Engine
Work Logs Found:
19
Category Work Time:
75 Hours
Date
Hours
Work Log Summary
Details
01-19-2014
3.00
Engine compression test
Details
11-17-2013
0.00
First engine start (2min video)
Details
11-16-2013
6.00
Ignition relays
Details
11-15-2013
5.00
Mounting/connecting the engine ECUs
Details
09-15-2013
8.00
Building a fuel pumps mount
Details
09-09-2013
1.00
A look at the center console with the throttle
Details
09-08-2013
4.00
Throttle cable (finishing cockpit connection)
Details
09-07-2013
6.00
Throttle cable lever (beginning)
Details
09-06-2013
3.00
Throttle cable (top of engine)
Details
09-04-2013
3.00
Finished grounding, coolant overflow
Details
09-02-2013
5.00
Heater connections to the engine
Details
09-01-2013
4.00
Installing cowling "horns"
Details
08-31-2013
7.00
Finished fitting the cowling
Details
08-30-2013
5.00
Installing cowling hinges
Details
08-29-2013
3.00
Beginning of fitting the cowling
Details
08-26-2013
4.00
Installing the engine, part two, lock it down
Details
08-25-2013
4.00
Installing the engine, part one, the lift
Details
08-24-2013
4.00
Installed prop extension, engine sensors
Details
08-23-2013
0.00
The engine is here
Details
SITE NAVIGATION
Contact Builder
Searey LSX Home
Category
# Logs
# Hours
All
256
1136
Avionics/wiring
61
344
Batteries
1
6
Body panels
11
44
Build Hanger
2
Bulkhead
2
10
Cockpit
23
103
Engine
19
75
Fuel Tank
4
21
Fuselage
7
16
Hull
22
71
Inventory
2
15
Landing Gear
17
74
Miscellaneous
14
27
None
4
1
Paint
3
20
Prop
3
9
Purchase
2
Tools
7
3
Training
1
Turtle Deck
11
45
Windows
16
71
Wings
24
181
Copyright © 2001-2024 Matronics. All Rights Reserved.