Powered By Kitlog Pro v2.0
RV-7 Some assembly required
RV-7
Empennage
Work Logs Found:
122
Category Work Time:
300 Hours
Date
Hours
Work Log Summary
Details
08-11-2018
1.00
Beacon fitting
Details
08-05-2018
1.00
Tested rudder/tailspring clearance
Details
07-07-2018
1.00
Upper rudder fairing done
Details
07-06-2018
1.50
Priming rudder and VS
Details
07-04-2018
2.00
Primed the HS fairings
Details
07-01-2018
1.00
HS fairings
Details
06-24-2018
3.00
Priming with K36
Details
06-21-2018
1.00
Wingtip-tip
Details
06-17-2018
3.00
Fairing finishing
Details
06-16-2018
2.00
Fairing finishing
Details
06-15-2018
2.00
More Tail light fitting
Details
06-14-2018
2.00
Rudder/VS transition finishing up
Details
06-13-2018
2.00
Rudder/VS transition perfectioningering…
Details
06-12-2018
1.00
Rudder/VS transition perfecting…
Details
06-12-2018
1.00
More Tail light fitting
Details
06-10-2018
2.00
Shaping the VS fairing
Details
06-09-2018
1.00
More Tail light fitting
Details
06-09-2018
2.00
Fitting of VS fairing
Details
06-09-2018
1.00
Fitting of VS fairing
Details
06-09-2018
2.00
Bottom rudder fairing adjustment
Details
06-08-2018
3.00
Started Tail light fitting
Details
06-06-2018
2.00
Bottom rudder fairing glassing
Details
06-05-2018
1.00
Upper rudder fairing
Details
06-04-2018
1.00
Upper Rudder fairing
Details
06-02-2018
1.50
Elevator fairings
Details
05-31-2018
1.00
Elevator fairings
Details
05-30-2018
1.50
Elevator fairing
Details
05-29-2018
2.00
Elevator, HS and rudder fairings
Details
05-28-2018
2.00
Rudder fairing cut out II
Details
05-27-2018
1.00
Lower rudder fairing
Details
05-27-2018
2.00
Fixed rudder fairing
Details
05-27-2018
1.00
Drilled HS fairing
Details
05-26-2018
3.00
Elevator fairing
Details
05-23-2018
1.50
Details
05-07-2018
2.00
Lower empennage fairing
Details
05-05-2018
2.00
Primed empennage attachment parts
Details
05-04-2018
3.00
Rudder stop
Details
05-03-2018
1.50
Elevator horns spacers
Details
04-28-2018
2.00
SB 14-01-31 - 8
Details
04-27-2018
2.00
SB 14-01-31 - 7
Details
04-26-2018
3.00
SB 14-01-31 - 6
Details
04-23-2018
1.00
SB 14-01-31 - 5
Details
04-22-2018
1.00
SB 14-01-31 - 4
Details
04-22-2018
2.00
SB 14-01-31 - 3
Details
04-21-2018
1.00
SB 14-01-31 - 2
Details
04-21-2018
2.00
SB 14-01-31 - 1
Details
04-19-2018
1.50
Elevator Horns 2
Details
04-18-2018
1.50
Elevator Horns 1
Details
04-16-2018
0.50
Elevator hinges
Details
04-15-2018
1.00
Fitting the HS 4 - Second set of holes
Details
04-15-2018
1.00
Fitting the HS 4 - Finishing up
Details
04-15-2018
0.50
Fitting the HS 3 - First holes
Details
04-15-2018
0.50
Fitting the HS 2 - Checking area to be drilled
Details
04-15-2018
2.00
Fitting the HS 1 - Clamping in place
Details
04-14-2018
1.00
Horizontal Stabilizer
Details
04-09-2018
0.50
Elevator trim tab hinge
Details
03-31-2018
3.00
Trim tab III
Details
03-31-2018
2.00
Details
03-19-2018
1.00
Elevator fairings
Details
03-12-2018
1.00
Butchered the elevator trim tab
Details
03-11-2018
1.00
Modified the elevator trim tab
Details
12-15-2013
4.00
Riveted the trim tab
Details
12-10-2013
3.00
Primed trim tab parts
Details
12-07-2013
2.00
Drilled the trim tab hinge
Details
12-07-2013
3.00
Bent the trim tab tabs
Details
12-05-2013
3.00
Bent the Left Elevator Tabs
