KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Some assembly required
Work Logs Found: 122
Category Work Time: 300 Hours
 Date
Hours
Work Log Summary

Details

 08-11-2018
1.00
Beacon fitting
Details
     

 08-05-2018
1.00
Tested rudder/tailspring clearance
Details
       

 07-07-2018
1.00
Upper rudder fairing done
Details
       

 07-06-2018
1.50
Priming rudder and VS
Details
       

 07-04-2018
2.00
Primed the HS fairings
Details
     

 07-01-2018
1.00
HS fairings
Details
       

 06-24-2018
3.00
Priming with K36
Details
       

 06-21-2018
1.00
Wingtip-tip
Details
       

 06-17-2018
3.00
Fairing finishing
Details
       

 06-16-2018
2.00
Fairing finishing
Details
     

 06-15-2018
2.00
More Tail light fitting
Details
       

 06-14-2018
2.00
Rudder/VS transition finishing up
Details
     

 06-13-2018
2.00
Rudder/VS transition perfectioningering…
Details
       

 06-12-2018
1.00
Rudder/VS transition perfecting…
Details
       

 06-12-2018
1.00
More Tail light fitting
Details
       

 06-10-2018
2.00
Shaping the VS fairing
Details
       

 06-09-2018
1.00
More Tail light fitting
Details
     

 06-09-2018
2.00
Fitting of VS fairing
Details
       

 06-09-2018
1.00
Fitting of VS fairing
Details
     

 06-09-2018
2.00
Bottom rudder fairing adjustment
Details
       

 06-08-2018
3.00
Started Tail light fitting
Details
       

 06-06-2018
2.00
Bottom rudder fairing glassing
Details
       

 06-05-2018
1.00
Upper rudder fairing
Details
     

 06-04-2018
1.00
Upper Rudder fairing
Details
     

 06-02-2018
1.50
Elevator fairings
Details
       

 05-31-2018
1.00
Elevator fairings
Details
       

 05-30-2018
1.50
Elevator fairing
Details

 05-29-2018
2.00
Elevator, HS and rudder fairings
Details
       

 05-28-2018
2.00
Rudder fairing cut out II
Details
       

 05-27-2018
1.00
Lower rudder fairing
Details
       

 05-27-2018
2.00
Fixed rudder fairing
Details
     

 05-27-2018
1.00
Drilled HS fairing
Details
     

 05-26-2018
3.00
Elevator fairing
Details
       

 05-23-2018
1.50

Details
       

 05-07-2018
2.00
Lower empennage fairing
Details
     

 05-05-2018
2.00
Primed empennage attachment parts
Details
       

 05-04-2018
3.00
Rudder stop
Details
       

 05-03-2018
1.50
Elevator horns spacers
Details
       

 04-28-2018
2.00
SB 14-01-31 - 8
Details
     

 04-27-2018
2.00
SB 14-01-31 - 7
Details
       

 04-26-2018
3.00
SB 14-01-31 - 6
Details
       

 04-23-2018
1.00
SB 14-01-31 - 5
Details

 04-22-2018
1.00
SB 14-01-31 - 4
Details
       

 04-22-2018
2.00
SB 14-01-31 - 3
Details
       

 04-21-2018
1.00
SB 14-01-31 - 2
Details
       

 04-21-2018
2.00
SB 14-01-31 - 1
Details
       

 04-19-2018
1.50
Elevator Horns 2
Details
       

 04-18-2018
1.50
Elevator Horns 1
Details
       

 04-16-2018
0.50
Elevator hinges
Details
     

 04-15-2018
1.00
Fitting the HS 4 - Second set of holes
Details
       

 04-15-2018
1.00
Fitting the HS 4 - Finishing up
Details
     

 04-15-2018
0.50
Fitting the HS 3 - First holes
Details
       

 04-15-2018
0.50
Fitting the HS 2 - Checking area to be drilled
Details
       

 04-15-2018
2.00
Fitting the HS 1 - Clamping in place
Details
       

 04-14-2018
1.00
Horizontal Stabilizer
Details
     

 04-09-2018
0.50
Elevator trim tab hinge
Details
     

 03-31-2018
3.00
Trim tab III
Details
       

 03-31-2018
2.00

Details

 03-19-2018
1.00
Elevator fairings
Details
       

 03-12-2018
1.00
Butchered the elevator trim tab
Details

 03-11-2018
1.00
Modified the elevator trim tab
Details

 12-15-2013
4.00
Riveted the trim tab
