Powered By Kitlog Pro v2.0
TAB Aircraft LLC Web Site
Searey LSX
Engine
Work Logs Found:
38
Category Work Time:
28 Hours
Date
Hours
Work Log Summary
Details
04-18-2015
0.00
Page 507 Fixed Coolent Tank
Details
03-22-2015
0.00
Page 506 Replaced Heater Control Valve
Details
03-16-2015
0.00
Page 504 Changed Gearbox Oil
Details
03-14-2015
0.00
Page 503 Replaced Coolent Tank
Details
11-15-2014
0.00
Page 502 Repaired Heater Hose Coupling
Details
10-12-2013
0.50
Page 378 Ran the Engine
Details
09-24-2013
1.00
Page 361 Started Engine for a 2nd time
Details
09-22-2013
1.00
Viking 1st Engine Start Video
Details
09-20-2013
0.50
Page 358 Getting ready to start the engine
Details
09-16-2013
0.25
Page 354 Clamped Down the Throttle Cable
Details
08-24-2013
1.00
Page 324 Drilled new holes in the Cowling
Details
08-23-2013
0.50
Page 323 Filled in Holes with Fiberglass Paste
Details
08-22-2013
1.00
Page 322 Repositioning the Cowling
Details
08-21-2013
1.50
Page 321 Re-did the Overflow Bottle
Details
08-20-2013
0.25
Page 320 Installed the Oil Fill Tube Breather
Details
08-19-2013
0.50
Page 319 Moved Cooling Pipe
Details
08-18-2013
3.00
Page 318 Installed Viking Gear Box Cooling Ducts
Details
08-15-2013
0.50
Page 315 Installed the Cowling
Details
08-14-2013
1.50
Page 314 Installing the Hinges on the Cowling
Details
08-10-2013
1.00
Page 308 The Clean Up After
Details
08-09-2013
0.75
Page 307 Mounting the Viking Engine 2
Details
08-08-2013
0.25
Page 306 Mounting the Viking Engine 1
Details
08-07-2013
1.00
Page 305 Installed Overflow Bottles
Details
08-07-2013
0.50
Page 303 Mounted the ECU on a panel
Details
08-06-2013
2.00
Page 302 Compleated Fuel System
Details
08-05-2013
5.00
Page 301 Installed the Fuel Pump System
Details
08-04-2013
0.50
Page 300 Installed the upper Heater Connection
Details
08-02-2013
1.00
Page 298 Installed the bottom Heater Connection
Details
08-01-2013
0.50
Page 297 Adding a Hobbs Hour Meter Switch
Details
07-31-2013
1.50
Page 296 Mounting the Fuel Pump
Details
07-29-2013
0.25
Page 294 Fuel Pressure Probe
Details
07-29-2013
0.50
Page 293 Oil Temp. and Pressure Probes
Details
07-29-2013
0.25
Page 292 Prop Reduction Gear Temp. Probe
Details
07-28-2013
0.50
Page 291 Installing Prop Extension
Details
07-27-2013
0.00
Page 290 Bringing the Viking Home
Details
07-26-2013
0.00
Picking up the Viking Video
Details
07-25-2013
0.00
Page 289 Picking up the Viking
Details
07-24-2013
0.00
Page 288 Getting ready for the Viking
Details
SITE NAVIGATION
Contact Builder
Searey LSX Home
Category
# Logs
# Hours
All
546
800
Aircraft
7
2
Airframe
58
113
Avionics
45
86
Background
20
1
Brakes
5
4
Cockpit
67
130
Education
17
2
Engine
38
28
Exterior Trim
24
25
Fly-In/Party
7
Fuselage
5
9
Gear Assembly
21
22
Hull
12
19
Interior Trim
27
38
Miscellaneous
22
2
Modifications
42
72
None
1
Prop
5
4
Turtle Deck
16
32
Wings
42
80
Wiring
53
131
Work Shop/Hanger
12
Copyright © 2001-2024 Matronics. All Rights Reserved.