Details
12-02-2013
3.00
Riveted the Left Elevator skeleton
Details
12-01-2013
3.00
Left Elevator Skeleton priming
Details
11-30-2013
3.00
Back Riveting Left Elevator II
Details
11-28-2013
3.00
Left Elevator II
Details
11-11-2013
2.00
Left side stiffeners
Details
11-10-2013
3.00
Trailing edge forming
Details
11-10-2013
4.00
Right elevator riveting
Details
11-09-2013
3.00
Right elevator priming
Details
11-08-2013
3.00
Trim reinforcement plate
Details
11-07-2013
4.00
Right elevator assembly
Details
11-06-2013
3.00
Elevator stiffeners
Details
11-02-2013
3.00
Vertical Stabilizer Spar riveting
Details
11-02-2013
2.00
Rudder trailing edge riveting
Details
11-02-2013
2.00
Rudder trailing edge clean up
Details
11-02-2013
3.00
Rudder Leading Edge
Details
11-01-2013
4.00
Horizontal Stabilizer final riveting
Details
10-31-2013
6.00
Left Horizontal Stabilizer
Details
10-30-2013
2.00
Rudder proseal
Details
10-29-2013
4.00
Riveted the other side of the rudder
Details
10-28-2013
4.00
Rudder riveting
Details
10-27-2013
1.00
Trailing edge prep
Details
10-27-2013
4.00
Rudder skin riveting
Details
10-26-2013
4.00
Riveted the counterbalance.
Details
10-26-2013
6.00
Counterbalance
Details
10-25-2013
3.00
Rudder
Details
10-24-2013
3.00
Riveting rudder skeleton
Details
10-21-2013
2.00
Rudder skin clearance
Details
10-20-2013
8.00
Deburred and dimpled Rudder
Details
10-19-2013
5.00
Rudder riveting
Details
10-18-2013
8.00
Vertical Stabilizer Riveting
Details
10-16-2013
4.00
Horizontal Stabilizer Revering continues
Details
10-15-2013
3.00
Horizontal Stabilizer riveting
Details
10-14-2013
2.00
Preparing for Horizontal Stabilizer riveting
Details
10-13-2013
4.00
Rudder spar
Details
10-12-2013
3.00
Rudder stiffener match drilling
Details
10-10-2013
3.00
Vertical Stabilizer Skeleton and Rudder stiffeners
Details
10-09-2013
3.00
Rudder stiffeners
Details
10-08-2013
3.00
Horizontal Stabilizer Rear Spar riveted
Details
10-06-2013
8.00
Vertical Stabilizer Spar and Skeleton riveted
Details
10-05-2013
4.00
Priming
Details
10-04-2013
8.00
Prepping for priming
Details
10-02-2013
4.00
Vertical Stabilizer Spar and Skin
Details
10-01-2013
3.00
Vertical Stabilizer deburring
Details
09-29-2013
3.00
Drilled VS
Details
09-20-2013
3.00
Drilled Horizontal Stabilizer ribs
Details
09-20-2013
3.00
Deburring Horizontal Stabilizer Skins
Details
09-19-2013
3.00
Marked Horizontal Stabilizer ribs for drilling
Details
09-18-2013
4.00
Forming Horizontal Stabilizer ribs
Details
09-15-2013
2.00
Preparing HS-404 Ribs
Details
09-15-2013
1.00
Bending HS-710 and HS-714
Details
09-14-2013
2.00
Horizontal Stabilizer Rear Spar Assembly
Details
09-14-2013
3.00
FS Front Spar Assembly
Details
09-12-2013
2.00
HS-603PP
Details
08-20-2013
2.00
Remaining empennage arrived
Details
08-19-2013
1.00
Empennage Partially Received
Details
08-15-2013
0.00
Ordered Empennage
Details
SITE NAVIGATION
RV-7 Home
Category
# Logs
# Hours
All
984
2084
Avionics
27
40
Empennage
122
300
Engine
4
19
Finishing
103
211
Firewall Forward
20
28
Fuselage
392
782
Miscellaneous
10
13
None
1
Practice
4
6
Shop Supplies
8
14
Training
2
16
Wings
275
627
Workshop
8
14
Workshop and Supplie
8
14
Copyright © 2001-2024 Matronics. All Rights Reserved.