KitLog pro

Powered By Kitlog Pro v2.0

Steve & Nancy Riffe
Work Logs Found: 81
Category Work Time: 210 Hours
 Date
Hours
Work Log Summary

Details

 07-08-2016
1.00
Sniffle valve-done
Details
     

 07-07-2016
2.00
Sniffle valve-1
Details
       

 07-02-2016
4.00
GPS antenna shelf--finish
Details
       

 07-01-2016
2.00
Lower cowling hinges, GPS antenna mount
Details
       

 07-01-2016
3.00
Lower cowling hinges, GPS antenna mount
Details
       

 07-01-2016
2.00
GPS mount
Details
       

 06-30-2016
3.00
Prep lower cowl for hnge rivets
Details
       

 06-29-2016
5.00
Resin to cowl interior, install nutplates for nose
Details
       

 06-28-2016
4.00
Epoxy cowl, begin GPS antenna mount
Details
       

 06-27-2016
6.00
Cowl inlet seals, GPS shelf
Details
       

 06-15-2016
3.00
CHT/EGT wiring-left side
Details
       

 06-14-2016
3.00
EGT/CHT wires connected-R. side
Details
       

 06-14-2016
1.00
Alternator blast tube
Details
       

 06-14-2016
2.00
Alternate air door
Details
       

 07-01-2015
2.00
Filled left brake line--again
Details
       

 06-30-2015
2.00
Brake leak-left side
Details
       

 06-29-2015
1.00
Alternate air cable
Details
       

 06-25-2015
4.00
Fresh air scat tube, NAV connector for GTN
Details
       

 06-24-2015
3.00
Installed some firesleeves, begin config on VP-X
Details
       

 06-23-2015
3.00
Cooling/Defrost fan install
Details
       

 06-22-2015
4.00
Scat tube-heat muff to cabin
Details
       

 06-20-2015
3.00
Rivet baggage hinge support, wire red cube
Details
       

 06-17-2015
3.00
Fit baggage floor, prepped top forward skin
Details
       

 06-15-2015
3.00
Fuel lines for red cube
Details
       

 06-12-2015
1.00
Remove top skin, squeeze iin a few rivets
Details
     

 06-11-2015
1.00
Temp install top skin, bubbles in brake line
Details
       

 06-10-2015
1.00
Add nut plates for r. brake line
Details

 06-09-2015
5.00
Upper cowl attach, more brake bubbles
Details
       

 06-07-2015
3.00
More brake bleed prep, start upper cowl hinge
Details
       

 06-05-2015
4.00
Test fuel system
Details
       

 06-01-2015
3.00
Air test brake system
Details
       

 05-30-2015
5.00
Torque exhaust nuts, run lower plug wires
Details
       

 05-29-2015
3.00
Firewall pass thru
Details
       

 05-28-2015
2.00
Drilled pipes to #30 for probes
Details
       

 05-27-2015
4.00
Drill holes for EGT probes
Details
       

 05-26-2015
5.00
Exhast hangars-2, heat muff
Details
       

 05-24-2015
5.00
Exhaust hangars-1
Details
       

 05-22-2015
4.00
Exhaust install
Details
       

 05-21-2015
3.00
Adel clamp fun!
Details
       

 05-20-2015
3.00
Temp sensor wire, connect mags to switches
Details
       

 05-19-2015
2.00
R. Mag wiring
Details
       

 05-18-2015
4.00
Shunt wiring, L mag wiring
Details
       

 05-17-2015
3.00
ANL wire to contactor, Transducer connections
Details
       

 05-09-2015
4.00
Oil & fuel pressure sensors connected
Details
       

 05-08-2015
2.00
MAP sensor wire connection
Details
       

 05-07-2015
1.00
EMS module-remove extra wires
Details
       

 05-06-2015
4.00
EMS wire run, plastic brake line-misc
Details
       

 05-04-2015
2.00
MAP, shunt & ANL mounted to F/W
Details
       

 05-03-2015
3.00
MAP sensor, shunt, ANL mounting
Details
       

 05-01-2015
1.00
MAP Sensor-restrictor
Details
       

 04-30-2015
3.00
Temp sensor,begin ANL & shunt doubler
Details
       

 04-29-2015
1.00
Transducor manifold, alternator wire
Details
       

 04-28-2015
1.00
Engine ground strap
Details
       

 04-26-2015
2.00
EMS mounting & wire run
Details
       

 04-22-2015
4.00
Starter cable install
Details
       

 04-20-2015
2.00
Control cable install--done!
Details
       

 04-19-2015
2.00
Attach throttle cable and governor cable
Details
       

 04-18-2015
3.00
Throttle quadrant-final install
Details
       

 04-17-2015
2.00
Riveted left F-804N-1 Bulkhead cap
Details
       

 04-15-2015
3.00
Alternate air door on FAB
Details
       

 04-13-2015
4.00
More throttle quadrant, start FAB
Details
       

 04-12-2015
4.00
Quadrant & cable install, governor work
Details
       

 04-10-2015
3.00
Alternator, control cable install-1
Details
       

 04-09-2015
5.00
Connected breather tube, all fuel lines
Details
       

 04-08-2015
6.00
Mount fuel servo, mixture & throttle brackets
Details
       

 01-19-2015
1.00
Install F/W pass thru for wires
Details
       

 12-22-2013
1.00
Torque engine mount bolts, add firebarrier sealant
Details
       

 12-14-2013
1.00
Eyeballs-5
Details
       

 12-13-2013
1.00
Eyeballs-4
Details
       

 12-02-2013
1.00
Eyeballs-3
Details
       

 12-01-2013
1.00
Eyeballs-2
Details
       

 11-30-2013
1.00
Eyeballs-1
Details
       

 11-24-2013
2.00
Starter relay-1
Details
       

 11-18-2013
1.00
Finished VA-168 manifold, added oil & fuel lines
Details
       

 11-17-2013
1.00
Mounting VA-168 manifold
Details
       

 11-16-2013
1.00
Mount Heat Selector Valve, fab mount for VA-168
Details
       

 11-14-2013
1.00
FWF Kit arrives
Details
       

 11-12-2013
1.00
Added Fire Barrier -Brake Resevoir & Battery Post
Details
       

 07-26-2013
0.50
Motor mount install-3
Details
     

 07-25-2013
1.00
Motor mount install-2
Details
       

 07-20-2013
3.00
Motor mount install-1
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.