Details
       

 12-10-2013
3.00
Primed trim tab parts
Details

 12-07-2013
2.00
Drilled the trim tab hinge
Details
       

 12-07-2013
3.00
Bent the trim tab tabs
Details
       

 12-05-2013
3.00
Bent the Left Elevator Tabs
Details
       

 12-02-2013
3.00
Riveted the Left Elevator skeleton
Details
     

 12-01-2013
3.00
Left Elevator Skeleton priming
Details
       

 11-30-2013
3.00
Back Riveting Left Elevator II
Details
       

 11-28-2013
3.00
Left Elevator II
Details
       

 11-11-2013
2.00
Left side stiffeners
Details
     

 11-10-2013
3.00
Trailing edge forming
Details
       

 11-10-2013
4.00
Right elevator riveting
Details
       

 11-09-2013
3.00
Right elevator priming
Details

 11-08-2013
3.00
Trim reinforcement plate
Details
       

 11-07-2013
4.00
Right elevator assembly
Details
       

 11-06-2013
3.00
Elevator stiffeners
Details
     

 11-02-2013
3.00
Vertical Stabilizer Spar riveting
Details
       

 11-02-2013
2.00
Rudder trailing edge riveting
Details
       

 11-02-2013
2.00
Rudder trailing edge clean up
Details
       

 11-02-2013
3.00
Rudder Leading Edge
Details
       

 11-01-2013
4.00
Horizontal Stabilizer final riveting
Details
       

 10-31-2013
6.00
Left Horizontal Stabilizer
Details
       

 10-30-2013
2.00
Rudder proseal
Details
       

 10-29-2013
4.00
Riveted the other side of the rudder
Details
       

 10-28-2013
4.00
Rudder riveting
Details

 10-27-2013
1.00
Trailing edge prep
Details
     

 10-27-2013
4.00
Rudder skin riveting
Details
       

 10-26-2013
4.00
Riveted the counterbalance.
Details
       

 10-26-2013
6.00
Counterbalance
Details
     

 10-25-2013
3.00
Rudder
Details
     

 10-24-2013
3.00
Riveting rudder skeleton
Details
       

 10-21-2013
2.00
Rudder skin clearance
Details

 10-20-2013
8.00
Deburred and dimpled Rudder
Details
     

 10-19-2013
5.00
Rudder riveting
Details
       

 10-18-2013
8.00
Vertical Stabilizer Riveting
Details
       

 10-16-2013
4.00
Horizontal Stabilizer Revering continues
Details
       

 10-15-2013
3.00
Horizontal Stabilizer riveting
Details
       

 10-14-2013
2.00
Preparing for Horizontal Stabilizer riveting
Details
       

 10-13-2013
4.00
Rudder spar
Details
       

 10-12-2013
3.00
Rudder stiffener match drilling
Details
       

 10-10-2013
3.00
Vertical Stabilizer Skeleton and Rudder stiffeners
Details

 10-09-2013
3.00
Rudder stiffeners
Details

 10-08-2013
3.00
Horizontal Stabilizer Rear Spar riveted
Details

 10-06-2013
8.00
Vertical Stabilizer Spar and Skeleton riveted
Details
       

 10-05-2013
4.00
Priming
Details
       

 10-04-2013
8.00
Prepping for priming
Details

 10-02-2013
4.00
Vertical Stabilizer Spar and Skin
Details
       

 10-01-2013
3.00
Vertical Stabilizer deburring
Details

 09-29-2013
3.00
Drilled VS
Details
       

 09-20-2013
3.00
Drilled Horizontal Stabilizer ribs
Details
       

 09-20-2013
3.00
Deburring Horizontal Stabilizer Skins
Details
     

 09-19-2013
3.00
Marked Horizontal Stabilizer ribs for drilling
Details
       

 09-18-2013
4.00
Forming Horizontal Stabilizer ribs
Details
       

 09-15-2013
2.00
Preparing HS-404 Ribs
Details
       

 09-15-2013
1.00
Bending HS-710 and HS-714
Details
     

 09-14-2013
2.00
Horizontal Stabilizer Rear Spar Assembly
Details
     

 09-14-2013
3.00
FS Front Spar Assembly
Details

 09-12-2013
2.00
HS-603PP
Details
       

 08-20-2013
2.00
Remaining empennage arrived
Details

 08-19-2013
1.00
Empennage Partially Received
Details
       

 08-15-2013
0.00
Ordered Empennage
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.