Date
|
Hours
|
Work Log Summary

|
Details

|
08-19-2014
|
1.00
|
drilled skin to spar screws, dimpled
|
|
  |
|
08-08-2014
|
1.00
|
proud rivet trimming
|
|
  |
|
08-03-2014
|
0.75
|
Right tank leak testing
|
Details
|
  |
|
08-02-2014
|
0.75
|
Fuel tank testing
|
Details
|
|
|
08-01-2014
|
0.50
|
Prep for pressure test
|
Details
|
  |
|
07-18-2014
|
2.50
|
Final riveting of baffle flange
|
Details
|
|
|
07-17-2014
|
1.50
|
Prep for fuel tank baffle install
|
Details
|
|
|
07-17-2014
|
4.00
|
Back baflfe install
|
Details
|
|
|
06-23-2014
|
2.00
|
Filled tanks with water to look for leaks
|
Details
|
|
|
01-08-2014
|
1.00
|
EAA tech inspection before final seal
|
Details
|
  |
|
11-23-2013
|
1.50
|
Fuel drain and access plate sealing
|
Details
|
|
|
11-22-2013
|
0.50
|
Misc tank work
|
Details
|
  |
|
11-18-2013
|
1.50
|
Fuel tank end ribs Part 2
|
Details
|
|
|
11-17-2013
|
2.00
|
End ribs of the right tank part 1
|
Details
|
  |
|
11-15-2013
|
1.00
|
Installed capacitive senders on right tank
|
Details
|
  |
|
11-14-2013
|
0.50
|
Right tank flop tube install
|
Details
|
  |
|
11-11-2013
|
3.50
|
Riveting right tank inner ribs
|
Details
|
|
|
11-10-2013
|
3.00
|
Rivet/seal left fuel tank end ribs
|
Details
|
|
|
11-09-2013
|
4.00
|
ReDimple of the right tank skin, prep and seal par
|
Details
|
|
|
11-08-2013
|
4.00
|
Left fuel tank end rib install part 1
|
Details
|
|
|
11-07-2013
|
0.50
|
Safety wire of flop tube
|
Details
|
 |
|
10-23-2013
|
1.00
|
Assembly of fuel tank end ribs(fitting and electri
|
Details
|
|
|
10-22-2013
|
1.00
|
Tank end rib fitting install - prep
|
Details
|
|
|
10-15-2013
|
1.00
|
Finish riveting of the inner ribs for the left tan
|
Details
|
|
|
10-14-2013
|
3.00
|
Fuel tank inner rib seal/rivet
|
Details
|
|
|
10-13-2013
|
3.00
|
Redimple the left tank skin and start rib sealing
|
Details
|
|
|
09-20-2013
|
2.00
|
Riveting of the stiffeners
|
Details
|
  |
|
09-19-2013
|
3.00
|
stiffeners part 1
|
Details
|
|
|
09-18-2013
|
2.00
|
proseal for end ribs
|
Details
|
|
|
09-14-2013
|
6.00
|
Misc fuel tank prep work
|
Details
|
|
|
09-12-2013
|
1.00
|
Flop tube anti rotation and anti hangup brackets
|
Details
|
|
|
09-07-2013
|
1.50
|
Left fuel tank rib dimpling and test assembly
|
Details
|
  |
|
09-05-2013
|
1.50
|
T-410 for outboard rib and baffle line counter sin
|
Details
|
|
|
08-29-2013
|
2.00
|
The rest of the dimpling
|
Details
|
  |
|
08-29-2013
|
0.75
|
Created Fuel Vent Lines
|
Details
|
|
|
08-28-2013
|
1.25
|
Dimpling of tank skins and stiffeners
|
Details
|
  |
|
08-26-2013
|
0.50
|
Added AN fittings to inboard ribs for vent and ret
|
Details
|
|
|
08-23-2013
|
2.00
|
T-410,T-405, flop tube port
|
Details
|
|
|
08-19-2013
|
1.50
|
Fuel tank access ports
|
Details
|
|
|
08-16-2013
|
1.50
|
Fuel tank work, leading edge bracket
|
Details
|
|
|
08-14-2013
|
1.50
|
Fuel trap door
|
Details
|
|
|
08-14-2013
|
1.00
|
Capacitive Fuel senders
|
Details
|
|
|
07-31-2013
|
2.00
|
Fuel drain and ER tank fuel bung fitted and drille
|
Details
|
|
|
07-16-2013
|
1.50
|
Fitting the T-00007 Fuel Caps
|
Details
|
|
|
07-15-2013
|
0.50
|
First look at T-00007 Fuel Cap for RV8
|
Details
|
|
|
05-08-2013
|
2.00
|
Drilled remaining wing tank and stiffeners
|
Details
|
|
|
05-02-2013
|
3.00
|
Drilled left wing tank
|
Details
|
 |
|
04-23-2013
|
1.00
|
Tank re-assembly and baffle drilling
|
Details
|
|
|
04-22-2013
|
2.00
|
Drilling the tank baffle to the Z brackets
|
Details
|
|
|
04-18-2013
|
1.00
|
Remake Z bracket
|
Details
|
|
|
04-09-2013
|
1.00
|
Cut and cleaned the fuel tank stiffeners
|
Details
|
|
|
03-29-2013
|
3.00
|
initial fit of the fuel tanks
|
Details
|
|
|
03-25-2013
|
1.00
|
Bolted Z brackets to the spar
|
Details
|
|
|
03-11-2013
|
1.00
|
Riveted nutplates to the spar and fit inner most Z
|
Details
|
|
|
03-06-2013
|
1.00
|
Rivetted fuel tank Z bracket nut plates
|
Details
|
|
|
02-25-2013
|
2.00
|
Fuel tank Z bracketts
|
Details
|
|