Powered By Kitlog Pro v2.0
Toms RV9-A project
RV-9A
10 - Cowl & Baffle
Work Logs Found:
38
Category Work Time:
88 Hours
Date
Hours
Work Log Summary
Details
02-05-2013
3.00
Installed top cowling pins and Nosewheel fairing
Details
02-05-2013
3.50
Bottom Cowling Support and hinge pins
Details
01-26-2013
3.50
Installed left cowling pin and cowl epoxy
Details
01-21-2013
8.00
Front Baffle Seal, Platenuts and RTV
Details
01-13-2013
4.00
Fitting Top Cowling and Baffle
Details
01-12-2013
3.50
Right Side baffle final riveting
Details
01-04-2013
1.50
Front spinner nutplate installed and test fit
Details
01-04-2013
3.50
Fabricating the Prop Filler Plates
Details
01-03-2013
1.50
Installed Baffle Seal on bottom cowl inlet
Details
01-03-2013
2.50
Fabricated Prop Spinner gap seal plates
Details
01-01-2013
2.50
Threaded rod baffle keeper installation
Details
01-01-2013
3.50
Left side baffle final riveting and top cowl clear
Details
01-01-2013
1.00
Center baffle rough sizing
Details
12-31-2012
3.50
Left Side Baffle progress
Details
12-30-2012
3.50
Front Baffles started
Details
11-12-2012
0.50
Top Cowling retainer pin bracket
Details
11-11-2012
2.00
Riveted pin clips
Details
10-27-2012
2.50
Second coat epoxy and final hinge riveting
Details
10-26-2012
2.50
First coat epoxy acetone for lower cowling
Details
10-26-2012
1.00
Cowling inlet finish epoxy coat
Details
10-21-2012
0.50
Riveted Oil Access door
Details
10-21-2012
1.50
Install Cowling Inlet Ducts
Details
10-20-2012
2.50
Oil Door problem resolved
Details
10-15-2012
0.00
Part 2 - Oil Door flush latch problem
Details
10-15-2012
0.00
Part 1 - Oil Door flush latch problem
Details
10-14-2012
1.50
Top Cowl sanding and second epoxy coat
Details
10-14-2012
2.50
Riveted lower cowling top hinge
Details
10-14-2012
3.50
Epoxy skim coat top cowling inside and out
Details
10-13-2012
1.50
Riveted side and bottom fuselage hinge
Details
10-07-2012
5.00
Drilled top and bottom cowling piano hinge
Details
10-06-2012
2.00
Installed side cowling piano hinge
Details
09-30-2012
0.00
Part 2 - Trial fit of lower cowling (Add'l picture
Details
09-30-2012
1.50
Part 1 - Trial fit of lower cowling
Details
09-23-2012
2.00
Part 4 - Set clearance for top Cowling
Details
09-23-2012
0.50
Part 3 - Sanded and match drilled front cowling
Details
09-23-2012
2.50
Part 2 - Installed Oil Door
Details
09-21-2012
2.00
Sanded Front cowling for fit
Details
09-21-2012
2.00
Part 1 - Test Fit canopy and made wood plate for s
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
615
1246
01- Why RV-9
2
02- Shop
10
27
03- Empennage
56
112
04 - Wings
73
172
05- Fuselage
121
238
06 - Gear & Fairing
27
68
07 - Firewall Fwd
70
150
08 - FAB
8
19
09- Tip-Up Canopy
69
152
10 - Cowl & Baffle
38
88
11 - Avionics
79
173
12 - Registration
7
8
13 - Training
2
6
14 - Phase 1 Testing
11
18
15 - RV Trips
1
2
99 - Miscellaneous
41
13
Copyright © 2001-2025 Matronics. All Rights Reserved.