Date
|
Hours
|
Work Log Summary

|
Details

|
08-12-2013
|
0.70
|
Completion of the vertical stabilizer.
|
Details
|
|
|
08-07-2013
|
2.50
|
Riveting the skin to the vertical stabilizer skele
|
Details
|
|
|
08-06-2013
|
1.50
|
Lower rudder hinge rivets to the main vetical spar
|
Details
|
|
|
08-06-2013
|
1.00
|
Assembling the skeleton and skin of the vertical s
|
Details
|
|
|
08-05-2013
|
0.70
|
Riveting the vertical stabilizer rear spar hinges.
|
Details
|
|
|
08-05-2013
|
1.00
|
Prep and priming the vertical stablizer skin.
|
Details
|
|
|
07-08-2013
|
0.70
|
More priming the vertical stablizer.
|
Details
|
 |
|
07-02-2013
|
1.50
|
Countersink and dimpling the VS-808PP
|
Details
|
 |
|
06-27-2013
|
0.70
|
Vertical stabilzer VS-808PP prep
|
Details
|
|
|
06-27-2013
|
1.50
|
Rib and skin prep.
|
Details
|
|
|
06-26-2013
|
1.50
|
Vertical stabilizer rear spar dimpling.
|
Details
|
|
|
06-25-2013
|
1.50
|
Vertical stablizer, spar, fluting and assembly
|
Details
|
|
|
06-25-2013
|
1.50
|
Cleko and drill the holes in the skin.
|
Details
|
|