KitLog pro

Powered By Kitlog Pro v2.0

Ky Bearhawk Construction site
Work Logs Found: 43
Category Work Time: 84 Hours
 Date
Hours
Work Log Summary

Details

 03-16-2015
2.00
Riveted Fairleads, Wiring Conduit in place
Details
     

 11-30-2014
1.50
Cable Routing
Details
       

 11-29-2014
1.50
Fairlead installation
Details
       

 09-21-2014
1.00
Aileron Cable routing
Details
       

 09-16-2014
1.00
Aileron bellcranks and outer hinges
Details

 09-15-2014
1.50
Pulley brackets and Flap push rods
Details
       

 09-14-2014
2.00
Mounted Flap drives
Details
       

 09-13-2014
2.00
A little painting and aileron bell crank calculati
Details
       

 09-11-2014
1.00
Cable retainers and more welding
Details
       

 09-09-2014
1.00
Right False Spar
Details

 09-08-2014
1.00
Right False spar
Details

 09-06-2014
5.00
False Spar / Flap drive nose rib installations
Details
       

 09-02-2014
1.00
Mounted hinges, Installed some rivets
Details
       

 08-14-2014
1.50
Wing Assembly Details
Details
       

 08-13-2014
1.50
Aileron Pocket Ribs and False Spars
Details
       

 08-11-2014
1.50
Aileron Drive
Details

 08-02-2014
4.00
False Spar tank mounts and flap supports
Details
       

 07-31-2014
2.00
Right wing flap support tube
Details
       

 07-30-2014
2.00
Flap Torque tube root support
Details
     

 07-29-2014
2.00
Root flap torqe tube support construction
Details
       

 07-28-2014
2.00
Figuring out the bolts and nuts
Details

 07-09-2014
1.50
False Spars and Pocket ribs
Details
       

 07-08-2014
1.50
False Spars and Pocket Ribs
Details

 07-07-2014
2.00
False Spars
Details
     

 07-05-2014
1.50
Rear ribs and False Spar
Details
       

 07-04-2014
6.00
Nose rib installation
Details
       

 07-03-2014
2.50
Nose Rib attach angles for flap drive connection
Details

 06-30-2014
1.50
More nose ribs
Details
       

 06-29-2014
0.50
Nose Rib install
Details

 06-28-2014
1.00
Nose Rib Installation
Details
       

 06-26-2014
1.00
Installing Nose Ribs
Details
       

 06-23-2014
2.00
Aligning Nose Ribs
Details

 06-15-2014
3.00
Center Rib installation
Details

 06-14-2014
6.00
Rivet Center Ribs in
Details

 08-18-2013
2.00
Right wing alignment and center rib install
Details
       

 08-17-2013
4.00
Installing Center Ribs Left Wing
Details
       

 08-15-2013
2.00
Wing Alignment
Details
       

 08-14-2013
1.50
Aligning the spars
Details

 08-06-2013
1.50
S;par placement on jig
Details
       

 08-05-2013
1.50
Cross Supports
Details
     

 08-04-2013
2.00
Post 2 mounted
Details
       

 08-03-2013
1.00
1st post done
Details
       

 08-02-2013
1.00
Putting the wing assembly jig together
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.