Powered By Kitlog Pro v2.0
Toms RV9-A project
RV-9A
07 - Firewall Fwd
Work Logs Found:
70
Category Work Time:
150 Hours
Date
Hours
Work Log Summary
Details
12-14-2013
3.00
Adjusted Exhaust pipes for cowling clearance
Details
11-27-2013
2.50
Fuel Flow Testing - Straight and Level
Details
11-27-2013
0.50
Fuel Flow Testing - Climb configuration
Details
11-25-2013
0.50
Secured Right Side EGT CHT Wiring
Details
11-25-2013
0.25
Prop Tracking
Details
11-25-2013
1.00
Filled with 7 Quarts of Mineral Oil
Details
11-24-2013
15.00
Installed Spark Plugs, Drained preservative oil
Details
11-08-2013
1.00
Installed Prop
Details
11-02-2013
0.50
Sftety tied gascolator
Details
11-01-2013
2.00
Drilled heat shield bolt through firewall
Details
09-02-2013
0.50
Installed Engine Oil filler neck
Details
08-28-2013
1.00
Fuel Pump Overflow Tubing
Details
08-27-2013
0.50
Sealing Firewall Pass through
Details
07-25-2013
2.00
Reiff Oil sump heater installation
Details
06-30-2013
0.00
Ordered Multiple-Point Temp labels
Details
06-30-2013
3.50
Control Cable Installation
Details
06-24-2013
1.50
Primer Line Installation
Details
06-23-2013
3.50
Oil Cooler Shutter Cable Installation
Details
06-23-2013
0.00
Additinal Picture Oil Cooler Shutter Installation
Details
06-22-2013
1.00
Safety Tie Carb and Alternator
Details
06-22-2013
0.50
Blast Tubes for P-Mags
Details
06-16-2013
3.50
Throttle Mixture and Carb Heat Controls
Details
06-16-2013
2.50
Alternate Air Push-Pull Control
Details
06-15-2013
2.00
Primer lines FWF
Details
06-08-2013
0.50
Ordered Mineral Oil and Brake Fluid
Details
04-07-2013
1.50
P-Mag Manifold pressure tubing
Details
08-30-2012
0.00
Things to complete before moving to DYL
Details
08-10-2012
1.50
Bastard canopy hinge pins take two
Details
07-15-2012
3.00
Riveted upper cabin fuselage skin
Details
07-14-2012
8.00
Riveted canopy frame rear skin
Details
07-04-2012
2.00
Oil cooler shutter final installation
Details
07-01-2012
4.50
Riveted Baggage Floor Pans
Details
05-20-2012
2.00
Reworked Fuel Line
Details
03-10-2012
1.50
Remade Fuel & Brake Line center Console spacers
Details
03-03-2012
1.50
Run Fuel Line right
Details
03-03-2012
1.50
Fuel Line Left
Details
02-26-2012
2.00
Pitot and AOS cockpit install
Details
02-25-2012
3.00
Install Fuel Lines
Details
01-28-2012
1.00
Prop Extension and spinner trial fit
Details
01-16-2012
4.50
Front Baffle Installation
Details
01-15-2012
4.50
Passenger Side Baffle Installation
Details
01-08-2012
3.50
Passenger Side Baffle prep
Details
01-07-2012
0.50
Mainfold pressure tubing
Details
01-07-2012
3.50
Baffle and Oil Filter Mounting
Details
01-01-2012
1.50
Review and Analysis for MAP Sensor tubing
Details
12-31-2011
1.00
Finished Engine Breather
Details
12-31-2011
3.50
Dynon MAP Sensor mounting and Alodyne Baffles
Details
12-30-2011
1.00
Starter Cable Fabrication and Installation
Details
12-29-2011
3.00
Oil Pressure line support and engine electric
Details
12-27-2011
2.00
EGT Probe and Engine Baffle Install
Details
12-22-2011
2.00
CHT Probe install, fuel and breather line support
Details
12-18-2011
4.50
Red Cube and ATC Fuseholders install
Details
11-05-2011
2.00
Finish Exhaust hangars & Torque carb bolts
Details
10-29-2011
2.50
Vetterman Enhaust & Heat Muff installtion
Details
10-29-2011
0.50
Gascolator Installation
Details
10-23-2011
2.50
Reworked Engine attachment and installed cotter pi
Details
10-06-2011
3.50
Mounting the Engine to the Fuselage
Details
10-05-2011
0.00
Electric Primer mounting configuration
Details
10-02-2011
2.00
Riveted Gascolater Stiffener
Details
10-02-2011
1.00
Marked and Drilled FW Cable Penetrations
Details
09-25-2011
5.00
Battery Contactor & Starter Relay FWF Install
Details
09-24-2011
2.00
Installed Andair gascolator and stiffener
Details
09-24-2011
2.00
Heat box install and FW recess sealing
Details
09-18-2011
4.00
Install battery box and firewall recess
Details
09-02-2011
3.50
Drilled engine to fuselage bolt holes
Details
09-01-2011
0.00
Lycoming O320 Arrives
Details
06-13-2011
0.00
Ordered Lycoming O320-D2A from AeroSport Power
Details
12-17-2010
0.00
Catto Prop Arrives !
12-17-2010
0.00
Catto Prop Arrives !
Details
05-22-2010
2.50
Received Finishing Kit, Inventoried parts
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
615
1246
01- Why RV-9
2
02- Shop
10
27
03- Empennage
56
112
04 - Wings
73
172
05- Fuselage
121
238
06 - Gear & Fairing
27
68
07 - Firewall Fwd
70
150
08 - FAB
8
19
09- Tip-Up Canopy
69
152
10 - Cowl & Baffle
38
88
11 - Avionics
79
173
12 - Registration
7
8
13 - Training
2
6
14 - Phase 1 Testing
11
18
15 - RV Trips
1
2
99 - Miscellaneous
41
13
Copyright © 2001-2025 Matronics. All Rights Reserved.