00
Cut and cleaned the fuel tank stiffeners
Details
03-29-2013
3.00
initial fit of the fuel tanks
Details
03-25-2013
1.00
Bolted Z brackets to the spar
Details
03-11-2013
1.00
Riveted nutplates to the spar and fit inner most Z
Details
03-06-2013
1.00
Rivetted fuel tank Z bracket nut plates
Details
02-25-2013
2.00
Fuel tank Z bracketts
Details
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
370
738
Avionics
13
32
Empennage
48
128
Fuel Tanks
56
97
Fuselage
139
266
Interior
1
2
Practice Kit
1
2
Shop Supplies
1
2
Side Projects
4
14
Wings
107
195
Copyright © 2001-2024 Matronics. All Rights Reserved.