KitLog pro

Powered By Kitlog Pro v2.0

AARON'S WEB SITE
Work Logs Found: 56
Category Work Time: 97 Hours
 Date
Hours
Work Log Summary

Details

 08-19-2014
1.00
drilled skin to spar screws, dimpled

 08-08-2014
1.00
proud rivet trimming

 08-03-2014
0.75
Right tank leak testing
Details

 08-02-2014
0.75
Fuel tank testing
Details
       

 08-01-2014
0.50
Prep for pressure test
Details

 07-18-2014
2.50
Final riveting of baffle flange
Details
       

 07-17-2014
1.50
Prep for fuel tank baffle install
Details
       

 07-17-2014
4.00
Back baflfe install
Details
       

 06-23-2014
2.00
Filled tanks with water to look for leaks
Details
       

 01-08-2014
1.00
EAA tech inspection before final seal
Details

 11-23-2013
1.50
Fuel drain and access plate sealing
Details
       

 11-22-2013
0.50
Misc tank work
Details

 11-18-2013
1.50
Fuel tank end ribs Part 2
Details
       

 11-17-2013
2.00
End ribs of the right tank part 1
Details

 11-15-2013
1.00
Installed capacitive senders on right tank
Details

 11-14-2013
0.50
Right tank flop tube install
Details

 11-11-2013
3.50
Riveting right tank inner ribs
Details
       

 11-10-2013
3.00
Rivet/seal left fuel tank end ribs
Details
       

 11-09-2013
4.00
ReDimple of the right tank skin, prep and seal par
Details
       

 11-08-2013
4.00
Left fuel tank end rib install part 1
Details
       

 11-07-2013
0.50
Safety wire of flop tube
Details
     

 10-23-2013
1.00
Assembly of fuel tank end ribs(fitting and electri
Details
       

 10-22-2013
1.00
Tank end rib fitting install - prep
Details
       

 10-15-2013
1.00
Finish riveting of the inner ribs for the left tan
Details
       

 10-14-2013
3.00
Fuel tank inner rib seal/rivet
Details
       

 10-13-2013
3.00
Redimple the left tank skin and start rib sealing
Details
       

 09-20-2013
2.00
Riveting of the stiffeners
Details

 09-19-2013
3.00
stiffeners part 1
Details
       

 09-18-2013
2.00
proseal for end ribs
Details
       

 09-14-2013
6.00
Misc fuel tank prep work
Details
       

 09-12-2013
1.00
Flop tube anti rotation and anti hangup brackets
Details
       

 09-07-2013
1.50
Left fuel tank rib dimpling and test assembly
Details

 09-05-2013
1.50
T-410 for outboard rib and baffle line counter sin
Details
       

 08-29-2013
2.00
The rest of the dimpling
Details

 08-29-2013
0.75
Created Fuel Vent Lines
Details
       

 08-28-2013
1.25
Dimpling of tank skins and stiffeners
Details

 08-26-2013
0.50
Added AN fittings to inboard ribs for vent and ret
Details
       

 08-23-2013
2.00
T-410,T-405, flop tube port
Details
       

 08-19-2013
1.50
Fuel tank access ports
Details
       

 08-16-2013
1.50
Fuel tank work, leading edge bracket
Details
       

 08-14-2013
1.50
Fuel trap door
Details
       

 08-14-2013
1.00
Capacitive Fuel senders
Details
       

 07-31-2013
2.00
Fuel drain and ER tank fuel bung fitted and drille
Details
       

 07-16-2013
1.50
Fitting the T-00007 Fuel Caps
Details
       

 07-15-2013
0.50
First look at T-00007 Fuel Cap for RV8
Details
       

 05-08-2013
2.00
Drilled remaining wing tank and stiffeners
Details
       

 05-02-2013
3.00
Drilled left wing tank
Details
     

 04-23-2013
1.00
Tank re-assembly and baffle drilling
Details
       

 04-22-2013
2.00
Drilling the tank baffle to the Z brackets
Details
       

 04-18-2013
1.00
Remake Z bracket
Details
       

 04-09-2013
1.00
Cut and cleaned the fuel tank stiffeners
Details
       

 03-29-2013
3.00
initial fit of the fuel tanks
Details
       

 03-25-2013
1.00
Bolted Z brackets to the spar
Details
       

 03-11-2013
1.00
Riveted nutplates to the spar and fit inner most Z
Details
       

 03-06-2013
1.00
Rivetted fuel tank Z bracket nut plates
Details
       

 02-25-2013
2.00
Fuel tank Z bracketts
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.