Toms RV9-A project
RV-9A
11 - Avionics
Work Logs Found:
79
Category Work Time:
173 Hours
Date
Hours
Work Log Summary
Details
11-02-2013
2.50
Reinstalled EMS Skyview module and tested
Details
08-31-2013
1.00
Tested Landing Lights and Fuel Sender wiring
Details
08-30-2013
5.00
Finished routing & bundling wiring
Details
08-29-2013
3.50
Re-installed Avionics panels and riveted data plat
Details
08-28-2013
3.50
Primed and Top Coated Avionics panels
Details
08-25-2013
0.00
Remaining Punch list before moving to KDYL
Details
08-25-2013
4.00
Fuselage final routing and bundling.
Details
08-24-2013
3.00
Nav Strobe Wing wiring and termination
Details
08-17-2013
6.00
Wing Root Wiring
Details
08-11-2013
3.00
Stick Grip Final Wiring
Details
08-11-2013
1.00
Skyview Backup Battery Test
Details
08-11-2013
0.50
Registered ELT at NOAA / SARSAT
Details
08-10-2013
3.50
OAT Sensor Wiring
Details
08-04-2013
1.50
Annunciator Warning Light
Details
07-05-2013
1.50
Secured aft baggage avionics wiring
Details
07-04-2013
3.00
Engine cable support and cover plates
Details
06-29-2013
2.50
Top Coated Avionics Panel Inserts
Details
06-29-2013
1.50
NACA Vent and Screen Installation
Details
06-22-2013
0.50
Alternate Static Installation
Details
06-22-2013
1.00
Alternate Air Push Pull Install
Details
06-09-2013
1.00
Wired Precision GPS input for Transponder 2020 man
Details
06-09-2013
1.00
Tested Garmin GPS and Transponder
Details
06-09-2013
0.00
RV outside shots for GPS testing
Details
06-09-2013
1.00
Reconfigured VP-X Software
Details
06-08-2013
0.50
Drilled holes for Coax ELT Pass through
Details
06-02-2013
1.00
Fixed Com2 Tx issue
Details
05-19-2013
4.00
Completed Flap Switch and wiring harness
Details
05-18-2013
1.00
Headset Testing
Details
05-18-2013
4.00
Flaps & Position Sensor Installation
Details
05-17-2013
2.00
Headset Mounting & Wiring
Details
05-12-2013
1.00
Tied in Serial 1 Transponder to both displays
Details
05-12-2013
0.00
Headphone Jack Placement pictures
Details
05-12-2013
3.00
Fabricated Headpone Jacks
Details
05-05-2013
4.50
Transponder, ELT & Pitch Servo Wiring
Details
04-28-2013
3.00
ADSB Wiring and Other minor items
Details
04-21-2013
3.50
Avionics and trim wiring
Details
04-14-2013
3.00
Ran wiring for Pitch trim servo and tail strobe
Details
04-14-2013
3.00
Installed Electric Roll Trim Servo
Details
04-07-2013
2.50
Antenna Coax Runs
Details
03-31-2013
4.00
Ran Pmag Wiring
Details
03-30-2013
3.50
VPX Wiring 4
Details
03-24-2013
4.50
VPX Wiring Part 3
Details
03-24-2013
1.00
Mounting SkyView Net Hub
Details
03-24-2013
2.00
Completed EGT - CHT Wiring
Details
03-23-2013
2.00
Planning Coax runs and wiring details
Details
03-17-2013
1.50
VPX Wiring Continued Part 2
Details
03-15-2013
3.50
VP-X Wiring Continued
Details
03-14-2013
2.50
Wiring harness for VPX Switches
Details
03-13-2013
1.50
VP-X and Skyview Wiring
Details
03-12-2013
1.50
Mounted Rear Avionics Harness and tested
Details
03-11-2013
1.00
Ran main power cable to VP-X
Details
03-10-2013
2.00
Started Wiring Engine Monitor
Details
03-10-2013
1.50
Skyview ARINC Mounting
Details
03-10-2013
1.50
Mounted Backup Alternator Volt Regulator
Details
03-09-2013
1.50
Ran wiring and string through conduit
Details
03-09-2013
2.00
Mounted Skyview Engine Monitor Module
Details
03-09-2013
3.00
Installed VP-X Module
Details
03-09-2013
2.00
Installed Skyview ADSB Unit
Details
03-03-2013
3.50
Installed Garmin Skyview and Backup Batteries
Details
03-02-2013
2.50
Installed center stack avionics
Details
03-02-2013
4.00
Avionics Rail Mounts
Details
02-02-2013
3.00
VP-X Bench Test Configuraiton upload
Details
10-06-2012
1.00
Installed Eyeball fresh air vents
Details
09-23-2012
1.00
Marked avionics cut for intermediate bulkhead
Details
09-16-2012
3.50
PArt 3 - Drilling Platenuts and mounting avionics
Details
09-16-2012
3.50
Part 2 - Drilling and Riveting the back panel
Details
09-16-2012
4.00
Part 1 - Fitting the carbon fiber panel
Details
09-10-2012
1.00
Avionics Arrive
Details
08-29-2012
2.00
Mounted Transponder and UAT blade antennas
Details
02-19-2012
1.00
High Level Avionics Wire planning
Details
02-12-2012
1.50
RAMI Dual Com Antenna Installation
Details
02-04-2012
1.00
Test Mounted ELT Bracket
Details
02-04-2012
2.00
Rived Dynon ADHARS Bracket to Fuselage
Details
02-04-2012
1.00
Install DB9 connector to Pitch Servo
Details
01-29-2012
1.00
Finished Riveting Pitch Servo Bracket
Details
01-29-2012
2.50
Fabricated ADHARS mount
Details
01-28-2012
1.50
Pitch Servo Rough-in and review
Details
05-30-2011
2.00
Panel Planning V 2.0
Details
05-22-2011
1.50
First Cut Panel Layout
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
615
1246
01- Why RV-9
2
02- Shop
10
27
03- Empennage
56
112
04 - Wings
73
172
05- Fuselage
121
238
06 - Gear & Fairing
27
68
07 - Firewall Fwd
70
150
08 - FAB
8
19
09- Tip-Up Canopy
69
152
10 - Cowl & Baffle
38
88
11 - Avionics
79
173
12 - Registration
7
8
13 - Training
2
6
14 - Phase 1 Testing
11
18
15 - RV Trips
1
2
99 - Miscellaneous
41
13